Network Index

UK Public Charging Networks Compared 2026: All 68 Networks Scored, Ranked and Published in Full

The EV Cable Hub UK Charging Network Index scored all 68 UK public charging networks in 2026 across coverage, reliability, price, payment access and speed. InstaVolt led on 84.2 points of 100. The full method, the full ranking and 26 data tables.

Uk Charging Networks Compared

EV Cable Hub UK Charging Network Index · 2026 flagship edition · Fourth edition · Data as at 30 June 2026 · Updated twice yearly · 400+ data points

The EV Cable Hub UK Charging Network Index scored all 68 UK public charging networks in 2026 across coverage, reliability, price, payment access and speed. InstaVolt led on 84.2 points of 100, ahead of Fastned on 82.6 and Tesla Supercharger on 81.9. Across the whole network, 93.1% of charging attempts succeeded at the first try, ad-hoc prices ranged from 45p to 89p per kWh, and 34.6% of devices accepted a contactless card. This is the fourth edition of the index, and the complete dataset behind it.

68UK public charging networks scored in 2026
84.2Highest network score of 100, InstaVolt
93.1%Mean successful-first-attempt rate across all networks
44pSpread between the cheapest and most expensive large network
34.6%Share of devices accepting a contactless card
63.4Mean network score of 100

The 2026 headline rankings#

InstaVolt led the EV Cable Hub UK Charging Network Index 2026 with 84.2 points of 100, ahead of Fastned on 82.6 and Tesla Supercharger on 81.9. The mean score across all 68 UK networks was 63.4, and the gap between the highest and lowest scoring network was 48.6 points.

The index measures one thing: the network as a service to a driver standing in front of one of its devices. Can you reach it, does it work, what does it cost, can you pay for it, and how fast does it charge. Those five questions are the five pillars, they carry 25, 25, 20, 15 and 15 points respectively, and the whole method is published in the next section before a single ranking is defended.

It is worth being equally explicit about what the index does not measure, because being clear about scope is what stops a ranking being attacked for something it never claimed to do. It does not measure customer service quality, brand recognition, app design, corporate ownership, funding structure or announced expansion. Those things matter to some readers. Not one of them can be measured consistently across 68 operators, and a score built partly on things that cannot be measured consistently is not a score, it is an opinion with a number attached.

Three structural findings come out of the 2026 table. The top of the ranking is dominated by networks that operate ultra-rapid devices only, because those networks are strongest on the two pillars carrying the most weight. The largest networks by device count sit in the middle of the table rather than the top, because coverage is worth 25 points and not 100. And the gap between the top ten and the bottom ten of the scored field is widest on reliability, not on price, which is the opposite of where most comparison of charging networks concentrates.

The EV Cable Hub UK Charging Network Index 2026 scored six networks at 75 points or above and 14 below 50. The median score of 61.8 sits below the mean of 63.4, which tells you the distribution has a longer tail downwards than upwards: a small number of networks score very poorly and pull the mean below the middle of the field rather than above it.

One convention runs through every table on this page and it is worth stating before the first ranking. A device is a single unit a driver can drive up to. A connector is a single plug on that unit, and many devices carry two or three. The UK network held 98,340 connectors across the scored field in 2026, materially more than the device count, and published totals that mix the two are the single largest source of confusion in coverage of this market. This page reports devices as its headline unit and publishes connectors as a separate column wherever both are relevant.

Table 1 The 2026 top ten networks
Table 1. The 2026 top ten networks Source: EV Cable Hub Research, 2026 edition.
Rank Network Score /100 Coverage /25 Reliability /25 Price /20 Payment /15 Speed /15 Rank change
1 InstaVolt 84.2 18.4 24.1 14.2 14.2 13.3 +1
2 Fastned 82.6 12.8 24.0 16.4 14.6 14.8 +2
3 Tesla Supercharger 81.9 15.2 24.6 17.4 12.1 12.6 -2
4 GRIDSERVE 79.4 14.1 23.4 14.8 13.8 13.3 +1
5 Osprey 78.8 14.6 23.8 13.6 14.0 12.8 -2
6 IONITY 76.2 9.8 22.6 17.8 12.4 13.6 +3
7 MFG EV Power 74.6 13.2 22.8 13.8 13.4 11.4 +4
8 Applegreen Electric 72.4 11.4 22.1 14.6 13.2 11.1 +2
9 Evyve 71.2 10.2 21.8 14.6 13.0 11.6 +6
10 Shell Recharge 70.8 16.8 21.2 10.4 13.2 9.2 -3
Table 2 Index headline figures, 2026
Table 2. Index headline figures, 2026 Source: EV Cable Hub Research, 2026 edition.
Measure 2026 figure
Networks scored 68
Highest score 84.2 (InstaVolt)
Lowest score 35.6
Mean score 63.4
Median score 61.8
Networks scoring 75 or above 6
Networks scoring 70 or above 10
Networks scoring below 50 14
Mean successful-first-attempt rate, all networks 93.1%
Highest successful-first-attempt rate 99.1%
Lowest successful-first-attempt rate 82.4%
Mean ad-hoc price across networks 59.2p/kWh
Cheapest large-network ad-hoc price 45p/kWh
Most expensive large-network ad-hoc price 89p/kWh
Networks accepting contactless on all rapid devices 26
Networks accepting contactless on no devices 22
Networks offering a subscription 34
Networks in a roaming agreement 47
Networks operating in all 12 UK regions 9
Networks operating in one region only 21
Mean device power across networks 43.5 kW
Highest network mean device power 212 kW
Networks operating charging hubs 24
Networks that ceased trading in the period 1
Networks acquired or merged in the period 7
Pillar composition of each network's total index score, top 20 of 68 networks, EV Cable Hub UK Charging Network Index 2026. Each bar is scaled to that network's own total score, and the figure on each segment is the pillar score in points. Chart 1. Pillar composition of each network's total index score, top 20 of 68 networks, EV Cable Hub UK Charging Network Index 2026. Each bar is scaled to that network's own total score, and the figure on each segment is the pillar score in points. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Coverage /25Reliability /25Price /20Payment /15Speed /15InstaVolt18.424.114.214.213.3Fastned12.82416.414.614.8Tesla Supercharger15.224.617.412.112.6GRIDSERVE14.123.414.813.813.3Osprey14.623.813.61412.8IONITY9.822.617.812.413.6MFG EV Power13.222.813.813.411.4Applegreen Electric11.422.114.613.211.1Evyve10.221.814.61311.6Shell Recharge16.821.210.413.29.2Pod Point17.220.415.810.65.2Milence6.821.415.412.412.4Connected Kerb18.220.116.88.4BP Pulse17.819.210.212.86.8char.gy17.420.617.27.2Alfa Power9.420.815.8126.2Believ15.619.8177.44Mer12.419.614.610.25.6ubitricity19.219.417.64.2Zest10.819.215.410.45.4
Pillar composition of each network's total index score, top 20 of 68 networks, EV Cable Hub UK Charging Network Index 2026. Each bar is scaled to that network's own total score, and the figure on each segment is the pillar score in points. Data: Table 6
Total index score out of 100, top 20 UK charging networks, EV Cable Hub UK Charging Network Index 2026. Chart 2. Total index score out of 100, top 20 UK charging networks, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.InstaVolt84.2Fastned82.6Tesla Supercharger81.9GRIDSERVE79.4Osprey78.8IONITY76.2MFG EV Power74.6Applegreen Electric72.4Evyve71.2Shell Recharge70.8Pod Point69.2Milence68.4Connected Kerb67.6BP Pulse66.8char.gy65.4Alfa Power64.2Believ63.8Mer62.4ubitricity61.8Zest61.2
Total index score out of 100, top 20 UK charging networks, EV Cable Hub UK Charging Network Index 2026. Data: Table 6

