Three-Phase EV Charging Cables

Three-phase cables deliver 11kW or 22kW, three times the speed of single-phase, provided the property has a three-phase supply feeding the wallbox. Most UK homes do not. Commercial sites, fleet depots and new-build estates often do.

Three-phase supply required. Three-phase electricity is rare in UK domestic settings, and most homes are single-phase. Check with a qualified electrician before ordering. A three-phase wallbox on a single-phase supply will not work at full speed and may not work at all.

190 productsAll in UK stock
Three-Phase EV Charging Cables for UK EV owners

Which car is it?

We'll preselect the variant that fits.

We read your charge port, max AC rate and phase from DVLA data, then take you to the exact variant.

Products

190 products

Matching cable power to wallbox and supply

Three-phase EV charging cables (11kW or 22kW) unlock the maximum AC charging speeds available from UK home wallboxes. The catch is that three-phase domestic supply is rare in the UK (mostly newer-build homes, larger detached properties, or commercial-converted-to-residential). Most UK homes won't benefit. The minority that will, get 1.5-3× faster home charging.

Single-phase vs three-phase: the basics

UK domestic electricity is supplied either as single-phase (one live conductor at 230V, typical 100A fuse) or three-phase (three live conductors, each 230V, often 80A or 100A per phase). Single-phase is the default for nearly every UK home. Three-phase is the default for commercial and industrial buildings, and an option for newer or larger residential properties.

Three-phase delivers more total power: 3 × 230V × 32A = 22kW, vs single-phase's 1 × 230V × 32A = 7.4kW. For EV charging, the difference is direct: a 22kW three-phase wallbox charges three times faster than a 7kW single-phase wallbox, given a car that can accept it.

How to know if you have three-phase

Check your meter cabinet: a three-phase meter has three live cables coming in (typically labelled L1, L2, L3) plus a neutral. A single-phase meter has one live and a neutral. If you don't know, you almost certainly have single-phase, three-phase domestic in the UK is rare enough that most owners would know.

Confirm with a qualified electrician before ordering a three-phase wallbox or cable. The £200-400 for a survey is well-spent vs ordering kit that can't be used.

Cable variants in this collection

  • 11kW (16A 3-phase): middle option. Right answer for three-phase homes with EVs that cap at 11kW AC (BMW, VW Group, Mercedes, Tesla, Polestar, most of the market).
  • 22kW (32A 3-phase): full three-phase. Right answer for three-phase homes with EVs that accept 22kW AC (Renault Zoe, Audi e-tron with charger upgrade, some Mercedes EQ models, Porsche Taycan with the 22kW option).

Connector: Type 2 with all phases active

Type 2 (Mennekes): same connector as single-phase. The three phase pins are present in the connector body but unused on single-phase cables. Three-phase cables wire all three. The connector is identical from the outside; only the internal wiring differs.

EVs by AC max

Most modern EVs cap at 11kW AC even when the car is sold as "three-phase capable":

  • 11kW max: BMW (all current i-models), VW ID.3/4/5/7, Audi Q4/Q6 e-tron, Mercedes EQA/EQB/EQE, Tesla Model 3/Y, Polestar 2/3/4, Volvo EX30/XC40, Hyundai Ioniq 5/6, Kia EV6/9.
  • 22kW max: Renault Zoe (R135 onwards), Audi e-tron (with optional 22kW charger upgrade), some Mercedes EQS variants, Porsche Taycan (with the 22kW option), older Tesla Model S/X with dual-charger upgrade.

So if you have a Tesla Model 3 or BMW iX, an 11kW cable on three-phase supply = 11kW charging. A 22kW cable = still 11kW (car-side bottleneck). The cable rating is the upper limit; the car's onboard charger is the actual draw.

Charging speed maths

  • 7.4kW single-phase: ~25-30 miles/hour, 8 hours for full 60kWh battery.
  • 11kW three-phase: ~40-45 miles/hour, 5 hours for 60kWh.
  • 22kW three-phase: ~80-90 miles/hour, 2.5-3 hours for 60kWh.

Build and length

Three-phase cables are 30-50% heavier than single-phase equivalents at the same length. Pick the shortest length that works:

  • 5m or 7.5m for tight driveways.
  • 10m for typical layouts.
  • 15m+ only when genuinely needed; 15m three-phase 22kW is 8-10kg.

Three-phase wallboxes

Pair a three-phase cable with one of: MyEnergi Zappi 22kW (solar-integrated), Easee One 22kW (load-balancing), Wallbox Pulsar Plus 22kW, Project EV Pro Earth 22kW (value).

Upgrading to three-phase: when it makes sense

The DNO upgrade from single to three-phase costs £3,000-8,000 and takes 6-16 weeks. It rarely makes sense purely for EV charging: the 1-2 hour overnight saving on a typical commuter EV doesn't justify the capex. It makes more sense if you're also adding heat pumps, induction hobs, ASHPs and home batteries that all benefit from three-phase distribution.

Questions

Will my wallbox use the full speed of this cable?
Only if the wallbox is rated equal or higher. A 32A cable on a 16A wallbox throttles to 16A. Check your wallbox spec: most UK home wallboxes are 32A (7kW) or 32A three-phase (22kW).
Do I have a three-phase supply?
Most UK domestic supplies are single-phase. If you're not sure, check your distribution board or ask a qualified electrician. Single-phase = one live wire; three-phase = three live wires (typically only newer or larger UK builds).
Will a higher-power cable damage my car?
No. The car requests current from the cable based on what it can accept. A 32A cable on a car that asks for 16A simply delivers 16A.
How long does delivery take?
In-stock items ship same-day if ordered before 16:00 on a working day. Standard delivery is next-working-day across mainland UK. Northern Ireland, Channel Islands and remote Highlands take 2-3 working days. Free delivery on orders over £150.
What warranty do these come with?
Every product on our shelf carries a minimum two-year manufacturer warranty. We administer warranty claims directly: ship the replacement next-day and collect the original at no cost to you.