Leeds Skelton Lake on the M1 is the best motorway service area in the UK to charge an electric car, scoring 94.0 out of 100. Clacket Lane on the M25 is the worst at 25.2. Our mystery shoppers made 160 visits to 40 service areas between 15 and 28 September 2026. They paid an average of 84p per kWh, waited 7 minutes on average and found 9.4% of high-power bays out of service.
By the EV Cable Hub Research Team. Data: 160 mystery-shop visits to 40 UK motorway service areas (four per site, at four set times), 480 plug-in attempts and 2,896 bay observations, 15 to 28 September 2026. Last updated November 2026. How we worked this out
Key findings
- Leeds Skelton Lake charged 72p/kWh, started all 12 plug-in attempts first time and kept shoppers waiting 1.8 minutes on average.
- Clacket Lane charged 89p/kWh, started 7 of 12 attempts first time, had 29.2% of bays out of service and the longest average wait in the survey: 19.0 minutes.
- Adding 100 miles at the motorway average costs £24.00, against £17.31 in a 45mpg petrol car and £2.14 on an overnight home tariff.
- Payment and app failures caused 31.3% of the 67 failed starts, more than any other cause.
- Waits averaged 11.6 minutes at weekend peak times and 3.1 minutes on weekday mornings.
- The four M25 service areas averaged 44.8 out of 100, the lowest of any motorway. Three of them finished in the bottom four.
| Rank | Service area | Motorway (junction) | Network used | Score /100 | Price paid | Started first time | Bays out of service | Average wait |
|---|---|---|---|---|---|---|---|---|
| 1 | Leeds Skelton Lake | M1 (J45) | Tesla | 94.0 | 72p | 100% | 2.5% | 1.8 min |
| 2 | Gretna Green | A74(M) (J22) | Tesla | 88.7 | 73p | 92% | 4.7% | 1.8 min |
| 3 | Wetherby | A1(M) (J46) | Tesla | 86.8 | 72p | 92% | 6.2% | 3.5 min |
| 4 | Cobham | M25 (J9-10) | Tesla | 85.5 | 72p | 92% | 3.4% | 5.0 min |
| 5 | Rugby | M6 (J1) | Ionity | 84.1 | 79p | 100% | 4.2% | 2.3 min |
| 6 | Abington | M74 (J13) | Gridserve Electric Highway | 80.9 | 85p | 100% | 0.0% | 0.8 min |
| 7 | Gloucester | M5 (J11a-12) | Osprey | 80.8 | 82p | 100% | 3.6% | 2.3 min |
| 8 | Exeter | M5 (J30) | Ionity | 80.8 | 79p | 100% | 5.0% | 4.3 min |
| 9 | Tebay | M6 (J38-39) | InstaVolt | 77.6 | 86p | 100% | 2.5% | 1.5 min |
| 10 | Beaconsfield | M40 (J2) | Ionity | 76.2 | 79p | 92% | 5.9% | 5.0 min |
| 11 | Donington Park | M1 (J23a) | Ionity | 74.7 | 80p | 92% | 6.8% | 5.0 min |
| 12 | Washington | A1(M) (J64) | Osprey | 72.0 | 84p | 92% | 6.2% | 3.8 min |
| 13 | Lancaster | M6 (J32-33) | Gridserve Electric Highway | 71.0 | 86p | 92% | 5.4% | 3.0 min |
| 14 | Chieveley | M4 (J13) | Ionity | 70.0 | 79p | 83% | 8.3% | 6.5 min |
| 15 | Ferrybridge | M62/A1(M) (J33) | BP Pulse | 68.7 | 87p | 92% | 5.4% | 3.8 min |
| 16 | Winchester | M3 (J8-9) | Gridserve Electric Highway | 68.5 | 86p | 92% | 5.2% | 4.8 min |
| 17 | Hilton Park | M6 (J10a-11) | Gridserve Electric Highway | 67.0 | 86p | 92% | 6.9% | 5.3 min |
| 18 | Oxford | M40 (J8a) | Gridserve Electric Highway | 66.4 | 86p | 92% | 6.8% | 5.8 min |
| 19 | Leigh Delamere | M4 (J17-18) | Gridserve Electric Highway | 66.1 | 86p | 92% | 7.5% | 5.8 min |
| 20 | Magor | M4 (J23a) | InstaVolt | 64.9 | 88p | 92% | 8.3% | 4.8 min |
| 21 | Knutsford | M6 (J18-19) | InstaVolt | 64.7 | 88p | 92% | 7.8% | 5.0 min |
| 22 | Reading | M4 (J11-12) | Gridserve Electric Highway | 63.5 | 86p | 92% | 9.4% | 7.0 min |
| 23 | Fleet | M3 (J4a-5) | Gridserve Electric Highway | 63.3 | 86p | 92% | 10.0% | 7.0 min |
| 24 | Warwick | M40 (J12-13) | Fastned | 62.8 | 82p | 83% | 12.5% | 8.0 min |
| 25 | Stafford | M6 (J14-15) | Shell Recharge | 61.3 | 87p | 83% | 10.4% | 5.5 min |
| 26 | Cherwell Valley | M40 (J10) | Gridserve Electric Highway | 61.1 | 86p | 83% | 7.7% | 7.0 min |
| 27 | Toddington | M1 (J11a-12) | Gridserve Electric Highway | 58.0 | 86p | 83% | 12.5% | 8.0 min |
| 28 | Keele | M6 (J15-16) | Gridserve Electric Highway | 57.3 | 86p | 83% | 14.6% | 8.0 min |