How the Network Index is scored#

The EV Cable Hub UK Charging Network Index scores every UK charging network out of 100 across five pillars: coverage worth 25 points, reliability worth 25, price worth 20, payment access worth 15 and speed and connectors worth 15. Each pillar is built from named sub-measures, and every network's pillar scores are published alongside its total.

This is the most important section on the page, and it comes before the ranking on purpose. An unexplained ranking gets dismissed. A fully explained ranking gets argued with, and an argument about a published method is a far better outcome than silence. Everything is here: the pillars, the weights, the sub-measures inside each pillar, the values each sub-measure was normalised against, the tie-break rule and the exclusions.

Coverage is built from device count worth 8 points, location count worth 5, regional spread across the twelve UK regions worth 5, strategic road network presence worth 4 and local authority reach worth 3. Reliability is built from the successful-first-attempt rate worth 12 points, devices out of service at the census date worth 6, mean time to repair worth 4 and sessions ending prematurely worth 3. Price is built from ad-hoc price relative to the mean for that network's own speed mix worth 10, subscription value worth 4, fee transparency worth 3 and additional fee burden worth 3. Payment access and speed carry four sub-measures each, set out in full in the pillar table.

The normalisation is deliberately simple. Each sub-measure is scored on a scale from 0 to 1, where 1 is the best value observed across all 68 networks and 0 is the worst, and that fraction is then multiplied by the sub-measure's weight. Device count is normalised against a best of 12,840 and a worst of 21. The successful-first-attempt rate is normalised against a best of 99.1% and a worst of 82.4%. Mean time to repair runs the other way, with a best of 1.8 days and a worst of 24.6 days. Every one of the 17 normalisation ranges is published in the second table below, so any score can be reconstructed from the raw measures.

Because the scale is relative to the observed field, the scores move as the UK market moves. A network can lose points in a later edition without getting worse, if other networks improve around it. That is the point of an index rather than a rating: it describes a network's position in the 2026 UK market, not an absolute quality that would hold in another country or another year. The mean is published alongside every edition for exactly that reason.

Four things are excluded and the reasons are stated so nobody has to guess. Customer service quality is out because it cannot be measured consistently across 68 operators. App design and user experience are out because they are subjective and change with every software release. Brand recognition is out because it is not a service attribute. Corporate ownership and funding are out because they do not affect the driver at the charge point. Two further exclusions follow the same logic: future expansion commitments, because an announcement is not provision, and renewable energy claims, because they cannot be verified at device level.

There is a minimum threshold and a tie-break rule. A network must operate at least 20 public devices to be scored, which excludes six micro-operators covering 84 devices between them. They are listed with a note in the downloadable dataset rather than silently dropped, because a reader who cannot find an operator should be able to see why. Ties are broken on reliability first and coverage second.

Table 3 Scoring pillars and weights, 2026
Table 3. Scoring pillars and weights, 2026 Source: EV Cable Hub Research, 2026 edition.
Pillar Weight Sub-measures
Coverage 25 points Device count (8), location count (5), regional spread across 12 regions (5), strategic road network presence (4), local authority reach (3)
Reliability 25 points Successful-first-attempt rate (12), devices out of service at census date (6), mean time to repair (4), sessions ending prematurely (3)
Price 20 points Ad-hoc price relative to the mean for that network's speed mix (10), subscription value (4), fee transparency (3), additional fee burden (3)
Payment access 15 points Contactless acceptance (6), app-free payment route available (3), roaming participation (3), price displayed on the unit (3)
Speed and connectors 15 points Mean device power (6), ultra-rapid share of devices (4), connector standards offered (3), connectors per device (2)
Table 4 Sub-measure normalisation, 2026
Table 4. Sub-measure normalisation, 2026 Source: EV Cable Hub Research, 2026 edition.
Sub-measure Best observed Worst observed Direction
Device count 12,840 21 Higher is better
Location count 11,420 8 Higher is better
Regions covered of 12 12 1 Higher is better
Strategic road network sites 318 0 Higher is better
Local authorities reached of 374 218 1 Higher is better
Successful-first-attempt rate 99.1% 82.4% Higher is better
Devices out of service 0.4% 11.8% Lower is better
Mean time to repair 1.8 days 24.6 days Lower is better
Sessions ending prematurely 0.6% 8.4% Lower is better
Ad-hoc price against speed-adjusted mean -21.4% +18.6% Lower is better
Subscription discount 40.5% 0% Higher is better
Additional fee burden per session £0.00 £2.14 Lower is better
Contactless acceptance 100% 0% Higher is better
Roaming platforms carried 6 0 Higher is better
Mean device power 212 kW 3.4 kW Higher is better
Ultra-rapid share of devices 100% 0% Higher is better
Connector standards offered 4 1 Higher is better
Table 5 What the index deliberately excludes
Table 5. What the index deliberately excludes Source: EV Cable Hub Research, 2026 edition.
Excluded Reason
Customer service quality Cannot be measured consistently across 68 networks
App design and user experience Subjective and version-dependent
Brand recognition Not a service attribute
Corporate ownership and funding Does not affect the driver at the charge point
Future expansion commitments Announcements are not provision
Renewable energy claims Not independently verifiable at device level
Networks operating fewer than 20 public devices 6 operators covering 84 devices, listed separately in the dataset
Pillar score profile for the top three UK charging networks against the all-network mean, plotted across the five index pillars. Each pillar has a different maximum, so the lines show position within each pillar rather than a common scale. EV Cable Hub UK Charging Network Index 2026. Chart 3. Pillar score profile for the top three UK charging networks against the all-network mean, plotted across the five index pillars. Each pillar has a different maximum, so the lines show position within each pillar rather than a common scale. EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.0510152025InstaVoltFastnedTesla SuperchargerAll-network meanCoverage /25Reliability /25Price /20Payment /15Speed /15
Pillar score profile for the top three UK charging networks against the all-network mean, plotted across the five index pillars. Each pillar has a different maximum, so the lines show position within each pillar rather than a common scale. EV Cable Hub UK Charging Network Index 2026. Data: Table 6

The full 2026 network ranking#

All 30 UK charging networks operating more than 300 public devices are ranked below, scored out of 100. The EV Cable Hub UK Charging Network Index 2026 placed InstaVolt first on 84.2 and Source London thirtieth on 48.4, with the remaining 38 scored networks published in the downloadable dataset.

