Motorway Services EV Charging Ranked: Price, Reliability and Wait Times (2026)

Leeds Skelton Lake is the best UK motorway service area to charge an EV and Clacket Lane the worst. 40 sites scored on price, reliability and waits from 160 mystery-shop visits in September 2026.

Leeds Skelton Lake on the M1 is the best motorway service area in the UK to charge an electric car, scoring 94.0 out of 100. Clacket Lane on the M25 is the worst at 25.2. Our mystery shoppers made 160 visits to 40 service areas between 15 and 28 September 2026. They paid an average of 84p per kWh, waited 7 minutes on average and found 9.4% of high-power bays out of service.

84p/kWhAverage price paid at motorway services, 2026
86%Charge attempts that started first time
7 minutesAverage wait from arrival to charging

By the EV Cable Hub Research Team. Data: 160 mystery-shop visits to 40 UK motorway service areas (four per site, at four set times), 480 plug-in attempts and 2,896 bay observations, 15 to 28 September 2026. Last updated November 2026. How we worked this out

Key findings

  • Leeds Skelton Lake charged 72p/kWh, started all 12 plug-in attempts first time and kept shoppers waiting 1.8 minutes on average.
  • Clacket Lane charged 89p/kWh, started 7 of 12 attempts first time, had 29.2% of bays out of service and the longest average wait in the survey: 19.0 minutes.
  • Adding 100 miles at the motorway average costs £24.00, against £17.31 in a 45mpg petrol car and £2.14 on an overnight home tariff.
  • Payment and app failures caused 31.3% of the 67 failed starts, more than any other cause.
  • Waits averaged 11.6 minutes at weekend peak times and 3.1 minutes on weekday mornings.
  • The four M25 service areas averaged 44.8 out of 100, the lowest of any motorway. Three of them finished in the bottom four.
Rank Service area Motorway (junction) Network used Score /100 Price paid Started first time Bays out of service Average wait
1 Leeds Skelton Lake M1 (J45) Tesla 94.0 72p 100% 2.5% 1.8 min
2 Gretna Green A74(M) (J22) Tesla 88.7 73p 92% 4.7% 1.8 min
3 Wetherby A1(M) (J46) Tesla 86.8 72p 92% 6.2% 3.5 min
4 Cobham M25 (J9-10) Tesla 85.5 72p 92% 3.4% 5.0 min
5 Rugby M6 (J1) Ionity 84.1 79p 100% 4.2% 2.3 min
6 Abington M74 (J13) Gridserve Electric Highway 80.9 85p 100% 0.0% 0.8 min
7 Gloucester M5 (J11a-12) Osprey 80.8 82p 100% 3.6% 2.3 min
8 Exeter M5 (J30) Ionity 80.8 79p 100% 5.0% 4.3 min
9 Tebay M6 (J38-39) InstaVolt 77.6 86p 100% 2.5% 1.5 min
10 Beaconsfield M40 (J2) Ionity 76.2 79p 92% 5.9% 5.0 min
11 Donington Park M1 (J23a) Ionity 74.7 80p 92% 6.8% 5.0 min
12 Washington A1(M) (J64) Osprey 72.0 84p 92% 6.2% 3.8 min
13 Lancaster M6 (J32-33) Gridserve Electric Highway 71.0 86p 92% 5.4% 3.0 min
14 Chieveley M4 (J13) Ionity 70.0 79p 83% 8.3% 6.5 min
15 Ferrybridge M62/A1(M) (J33) BP Pulse 68.7 87p 92% 5.4% 3.8 min
16 Winchester M3 (J8-9) Gridserve Electric Highway 68.5 86p 92% 5.2% 4.8 min
17 Hilton Park M6 (J10a-11) Gridserve Electric Highway 67.0 86p 92% 6.9% 5.3 min
18 Oxford M40 (J8a) Gridserve Electric Highway 66.4 86p 92% 6.8% 5.8 min
19 Leigh Delamere M4 (J17-18) Gridserve Electric Highway 66.1 86p 92% 7.5% 5.8 min
20 Magor M4 (J23a) InstaVolt 64.9 88p 92% 8.3% 4.8 min
21 Knutsford M6 (J18-19) InstaVolt 64.7 88p 92% 7.8% 5.0 min
22 Reading M4 (J11-12) Gridserve Electric Highway 63.5 86p 92% 9.4% 7.0 min
23 Fleet M3 (J4a-5) Gridserve Electric Highway 63.3 86p 92% 10.0% 7.0 min
24 Warwick M40 (J12-13) Fastned 62.8 82p 83% 12.5% 8.0 min
25 Stafford M6 (J14-15) Shell Recharge 61.3 87p 83% 10.4% 5.5 min
26 Cherwell Valley M40 (J10) Gridserve Electric Highway 61.1 86p 83% 7.7% 7.0 min
27 Toddington M1 (J11a-12) Gridserve Electric Highway 58.0 86p 83% 12.5% 8.0 min
28 Keele M6 (J15-16) Gridserve Electric Highway 57.3 86p 83% 14.6% 8.0 min
29 Tibshelf M1 (J28-29) BP Pulse 55.3 87p 83% 14.6% 8.5 min
30 Membury M4 (J14-15) Gridserve Electric Highway 54.9 86p 83% 15.0% 9.5 min
31 Strensham M5 (J7-8) InstaVolt 52.4 89p 83% 15.0% 8.8 min
32 Leicester Forest East M1 (J21-21a) Gridserve Electric Highway 50.3 86p 75% 15.6% 10.5 min
33 Woodall M1 (J30-31) Gridserve Electric Highway 49.8 86p 75% 18.8% 10.3 min
34 Corley M6 (J3-3a) Gridserve Electric Highway 48.1 86p 75% 20.8% 11.0 min
35 Charnock Richard M6 (J27-28) Gridserve Electric Highway 46.2 86p 75% 20.8% 12.3 min
36 Newport Pagnell M1 (J14-15) Gridserve Electric Highway 46.1 86p 75% 18.8% 12.8 min
37 Thurrock M25 (J30-31) BP Pulse 38.2 87p 67% 25.0% 14.3 min
38 Watford Gap M1 (J16-17) InstaVolt 33.8 89p 67% 30.0% 14.8 min
39 South Mimms M25 (J23) Shell Recharge 30.2 89p 58% 22.2% 16.8 min
40 Clacket Lane M25 (J5-6) InstaVolt 25.2 89p 58% 29.2% 19.0 min
Score out of 100: price (30), reliability (40), wait (30). Price paid is the average pay-as-you-go rate per kWh incl. 20% VAT on the largest network on site. Source: EV Cable Hub Motorway Charging Index 2026, 160 mystery-shop visits, 15 to 28 September 2026.
Table 1: Motorway services EV charging ranked, 2026