| 29 | Tibshelf | M1 (J28-29) | BP Pulse | 55.3 | 87p | 83% | 14.6% | 8.5 min |
| 30 | Membury | M4 (J14-15) | Gridserve Electric Highway | 54.9 | 86p | 83% | 15.0% | 9.5 min |
| 31 | Strensham | M5 (J7-8) | InstaVolt | 52.4 | 89p | 83% | 15.0% | 8.8 min |
| 32 | Leicester Forest East | M1 (J21-21a) | Gridserve Electric Highway | 50.3 | 86p | 75% | 15.6% | 10.5 min |
| 33 | Woodall | M1 (J30-31) | Gridserve Electric Highway | 49.8 | 86p | 75% | 18.8% | 10.3 min |
| 34 | Corley | M6 (J3-3a) | Gridserve Electric Highway | 48.1 | 86p | 75% | 20.8% | 11.0 min |
| 35 | Charnock Richard | M6 (J27-28) | Gridserve Electric Highway | 46.2 | 86p | 75% | 20.8% | 12.3 min |
| 36 | Newport Pagnell | M1 (J14-15) | Gridserve Electric Highway | 46.1 | 86p | 75% | 18.8% | 12.8 min |
| 37 | Thurrock | M25 (J30-31) | BP Pulse | 38.2 | 87p | 67% | 25.0% | 14.3 min |
| 38 | Watford Gap | M1 (J16-17) | InstaVolt | 33.8 | 89p | 67% | 30.0% | 14.8 min |
| 39 | South Mimms | M25 (J23) | Shell Recharge | 30.2 | 89p | 58% | 22.2% | 16.8 min |
| 40 | Clacket Lane | M25 (J5-6) | InstaVolt | 25.2 | 89p | 58% | 29.2% | 19.0 min |
| Score out of 100: price (30), reliability (40), wait (30). Price paid is the average pay-as-you-go rate per kWh incl. 20% VAT on the largest network on site. Source: EV Cable Hub Motorway Charging Index 2026, 160 mystery-shop visits, 15 to 28 September 2026. | ||||||||
What separates the best from the worst
The top four all have one thing in common. The shopper paid on Tesla's Supercharger network, open to any EV, at 72p or 73p a kWh, and each site has plenty of bays. Leeds Skelton Lake has 40 and Cobham 44, the largest site we visited. Rugby, in fifth, charged 79p on Ionity but started every attempt first time with a 2.3-minute average wait.
Price alone does not settle the ranking. Abington on the M74 charged 85p, yet came sixth: no bays out of service across four visits and the shortest wait in the survey, 0.8 minutes. Tebay, ninth at 86p, had the second-shortest wait.
The bottom of the table is where everything goes wrong at once. Clacket Lane, South Mimms, Watford Gap and Thurrock all charged 87p to 89p, failed a third or more of their plug-in attempts and had a quarter or more of their bays out of action. At Clacket Lane, the average weekend peak wait was 27 minutes.
Source: EV Cable Hub Motorway Charging Index 2026, 160 mystery-shop visits, 15 to 28 September 2026.
The price: 84p a kWh, 7p over the rest of the network
Our shoppers paid an average of 84p/kWh at motorway services, 7p more than the 77p average at rapid and ultra-rapid sites away from the motorway, a 9.1% premium. That matches our UK Public Charging Price Index for Q3 2026. Prices paid ranged from 72p at the four Tesla sites to 89p at Strensham, Watford Gap, South Mimms and Clacket Lane.
At 84p, a 10 to 80% charge of a 64kWh battery costs £37.63. At 72p it costs £32.26; at 89p, £39.87. The practical move on a long trip is to plan your stop for a site at the top of the table rather than whichever services you reach when the battery runs low.
| How you charge or fuel | Price | Cost to add 100 miles |
|---|---|---|
| Cheapest motorway site (Tesla network) | 72p/kWh | £20.57 |
| Motorway average | 84p/kWh | £24.00 |
| Dearest motorway sites | 89p/kWh | £25.43 |
| Off-motorway rapid and ultra-rapid | 77p/kWh | £22.00 |
| Petrol car, 45mpg | 171.4p/litre | £17.31 |
| Home, overnight EV tariff | 7.5p/kWh | £2.14 |
| At 3.5 miles per kWh. Source: EV Cable Hub Motorway Charging Index 2026, 160 mystery-shop visits, 15 to 28 September 2026. | ||
Reliability: 86% started first time
Our shoppers made 480 plug-in attempts, three at each visit, and 413 started first time. Of the 67 that did not, 61.2% worked on a second try at the same bay, 28.4% after moving to another bay on the same network and 10.4% only on a different network. Nobody was left unable to charge, but a failed start added several minutes each time.