The table is the content here, so the commentary stays short. Every column is sortable, every network carries its five pillar scores alongside its total, and the 2025 rank and rank change sit at the end of each row so the movement can be read without cross-referencing the year-on-year section.

Three networks rose materially. Evyve gained six places on a 3.4 point improvement in coverage. MFG EV Power gained four places on a 2.1 point improvement in reliability. Believ gained four places on a 2.8 point improvement in coverage. All three movements are coverage or reliability movements, which is what you would expect from an index that puts 50 of its 100 points into those two pillars.

Three networks fell materially, and each fall traces to a single pillar. EG On The Move fell ten places, driven by a 2.6 point fall in price following a 6.3% tariff rise. BP Pulse fell six places on a 1.9 point fall in reliability. Shell Recharge fell three places on a 1.4 point fall in price. A ten-place fall sounds dramatic and is worth putting in proportion: the scored field is tightly packed through the middle, and 2.6 points of movement is enough to cross a dozen networks between ranks 13 and 25.

The distribution numbers matter as much as the order. The standard deviation of network scores is 11.4 points. The gap between first and tenth is 13.4 points, and the gap between tenth and thirtieth is 22.4 points, so the field spreads out considerably faster below the top ten than inside it. Four networks scored above the mean on all five pillars and 11 scored below the mean on all five. Every other network in the scored field is above the mean on something and below it on something else, which is why a single overall number should always be read next to the pillar columns rather than instead of them.

The individual pillar leaders are worth listing, because each one is a different network. The EV Cable Hub UK Charging Network Index 2026 recorded the highest coverage score at ubitricity on 19.2 of 25, the highest reliability score at Tesla Supercharger on 24.6 of 25, the highest price score at IONITY on 17.8 of 20, and the highest payment access and speed scores both at Fastned on 14.6 of 15 and 14.8 of 15. No network holds more than one pillar.

Table 6 Full network ranking, 2026
Table 6. Full network ranking, 2026 Source: EV Cable Hub Research, 2026 edition.
Rank Network Score /100 Coverage /25 Reliability /25 Price /20 Payment /15 Speed /15 2025 rank Change
1 InstaVolt 84.2 18.4 24.1 14.2 14.2 13.3 2 +1
2 Fastned 82.6 12.8 24.0 16.4 14.6 14.8 4 +2
3 Tesla Supercharger 81.9 15.2 24.6 17.4 12.1 12.6 1 -2
4 GRIDSERVE 79.4 14.1 23.4 14.8 13.8 13.3 5 +1
5 Osprey 78.8 14.6 23.8 13.6 14.0 12.8 3 -2
6 IONITY 76.2 9.8 22.6 17.8 12.4 13.6 9 +3
7 MFG EV Power 74.6 13.2 22.8 13.8 13.4 11.4 11 +4
8 Applegreen Electric 72.4 11.4 22.1 14.6 13.2 11.1 10 +2
9 Evyve 71.2 10.2 21.8 14.6 13.0 11.6 15 +6
10 Shell Recharge 70.8 16.8 21.2 10.4 13.2 9.2 7 -3
11 Pod Point 69.2 17.2 20.4 15.8 10.6 5.2 12 +1
12 Milence 68.4 6.8 21.4 15.4 12.4 12.4 new new
13 Connected Kerb 67.6 18.2 20.1 16.8 8.4 4.1 14 +1
14 BP Pulse 66.8 17.8 19.2 10.2 12.8 6.8 8 -6
15 char.gy 65.4 17.4 20.6 17.2 7.2 3.0 17 +2
16 Alfa Power 64.2 9.4 20.8 15.8 12.0 6.2 18 +2
17 Believ 63.8 15.6 19.8 17.0 7.4 4.0 21 +4
18 Mer 62.4 12.4 19.6 14.6 10.2 5.6 16 -2
19 ubitricity 61.8 19.2 19.4 17.6 4.2 1.4 19 0
20 Zest 61.2 10.8 19.2 15.4 10.4 5.4 22 +2
21 RAW Charging 60.4 10.2 19.0 15.8 10.0 5.4 20 -1
22 Swarco E.Connect 59.6 11.2 18.6 15.0 9.8 5.0 23 +1
23 EG On The Move 58.8 10.4 17.8 9.8 12.4 8.4 13 -10
24 Fuuse-managed sites 58.2 13.6 18.2 14.8 8.6 3.0 26 +2
25 Wenea 57.4 8.8 18.4 14.2 10.2 5.8 25 0
26 Blink UK 56.2 9.2 17.6 14.4 9.6 5.4 24 -2
27 ESB Energy 55.4 11.6 17.2 13.4 8.8 4.4 27 0
28 JOLT 54.6 8.2 17.4 12.8 10.4 5.8 30 +2
29 GeniePoint 52.8 12.8 15.4 12.0 8.2 4.4 28 -1
30 Source London 48.4 12.2 14.8 13.6 5.4 2.4 29 -1
: Mean, all 68 scored networks 63.4 11.2 19.4 14.6 10.1 8.1 : :
Rank movement between the 2025 and 2026 editions for the 29 ranked networks scored in both. The right-hand dot is the 2026 rank, so a dot to the left of its partner is a network that moved up the table. EV Cable Hub UK Charging Network Index 2026. Chart 4. Rank movement between the 2025 and 2026 editions for the 29 ranked networks scored in both. The right-hand dot is the 2026 rank, so a dot to the left of its partner is a network that moved up the table. EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.2025 rank2026 rankInstaVolt1Fastned2Tesla Supercharger3GRIDSERVE4Osprey5IONITY6MFG EV Power7Applegreen Electric8Evyve9Shell Recharge10Pod Point11Connected Kerb13BP Pulse14char.gy15Alfa Power16Believ17Mer18ubitricity19Zest20RAW Charging21Swarco E.Connect22EG On The Move23Fuuse-managed sites24Wenea25Blink UK26ESB Energy27JOLT28GeniePoint29Source London30
Rank movement between the 2025 and 2026 editions for the 29 ranked networks scored in both. The right-hand dot is the 2026 rank, so a dot to the left of its partner is a network that moved up the table. EV Cable Hub UK Charging Network Index 2026. Data: Table 6

Network size and coverage#

ubitricity operated 12,840 public charging devices in the UK in 2026, more than any other network, while InstaVolt operated 3,240 and Fastned 640. The EV Cable Hub UK Charging Network Index 2026 found the ten largest networks held 63.6% of UK devices but only four of them placed in the index top ten.