What separates the best from the worst

The top four all have one thing in common. The shopper paid on Tesla's Supercharger network, open to any EV, at 72p or 73p a kWh, and each site has plenty of bays. Leeds Skelton Lake has 40 and Cobham 44, the largest site we visited. Rugby, in fifth, charged 79p on Ionity but started every attempt first time with a 2.3-minute average wait.

Price alone does not settle the ranking. Abington on the M74 charged 85p, yet came sixth: no bays out of service across four visits and the shortest wait in the survey, 0.8 minutes. Tebay, ninth at 86p, had the second-shortest wait.

The bottom of the table is where everything goes wrong at once. Clacket Lane, South Mimms, Watford Gap and Thurrock all charged 87p to 89p, failed a third or more of their plug-in attempts and had a quarter or more of their bays out of action. At Clacket Lane, the average weekend peak wait was 27 minutes.

A74(M) (1 site)88.7
M74 (1)80.9
A1(M) (2)79.4
M5 (3)71.3
M62/A1(M) (1)68.7
M40 (4)66.6
M3 (2)65.9
M6 (9)64.1
M4 (5)63.9
M1 (8)57.8
M25 (4)44.8

Source: EV Cable Hub Motorway Charging Index 2026, 160 mystery-shop visits, 15 to 28 September 2026.

Chart 1: Average score by motorway, 2026

The price: 84p a kWh, 7p over the rest of the network

Our shoppers paid an average of 84p/kWh at motorway services, 7p more than the 77p average at rapid and ultra-rapid sites away from the motorway, a 9.1% premium. That matches our UK Public Charging Price Index for Q3 2026. Prices paid ranged from 72p at the four Tesla sites to 89p at Strensham, Watford Gap, South Mimms and Clacket Lane.

At 84p, a 10 to 80% charge of a 64kWh battery costs £37.63. At 72p it costs £32.26; at 89p, £39.87. The practical move on a long trip is to plan your stop for a site at the top of the table rather than whichever services you reach when the battery runs low.

How you charge or fuel Price Cost to add 100 miles
Cheapest motorway site (Tesla network) 72p/kWh £20.57
Motorway average 84p/kWh £24.00
Dearest motorway sites 89p/kWh £25.43
Off-motorway rapid and ultra-rapid 77p/kWh £22.00
Petrol car, 45mpg 171.4p/litre £17.31
Home, overnight EV tariff 7.5p/kWh £2.14
At 3.5 miles per kWh. Source: EV Cable Hub Motorway Charging Index 2026, 160 mystery-shop visits, 15 to 28 September 2026.
Table 2: Cost to add 100 miles, motorway charging against the alternatives, 2026

Reliability: 86% started first time

Our shoppers made 480 plug-in attempts, three at each visit, and 413 started first time. Of the 67 that did not, 61.2% worked on a second try at the same bay, 28.4% after moving to another bay on the same network and 10.4% only on a different network. Nobody was left unable to charge, but a failed start added several minutes each time.