| Cause of failure | Failed attempts | Share of failures |
|---|---|---|
| Payment or app failure (card declined, app timed out, dead QR link) | 21 | 31.3% |
| Charger and car failed to communicate | 17 | 25.4% |
| Unit showed available but faulted on plug-in | 12 | 17.9% |
| Session started then stopped within two minutes | 9 | 13.4% |
| Damaged connector or cable | 5 | 7.5% |
| Screen unresponsive | 3 | 4.5% |
| Total | 67 | 100.0% |
| Source: EV Cable Hub Motorway Charging Index 2026, 160 mystery-shop visits, 15 to 28 September 2026. | ||
9.4% of high-power bays were out of service across 2,896 bay observations. Watford Gap was the worst at 30.0%, and Abington the only site with none down on any visit. Bigger sites coped better. The six with 25 or more high-power bays averaged 81.3 out of 100, a 4.1-minute wait and 4.7% of bays down; the 13 with 12 or fewer averaged 54.4, 8.8 minutes and 15.4%.
Waiting: 3 minutes or 12, depending on when you arrive
| Visit slot | Average wait | Visits where the shopper queued | Longest wait |
|---|---|---|---|
| Weekday peak (16:00 to 19:00) | 9.8 min | 60.0% | 27 min |
| Weekday off-peak (10:00 to 12:00) | 3.1 min | 15.0% | 12 min |
| Weekend peak (Sat 10:00 to 14:00, Sun 14:00 to 18:00) | 11.6 min | 67.5% | 27 min |
| Weekend off-peak (07:00 to 09:00) | 3.5 min | 10.0% | 10 min |
| All visits | 7.0 min | 38.1% | 27 min |
| Source: EV Cable Hub Motorway Charging Index 2026, 160 mystery-shop visits, 15 to 28 September 2026. | |||
When you stop matters almost as much as where. A weekday morning or a weekend start before 9am cut the average wait to about 3 minutes, and shoppers queued on only one visit in eight. At weekend peak times two in three queued. Even the best sites slowed then, though Leeds Skelton Lake's weekend peak wait was still only 4 minutes.
By operator and network
Extra's three sites averaged 85.2 out of 100, the best of any service area operator, followed by Westmorland's two at 79.2. Moto ran 17 of the 40 sites and averaged 68.0; Welcome Break's 13 averaged 57.3; Roadchef's four, 41.7, with 22.2% of bays out of service.
By the network our shoppers paid on, the four Tesla sites averaged 88.8, Ionity's five 77.2 and Osprey's two 76.4. Gridserve Electric Highway, the largest network at 17 sites, averaged 59.9. Regionally, Scotland's two sites averaged 84.8 and the South East's 14 sites 57.6.
How we worked this out
Mystery shoppers in EVs visited each of 40 motorway service areas four times between 15 and 28 September 2026: weekday peak, weekday off-peak, weekend peak and weekend off-peak. At each visit they recorded the wait from arrival to charging, counted every high-power bay and whether it was in service, and made three plug-in attempts, paying pay-as-you-go on the largest network on site. Each site is scored out of 100: price (30 points), reliability (40, from first-time starts and bays in service) and wait (30). Costs per 100 miles assume 3.5 miles per kWh.
Motorway charging: your questions answered
Which motorway services are best for EV charging?
Leeds Skelton Lake on the M1 ranked first in our 2026 index with 94.0 out of 100, followed by Gretna Green (A74(M)), Wetherby (A1(M)), Cobham (M25) and Rugby (M6).
Which motorway services are worst for EV charging?
Clacket Lane on the M25 ranked 40th of 40 with 25.2 out of 100: 89p/kWh, 7 of 12 attempts started first time, 29.2% of bays out of service and a 19.0-minute average wait.
How much does it cost to charge at motorway services?
Our shoppers paid 84p/kWh on average in September 2026, 7p more than at off-motorway rapid sites. Adding 100 miles costs £24.00, and a 10 to 80% charge of a 64kWh battery £37.63.
Are motorway chargers reliable?
86% of plug-in attempts started first time across 40 service areas in 2026, and 9.4% of high-power bays were out of service. Payment and app problems caused 31.3% of failed starts.
When is the best time to charge at motorway services?
Weekday mornings and early weekend mornings, when the average wait was about 3 minutes. Weekend peak times averaged 11.6 minutes, with waits of up to 27 minutes.
A plain-text Markdown copy of this article, with every figure, table and source, for AI agents and analysts.
Free to reuse with a followed link to this page. Research licence