The disconnect between size and score is the argument of this section, and it is the single most useful corrective to the way charging networks are usually compared. Size is worth 25 points of 100, not 100 of 100. The largest network by device count ranks nineteenth overall, because its payment access score of 4.2 of 15 and its speed score of 1.4 of 15 are the lowest of any network in the top 20.

Read the size table against the ranking and the pattern is consistent rather than random. Fastned ranks twenty-third by devices and second on the index, a gap of 21 places. IONITY ranks twenty-sixth by devices and sixth on the index, a gap of 20 places. In the other direction ubitricity ranks first by devices and nineteenth on the index, and Source London ranks eleventh by devices and thirtieth. Networks built around a small number of high-power devices climb; networks built around a large number of low-power devices do not.

Installed capacity tells a third story again, and it is the measure that reconciles the other two. InstaVolt operates 3,240 devices at 612 MW, more installed capacity than any other UK network on a quarter of the largest network's device count. ubitricity operates 12,840 devices at 64 MW. Those two networks are almost exactly a factor of ten apart on capacity and a factor of four apart on devices, in opposite directions. Anybody comparing UK charging networks on a single number needs to say which of the three they mean.

Nothing in that makes a large slow network worse than a small fast one. They are different products. A lamp post network exists so that a driver without a driveway can charge overnight where they park, and 12,840 devices doing that is a substantial public service that no ultra-rapid network provides. The index scores them on the same five pillars because a driver choosing between them needs a common basis, and the pillar columns are published precisely so the trade-off can be read directly. Our UK charge point census counts the same network from the device side rather than the operator side.

Table 7 Network size, 2026
Table 7. Network size, 2026 Source: EV Cable Hub Research, 2026 edition.
Network Devices Connectors Locations Regions covered Local authorities reached Strategic road sites Installed capacity
ubitricity 12,840 12,840 11,420 9 74 0 64 MW
char.gy 8,120 8,120 7,380 10 96 0 41 MW
Connected Kerb 6,940 9,720 3,140 12 148 2 58 MW
Pod Point 6,280 8,860 2,940 12 218 8 74 MW
BP Pulse 5,410 9,180 2,180 12 196 84 386 MW
Believ 4,610 6,240 2,410 11 84 0 51 MW
Shell Recharge 3,860 6,120 1,640 12 174 62 298 MW
InstaVolt 3,240 4,580 1,120 12 208 41 612 MW
Tesla Supercharger 2,180 2,180 218 12 142 48 442 MW
Fuuse-managed sites 1,940 2,910 1,240 11 118 4 46 MW
Source London 1,910 2,680 1,480 1 24 0 22 MW
Osprey 1,720 2,440 480 12 164 18 268 MW
GRIDSERVE 1,640 2,380 224 12 108 68 312 MW
MFG EV Power 1,480 2,180 312 12 126 24 284 MW
GeniePoint 1,420 2,140 940 12 152 6 58 MW
Mer 1,340 1,920 640 10 88 2 38 MW
ESB Energy 1,180 1,860 720 8 62 4 34 MW
Swarco E.Connect 1,060 1,580 620 9 74 1 24 MW
Zest 980 1,410 380 10 68 3 26 MW
EG On The Move 860 1,240 184 11 92 12 148 MW
RAW Charging 820 1,180 310 9 58 0 21 MW
Applegreen Electric 720 1,060 128 10 64 21 132 MW
Fastned 640 940 84 8 48 26 148 MW
Alfa Power 640 980 210 9 54 8 42 MW
Evyve 540 780 148 9 46 6 74 MW
IONITY 480 480 62 8 38 34 158 MW
Blink UK 460 680 240 8 42 1 12 MW
JOLT 380 560 190 6 28 0 28 MW
Wenea 340 510 140 7 32 2 14 MW
Milence 210 420 24 6 18 14 78 MW
Table 8 Size rank against index rank, 2026
Table 8. Size rank against index rank, 2026 Source: EV Cable Hub Research, 2026 edition.
Network Device rank Capacity rank Index rank Gap, device rank to index rank
InstaVolt 8 1 1 +7
Fastned 23 9 2 +21
Tesla Supercharger 9 2 3 +6
GRIDSERVE 13 4 4 +9
Osprey 12 7 5 +7
IONITY 26 8 6 +20
MFG EV Power 14 6 7 +7
Shell Recharge 7 5 10 -3
Pod Point 4 13 11 -7
Connected Kerb 3 12 13 -10
BP Pulse 5 3 14 -9
char.gy 2 21 15 -13
ubitricity 1 15 19 -18
Source London 11 24 30 -19
Public charging devices operated by each UK network, 30 networks above 300 devices, EV Cable Hub UK Charging Network Index 2026. Chart 5. Public charging devices operated by each UK network, 30 networks above 300 devices, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.ubitricity12,840char.gy8,120Connected Kerb6,940Pod Point6,280BP Pulse5,410Believ4,610Shell Recharge3,860InstaVolt3,240Tesla Supercharger2,180Fuuse-managed sites1,940Source London1,910Osprey1,720GRIDSERVE1,640MFG EV Power1,480GeniePoint1,420Mer1,340ESB Energy1,180Swarco E.Connect1,060Zest980EG On The Move860RAW Charging820Applegreen Electric720Fastned640Alfa Power640Evyve540IONITY480Blink UK460JOLT380Wenea340Milence210
Public charging devices operated by each UK network, 30 networks above 300 devices, EV Cable Hub UK Charging Network Index 2026. Data: Table 7
Installed charging capacity by UK network in megawatts, EV Cable Hub UK Charging Network Index 2026. Chart 6. Installed charging capacity by UK network in megawatts, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.ubitricity64 MWchar.gy41 MWConnected Kerb58 MWPod Point74 MWBP Pulse386 MWBeliev51 MWShell Recharge298 MWInstaVolt612 MWTesla Supercharger442 MWFuuse-managed sites46 MWSource London22 MWOsprey268 MWGRIDSERVE312 MWMFG EV Power284 MWGeniePoint58 MWMer38 MWESB Energy34 MWSwarco E.Connect24 MWZest26 MWEG On The Move148 MWRAW Charging21 MWApplegreen Electric132 MWFastned148 MWAlfa Power42 MWEvyve74 MWIONITY158 MWBlink UK12 MWJOLT28 MWWenea14 MWMilence78 MW
Installed charging capacity by UK network in megawatts, EV Cable Hub UK Charging Network Index 2026. Data: Table 7
Device-count rank against index rank for 14 large UK charging networks. Points below the diagonal rank better on the index than on size. EV Cable Hub UK Charging Network Index 2026. Chart 7. Device-count rank against index rank for 14 large UK charging networks. Points below the diagonal rank better on the index than on size. EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.0612182430051015202530InstaVoltFastnedTesla SuperchargerGRIDSERVEOspreyIONITYMFG EV PowerShell RechargePod PointConnected KerbBP Pulsechar.gyubitricitySource LondonRank by device countRank on the index
Device-count rank against index rank for 14 large UK charging networks. Points below the diagonal rank better on the index than on size. EV Cable Hub UK Charging Network Index 2026. Data: Table 8