Cause of failure Failed attempts Share of failures
Payment or app failure (card declined, app timed out, dead QR link) 21 31.3%
Charger and car failed to communicate 17 25.4%
Unit showed available but faulted on plug-in 12 17.9%
Session started then stopped within two minutes 9 13.4%
Damaged connector or cable 5 7.5%
Screen unresponsive 3 4.5%
Total 67 100.0%
Source: EV Cable Hub Motorway Charging Index 2026, 160 mystery-shop visits, 15 to 28 September 2026.
Table 3: Why charge attempts failed first time, 2026

9.4% of high-power bays were out of service across 2,896 bay observations. Watford Gap was the worst at 30.0%, and Abington the only site with none down on any visit. Bigger sites coped better. The six with 25 or more high-power bays averaged 81.3 out of 100, a 4.1-minute wait and 4.7% of bays down; the 13 with 12 or fewer averaged 54.4, 8.8 minutes and 15.4%.

Waiting: 3 minutes or 12, depending on when you arrive

Visit slot Average wait Visits where the shopper queued Longest wait
Weekday peak (16:00 to 19:00) 9.8 min 60.0% 27 min
Weekday off-peak (10:00 to 12:00) 3.1 min 15.0% 12 min
Weekend peak (Sat 10:00 to 14:00, Sun 14:00 to 18:00) 11.6 min 67.5% 27 min
Weekend off-peak (07:00 to 09:00) 3.5 min 10.0% 10 min
All visits 7.0 min 38.1% 27 min
Source: EV Cable Hub Motorway Charging Index 2026, 160 mystery-shop visits, 15 to 28 September 2026.
Table 4: Wait by time of visit, 2026

When you stop matters almost as much as where. A weekday morning or a weekend start before 9am cut the average wait to about 3 minutes, and shoppers queued on only one visit in eight. At weekend peak times two in three queued. Even the best sites slowed then, though Leeds Skelton Lake's weekend peak wait was still only 4 minutes.

By operator and network

Extra's three sites averaged 85.2 out of 100, the best of any service area operator, followed by Westmorland's two at 79.2. Moto ran 17 of the 40 sites and averaged 68.0; Welcome Break's 13 averaged 57.3; Roadchef's four, 41.7, with 22.2% of bays out of service.

By the network our shoppers paid on, the four Tesla sites averaged 88.8, Ionity's five 77.2 and Osprey's two 76.4. Gridserve Electric Highway, the largest network at 17 sites, averaged 59.9. Regionally, Scotland's two sites averaged 84.8 and the South East's 14 sites 57.6.

How we worked this out

Mystery shoppers in EVs visited each of 40 motorway service areas four times between 15 and 28 September 2026: weekday peak, weekday off-peak, weekend peak and weekend off-peak. At each visit they recorded the wait from arrival to charging, counted every high-power bay and whether it was in service, and made three plug-in attempts, paying pay-as-you-go on the largest network on site. Each site is scored out of 100: price (30 points), reliability (40, from first-time starts and bays in service) and wait (30). Costs per 100 miles assume 3.5 miles per kWh.

Motorway charging: your questions answered

Which motorway services are best for EV charging?

Leeds Skelton Lake on the M1 ranked first in our 2026 index with 94.0 out of 100, followed by Gretna Green (A74(M)), Wetherby (A1(M)), Cobham (M25) and Rugby (M6).

Which motorway services are worst for EV charging?

Clacket Lane on the M25 ranked 40th of 40 with 25.2 out of 100: 89p/kWh, 7 of 12 attempts started first time, 29.2% of bays out of service and a 19.0-minute average wait.

How much does it cost to charge at motorway services?

Our shoppers paid 84p/kWh on average in September 2026, 7p more than at off-motorway rapid sites. Adding 100 miles costs £24.00, and a 10 to 80% charge of a 64kWh battery £37.63.

Are motorway chargers reliable?

86% of plug-in attempts started first time across 40 service areas in 2026, and 9.4% of high-power bays were out of service. Payment and app problems caused 31.3% of failed starts.

When is the best time to charge at motorway services?

Weekday mornings and early weekend mornings, when the average wait was about 3 minutes. Weekend peak times averaged 11.6 minutes, with waits of up to 27 minutes.

Data and summary for agents