Network coverage by region#

Nine UK charging networks operated in all twelve UK regions in 2026, and 21 operated in only one. The EV Cable Hub UK Charging Network Index 2026 found Northern Ireland was served by 14 networks, fewer than any other region, against 52 in Greater London.

Coverage is the pillar with the widest spread in the scored field and it is the one that decides whether a network is usable on a long journey rather than only around a driver's home. A network present in one region can be excellent within it and irrelevant to everybody outside it, and the index reflects that by scoring regional spread at 5 of the 25 coverage points and local authority reach at a further 3.

The regional picture is dominated by Greater London, which holds 28,410 devices, more than three times the next region, and is served by 52 of the 68 networks. That concentration has a compositional explanation rather than a policy one: London has the largest lamp post and on-street population in the UK, and the largest single network share in the region belongs to a lamp post operator at 28.4%. Northern Ireland sits at the other end with 840 devices and 14 networks, and a single operator holding 41.2% of them.

Rapid provision is the more useful regional measure for a driver travelling through, and it moves differently from the headline count. The South East is served by 46 networks of which 31 offer rapid provision, the highest rapid count of any region. Greater London is served by 52 networks but only 26 offer rapid provision, which is half. The region with the most networks is not the region with the most choice at speed, and that inversion is the most quotable thing in this section.

The network-by-region matrix is the artefact worth reproducing. Ten networks reach all twelve regions and the local authority column separates them: Pod Point reaches 218 of 374 local authorities and GRIDSERVE reaches 108, both with full regional coverage. Regional presence and local density are different things, and a network can be technically national while being absent from most of the places inside each region.

Table 9 Networks operating in each UK region, 2026
Table 9. Networks operating in each UK region, 2026 Source: EV Cable Hub Research, 2026 edition.
Region Networks present Devices Largest network by devices Largest network share Networks with rapid provision
Greater London 52 28,410 ubitricity 28.4% 26
South East 46 13,240 Pod Point 14.2% 31
North West 41 9,180 char.gy 18.6% 28
South West 38 8,120 Connected Kerb 16.1% 29
East of England 37 7,240 Pod Point 15.4% 27
West Midlands 36 6,680 char.gy 17.2% 26
Scotland 34 6,420 Swarco E.Connect 12.8% 24
Yorkshire and the Humber 33 6,040 Believ 14.6% 25
East Midlands 31 5,380 Connected Kerb 13.8% 24
Wales 26 3,610 Pod Point 16.4% 19
North East 24 3,180 char.gy 15.2% 18
Northern Ireland 14 840 ESB Energy 41.2% 11
Table 10 Regional coverage by network, top 20 networks, 2026
Table 10. Regional coverage by network, top 20 networks, 2026 Source: EV Cable Hub Research, 2026 edition.
Network Regions of 12 Local authorities of 374 Region with most devices Regions with zero devices
Pod Point 12 218 South East 0
InstaVolt 12 208 South East 0
BP Pulse 12 196 Greater London 0
Shell Recharge 12 174 South East 0
Osprey 12 164 South East 0
GeniePoint 12 152 North West 0
Connected Kerb 12 148 Greater London 0
Tesla Supercharger 12 142 South East 0
MFG EV Power 12 126 North West 0
GRIDSERVE 12 108 South East 0
Believ 11 84 Yorkshire and the Humber Northern Ireland
EG On The Move 11 92 North West Northern Ireland
Fuuse-managed sites 11 118 South West Northern Ireland
char.gy 10 96 Greater London Northern Ireland, North East
Mer 10 88 Scotland Northern Ireland, Wales
Zest 10 68 South East Northern Ireland, North East
Applegreen Electric 10 64 South East Northern Ireland, North East
ubitricity 9 74 Greater London Northern Ireland, Wales, North East
Swarco E.Connect 9 74 Scotland Northern Ireland, Wales, South West
RAW Charging 9 58 South West Northern Ireland, North East, Scotland
Public charging devices by UK region, EV Cable Hub UK Charging Network Index 2026. Chart 8. Public charging devices by UK region, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Greater London28,410South East13,240North West9,180South West8,120East of England7,240West Midlands6,680Scotland6,420Yorkshire and the Humber6,040East Midlands5,380Wales3,610North East3,180Northern Ireland840
Public charging devices by UK region, EV Cable Hub UK Charging Network Index 2026. Data: Table 9
Networks operating in each UK region against the number offering rapid provision there, EV Cable Hub UK Charging Network Index 2026. Chart 9. Networks operating in each UK region against the number offering rapid provision there, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Networks presentNetworks with rapid provisionGreater London5226South East4631North West4128South West3829East of England3727West Midlands3626Scotland3424Yorkshire and the Humber3325East Midlands3124Wales2619North East2418Northern Ireland1411
Networks operating in each UK region against the number offering rapid provision there, EV Cable Hub UK Charging Network Index 2026. Data: Table 9
Local authorities reached of 374, top 20 UK charging networks by regional spread, EV Cable Hub UK Charging Network Index 2026. Chart 10. Local authorities reached of 374, top 20 UK charging networks by regional spread, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Pod Point218InstaVolt208BP Pulse196Shell Recharge174Osprey164GeniePoint152Connected Kerb148Tesla Supercharger142MFG EV Power126GRIDSERVE108Believ84EG On The Move92Fuuse-managed sites118char.gy96Mer88Zest68Applegreen Electric64ubitricity74Swarco E.Connect74RAW Charging58
Local authorities reached of 374, top 20 UK charging networks by regional spread, EV Cable Hub UK Charging Network Index 2026. Data: Table 10

Motorway and strategic road network coverage#

BP Pulse operated 84 sites on the UK strategic road network in 2026, more than any other network, ahead of GRIDSERVE on 68 and Shell Recharge on 62. The EV Cable Hub UK Charging Network Index 2026 found 18 networks operating on the strategic road network and 50 with no presence on it at all.

Motorway coverage is the single most consequential coverage measure for a long-distance driver, and it carries 4 of the 25 coverage points for that reason. Fifty of the 68 scored networks have no strategic road network presence whatsoever, which is the plainest statement of how concentrated long-distance charging provision actually is in the UK.

Site count and device count separate sharply here. BP Pulse leads on sites with 84 but GRIDSERVE leads on devices with 946 across 68 sites, a mean of 13.9 devices per site against 8.1. Tesla Supercharger runs the highest mean at 16.9 devices per site across 48 sites. A driver arriving at a motorway services cares about how many working plugs are on that forecourt, not how many forecourts the operator has elsewhere, so the mean devices per site column is the one to read.

There are 132 motorway service areas in Great Britain. Of those, 58 are served by one network only, 46 by two and 28 by three or more, so 74 of 132 give a driver an alternative operator on site if the first fails. The mean is 1.9 networks per service area and the highest at any single site is five. That figure is the real resilience measure on the motorway network: at 58 sites, one operator's outage is the driver's problem with no fallback within the same car park.

Prices on the strategic road network run materially above prices off it. EV Cable Hub's 2026 Public Charging Tariff Basket recorded a mean of 81.2p per kWh at strategic road network sites against 57.4p elsewhere, a premium of 41.5%. Reliability runs the other way: the mean successful-first-attempt rate at strategic road network sites was 96.8% against 92.6% off it. The motorway network is the most expensive and the most reliable part of UK charging at the same time, and both facts have the same cause, which is that it is overwhelmingly new ultra-rapid hardware.

Distance between sites is what actually determines whether a route works. The mean gap between rapid sites on UK motorways is 21.4 miles and the longest single gap is 58 miles. A 58-mile gap is inside the range of every current battery electric vehicle at any state of charge above about a fifth, so the constraint on UK motorway driving in 2026 is queueing and reliability rather than reach. The full UK public charging price dataset sets out the strategic road network premium in more detail.

Table 11 Strategic road network presence, 2026
Table 11. Strategic road network presence, 2026 Source: EV Cable Hub Research, 2026 edition.
Network SRN sites SRN devices Mean devices per SRN site Ultra-rapid share at SRN sites Mean SRN price
BP Pulse 84 682 8.1 74.2% 87p
GRIDSERVE 68 946 13.9 94.6% 82p
Shell Recharge 62 584 9.4 81.4% 89p
Tesla Supercharger 48 812 16.9 100% 67p
InstaVolt 41 468 11.4 96.2% 85p
IONITY 34 386 11.4 100% 74p
Fastned 26 312 12.0 100% 79p
MFG EV Power 24 218 9.1 92.4% 84p
Applegreen Electric 21 184 8.8 88.6% 79p
Osprey 18 148 8.2 94.1% 85p
Milence 14 168 12.0 100% 72p
EG On The Move 12 108 9.0 91.2% 85p
Pod Point 8 62 7.8 24.2% 59p
Alfa Power 8 54 6.8 61.4% 69p
GeniePoint 6 38 6.3 42.1% 74p
Evyve 6 48 8.0 96.4% 79p
Fuuse-managed sites 4 24 6.0 38.4% 56p
ESB Energy 4 22 5.5 41.2% 65p
Strategic road network sites operated by each UK charging network, 18 networks with any presence, EV Cable Hub UK Charging Network Index 2026. Chart 11. Strategic road network sites operated by each UK charging network, 18 networks with any presence, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.BP Pulse84GRIDSERVE68Shell Recharge62Tesla Supercharger48InstaVolt41IONITY34Fastned26MFG EV Power24Applegreen Electric21Osprey18Milence14EG On The Move12Pod Point8Alfa Power8GeniePoint6Evyve6Fuuse-managed sites4ESB Energy4
Strategic road network sites operated by each UK charging network, 18 networks with any presence, EV Cable Hub UK Charging Network Index 2026. Data: Table 11
Mean devices at each operator's strategic road network sites, EV Cable Hub UK Charging Network Index 2026. Chart 12. Mean devices at each operator's strategic road network sites, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.BP Pulse8.1GRIDSERVE13.9Shell Recharge9.4Tesla Supercharger16.9InstaVolt11.4IONITY11.4Fastned12MFG EV Power9.1Applegreen Electric8.8Osprey8.2Milence12EG On The Move9Pod Point7.8Alfa Power6.8GeniePoint6.3Evyve8Fuuse-managed sites6ESB Energy5.5
Mean devices at each operator's strategic road network sites, EV Cable Hub UK Charging Network Index 2026. Data: Table 11

Charging hubs by network#

24 UK charging networks operated at least one charging hub in 2026, defined as a site with six or more devices rated at 50kW or above. The EV Cable Hub UK Charging Network Index 2026 found GRIDSERVE operated the highest share of its locations as hubs at 62.5%, and Tesla Supercharger operated 218 hub sites.

Hub strategy is the clearest structural difference between UK charging networks and the table shows it starkly. Three networks run every one of their locations as a hub: Tesla Supercharger at 218 sites, IONITY at 62 and Milence at 24. At the other end, Connected Kerb runs 8 hubs across 3,140 locations, 0.3% of its estate, and Pod Point runs 14 across 2,940 locations.

Neither approach is wrong and the section should not pretend otherwise. A network of many small sites puts a device close to where people live and park. A network of few large sites puts many devices where people travel. They solve different problems and the index scores them on the same pillars because a driver has to choose between them, not because one strategy is a defective version of the other.

The consequence for a driver is concrete and worth stating. At a six-device hub, one unit out of service removes 17% of the site's capacity and the driver plugs in next door. At a two-device on-street location, one unit out of service removes half of it and the driver drives somewhere else. Site size is a resilience measure as much as a capacity measure, which is why the reliability figures later in this page read differently depending on the size of the sites a network runs.

The largest single hub column gives the ceiling rather than the norm. The largest UK charging hub in the 2026 audit carries 44 devices, and the mean across all 1,486 hubs is far lower: most networks cluster between 6.5 and 10 devices per hub, with only four networks above 10. Hub building in the UK in 2026 is still predominantly six-to-twelve device sites rather than the very large forecourts that get the coverage.

Table 12 Charging hubs by network, 2026
Table 12. Charging hubs by network, 2026 Source: EV Cable Hub Research, 2026 edition.
Network Hub sites Hub devices Hubs as share of that network's locations Mean devices per hub Largest single hub
Tesla Supercharger 218 2,180 100.0% 10.0 44
GRIDSERVE 140 1,412 62.5% 10.1 36
InstaVolt 186 1,684 16.6% 9.1 24
BP Pulse 148 1,024 6.8% 6.9 18
Shell Recharge 121 892 7.4% 7.4 16
MFG EV Power 96 782 30.8% 8.1 20
Osprey 84 686 17.5% 8.2 16
IONITY 62 480 100.0% 7.7 12
Fastned 58 462 69.0% 8.0 14
Applegreen Electric 48 384 37.5% 8.0 12
EG On The Move 42 318 22.8% 7.6 12
Evyve 34 262 23.0% 7.7 10
Milence 24 210 100.0% 8.8 12
Alfa Power 18 124 8.6% 6.9 8
Pod Point 14 96 0.5% 6.9 8
Mer 12 82 1.9% 6.8 8
Zest 11 74 2.9% 6.7 8
GeniePoint 10 68 1.1% 6.8 8
ESB Energy 9 62 1.3% 6.9 8
Connected Kerb 8 54 0.3% 6.8 8
Swarco E.Connect 8 52 1.3% 6.5 7
Wenea 6 41 4.3% 6.8 8
Blink UK 4 27 1.7% 6.8 7
Fuuse-managed sites 4 26 0.3% 6.5 7
Hub sites operated against mean devices per hub, 24 UK networks running at least one hub. Points to the right run many hubs; points high on the axis run large ones. EV Cable Hub UK Charging Network Index 2026. Chart 13. Hub sites operated against mean devices per hub, 24 UK networks running at least one hub. Points to the right run many hubs; points high on the axis run large ones. EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.02468101204080120160200240Tesla SuperchargerGRIDSERVEInstaVoltBP PulseShell RechargeMFG EV PowerOspreyIONITYFastnedApplegreen ElectricEG On The MoveEvyveMilenceAlfa PowerPod PointMerZestGeniePointESB EnergyConnected KerbSwarco E.ConnectWeneaBlink UKFuuse-managed sitesHub sites operatedMean devices per hub
Hub sites operated against mean devices per hub, 24 UK networks running at least one hub. Points to the right run many hubs; points high on the axis run large ones. EV Cable Hub UK Charging Network Index 2026. Data: Table 12
Share of each network's locations that meet the charging hub definition, EV Cable Hub UK Charging Network Index 2026. Chart 14. Share of each network's locations that meet the charging hub definition, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Tesla Supercharger100%GRIDSERVE62.5%InstaVolt16.6%BP Pulse6.8%Shell Recharge7.4%MFG EV Power30.8%Osprey17.5%IONITY100%Fastned69%Applegreen Electric37.5%EG On The Move22.8%Evyve23%Milence100%Alfa Power8.6%Pod Point0.5%Mer1.9%Zest2.9%GeniePoint1.1%ESB Energy1.3%Connected Kerb0.3%Swarco E.Connect1.3%Wenea4.3%Blink UK1.7%Fuuse-managed sites0.3%
Share of each network's locations that meet the charging hub definition, EV Cable Hub UK Charging Network Index 2026. Data: Table 12

Speed and power mix by network#

IONITY, Fastned, Tesla Supercharger and Milence operated exclusively ultra-rapid devices in the UK in 2026, while ubitricity's mean device power was 5.0 kW. The EV Cable Hub UK Charging Network Index 2026 recorded a mean device power of 212 kW at the fastest network and 3.4 kW at the slowest.

Speed mix is what determines whether a network is useful for a top-up on a journey or for an overnight charge where a driver parks. The spread across the scored field is larger than on any other measure on this page: the ratio between the fastest and slowest network mean device power is more than sixty to one.

Four networks sit at 100% ultra-rapid. A further seven run above 89%, and they include the three highest scoring networks overall. Below that the field falls away quickly: Shell Recharge is 25.1% ultra-rapid, BP Pulse 21.2%, and the on-street networks are effectively zero, with char.gy and ubitricity operating no ultra-rapid devices at all.

The two ends of that distribution are different products serving different drivers, and comparing them on a single speed number is exactly the error the index is built to avoid. That is why speed and connectors together carry only 15 of the 100 points. A network of 12,840 five-kilowatt lamp post devices is not a failed attempt at an ultra-rapid network; it is a working answer to a different question, and it scores 19.2 of 25 on coverage while scoring 1.4 of 15 on speed.

Mean device power across all UK networks was 43.5 kW in 2026, up from 39.5 kW a year earlier, a rise of 10.1%. That figure moves for two reasons at once: new ultra-rapid devices going in, and slow devices being added at the same time in much larger numbers. The mean rose despite the fastest-growing category by unit count being on-street slow charging, which tells you how much power each new ultra-rapid device carries relative to the units around it.

Table 13 Speed and power mix by network, 2026
Table 13. Speed and power mix by network, 2026 Source: EV Cable Hub Research, 2026 edition.
Network Mean device power Ultra-rapid devices Rapid devices Fast devices Slow devices Ultra-rapid share
IONITY 329 kW 480 0 0 0 100%
Milence 371 kW 210 0 0 0 100%
Fastned 231 kW 640 0 0 0 100%
Tesla Supercharger 203 kW 2,180 0 0 0 100%
GRIDSERVE 190 kW 1,462 78 100 0 89.1%
InstaVolt 189 kW 3,082 158 0 0 95.1%
EG On The Move 172 kW 784 76 0 0 91.2%
Osprey 156 kW 1,594 126 0 0 92.7%
Applegreen Electric 183 kW 648 72 0 0 90.0%
MFG EV Power 192 kW 1,368 112 0 0 92.4%
Evyve 137 kW 496 44 0 0 91.9%
Shell Recharge 77 kW 968 452 2,180 260 25.1%
BP Pulse 71 kW 1,148 792 3,124 346 21.2%
Alfa Power 66 kW 284 196 160 0 44.4%
JOLT 74 kW 218 162 0 0 57.4%
Wenea 41 kW 92 88 148 12 27.1%
GeniePoint 41 kW 348 432 604 36 24.5%
Zest 27 kW 96 124 682 78 9.8%
Mer 28 kW 148 192 894 106 11.0%
ESB Energy 29 kW 172 248 682 78 14.6%
Blink UK 26 kW 42 78 296 44 9.1%
RAW Charging 26 kW 62 118 584 56 7.6%
Swarco E.Connect 23 kW 88 172 726 74 8.3%
Fuuse-managed sites 24 kW 106 204 1,382 248 5.5%
Pod Point 12 kW 62 156 5,418 644 1.0%
Connected Kerb 8.4 kW 18 44 5,286 1,592 0.3%
Believ 11 kW 42 142 3,180 1,246 0.9%
Source London 11.5 kW 12 36 1,284 578 0.6%
char.gy 5.0 kW 0 0 2,184 5,936 0.0%
ubitricity 5.0 kW 0 0 1,842 10,998 0.0%
Speed band mix by UK charging network, each bar scaled to that network's own device total, EV Cable Hub UK Charging Network Index 2026. Chart 15. Speed band mix by UK charging network, each bar scaled to that network's own device total, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Ultra-rapidRapidFastSlowIONITY329480Milence371210Fastned231640Tesla Supercharger2032,180GRIDSERVE1901,462InstaVolt3,082EG On The Move17278476Osprey1561,594126Applegreen Electric18364872MFG EV Power1921,368112Evyve13749644Shell Recharge9684522,180BP Pulse1,1487923,124Alfa Power66284196160JOLT74218162Wenea419288148GeniePoint348432604Zest96124682Mer148192894ESB Energy172248682Blink UK4278296RAW Charging62118584Swarco E.Connect88172726Fuuse-managed sites1062041,382Pod Point5,418Connected Kerb5,286Believ3,180Source London1,284char.gy2,184ubitricity1,842
Speed band mix by UK charging network, each bar scaled to that network's own device total, EV Cable Hub UK Charging Network Index 2026. Data: Table 13
Mean device power by UK charging network in kilowatts, EV Cable Hub UK Charging Network Index 2026. Chart 16. Mean device power by UK charging network in kilowatts, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.IONITY329 kWMilence371 kWFastned231 kWTesla Supercharger203 kWGRIDSERVE190 kWInstaVolt189 kWEG On The Move172 kWOsprey156 kWApplegreen Electric183 kWMFG EV Power192 kWEvyve137 kWShell Recharge77 kWBP Pulse71 kWAlfa Power66 kWJOLT74 kWWenea41 kWGeniePoint41 kWZest27 kWMer28 kWESB Energy29 kWBlink UK26 kWRAW Charging26 kWSwarco E.Connect23 kWFuuse-managed sites24 kWPod Point12 kWConnected Kerb8.4 kWBeliev11 kWSource London11.5 kWchar.gy5 kWubitricity5 kW
Mean device power by UK charging network in kilowatts, EV Cable Hub UK Charging Network Index 2026. Data: Table 13

Connector mix by network#

14 UK charging networks offered CHAdeMO connectors in 2026, down from 22 two years earlier, and 41 offered untethered Type 2 sockets requiring a driver-supplied cable. The EV Cable Hub UK Charging Network Index 2026 found 62,960 untethered connectors across the UK network, 42.4% of all public connectors.

Whether you need to carry a cable depends entirely on which networks you use, and the mapping between the two is published here rather than left to be discovered at the charge point. Eight UK networks require a driver-supplied cable at every session. Eighteen never require one. The remaining 42 sit somewhere in between, and for those the answer changes site by site.

The rule of thumb that falls out of the connector table is simple enough to remember. If you use lamp post and on-street networks you need your own cable every time: ubitricity and char.gy are 100% untethered, and Connected Kerb, Believ and Source London are all above 90%. If you use rapid and ultra-rapid networks you never do, because those networks are tethered by design. Every CCS and CHAdeMO connector comes attached to the unit.

The CHAdeMO decline is the clearest standards story in the 2026 data. Fourteen networks still offer it, down from 18 in the 2025 edition and 22 two years before that, and there were 9,240 CHAdeMO connectors nationally, down 6.2% year on year. It is declining but it is not gone, and a driver with a CHAdeMO-inlet vehicle still has meaningful national coverage in 2026. In the other direction, one network offers MCS for heavy goods vehicles, on 84 connectors.

The practical detail matters more than the totals. EV Cable Hub's 2026 Location Audit measured a mean bay-to-unit distance of 2.9 metres at untethered sites, but 11.4% of untethered sites need a cable longer than 5 metres and 18.6% are sites where a 10 metre cable is the sensible choice. Only two networks offer a loan cable on site and only 11 warn a driver in the app that a cable is needed before they arrive, which is why 11.4% of UK drivers report having abandoned a charge because they had no cable with them.

For the equipment side, see the full UK connector type guide, Mode 2 and Mode 3 charging explained, and what a charging cable actually delivers. The EV charging cable range and the CCS cable range cover both connector families.

Two figures in this section are the ones a driver acts on. Locations where every connector is untethered account for 48.6% of all UK public locations, and 71.2% of locations have at least one untethered connector somewhere on site. Put together, those two numbers mean a driver who never carries a cable is locked out of roughly half of all UK charging locations outright and partially restricted at another fifth, regardless of which networks they have registered with.

Table 14 Connector mix by network, 2026
Table 14. Connector mix by network, 2026 Source: EV Cable Hub Research, 2026 edition.
Network Type 2 tethered Type 2 untethered CCS CHAdeMO Three-pin Driver must supply a cable
ubitricity 0 12,840 0 0 0 Always
char.gy 0 8,120 0 0 0 Always
Connected Kerb 812 8,846 62 0 0 Almost always
Believ 486 5,568 186 0 0 Almost always
Source London 284 2,348 48 0 0 Almost always
Pod Point 3,486 5,156 194 24 0 Often
Fuuse-managed sites 1,242 1,358 268 42 0 Often
RAW Charging 486 512 164 18 0 Often
Swarco E.Connect 682 634 220 44 0 Often
Zest 574 618 186 32 0 Often
Blink UK 318 254 96 12 0 Sometimes
Mer 942 588 322 68 0 Sometimes
ESB Energy 786 542 388 144 0 Sometimes
BP Pulse 3,142 2,684 2,486 868 0 Sometimes
Shell Recharge 2,046 1,462 2,124 488 0 Sometimes
GeniePoint 618 486 782 254 0 Sometimes
Wenea 186 148 148 28 0 Sometimes
Alfa Power 148 96 596 140 0 Rarely
JOLT 62 48 386 64 0 Rarely
Osprey 138 0 2,142 160 0 Never
InstaVolt 96 0 4,286 198 0 Never
GRIDSERVE 184 0 2,096 100 0 Never
MFG EV Power 92 0 1,996 92 0 Never
Evyve 42 0 706 32 0 Never
Applegreen Electric 48 0 964 48 0 Never
EG On The Move 62 0 1,142 36 0 Never
Fastned 0 0 908 32 0 Never
IONITY 0 0 480 0 0 Never
Tesla Supercharger 0 0 2,180 0 0 Never
Milence 0 0 336 0 84 (MCS) Never
Table 15 Cable requirement by network type, 2026
Table 15. Cable requirement by network type, 2026 Source: EV Cable Hub Research, 2026 edition.
Network type Networks Devices Untethered share Cable needed Typical cable length required
Lamp post and on-street slow 8 22,180 96.4% Every session 5m to 10m
Local authority fast networks 14 18,420 71.2% Most sessions 5m to 7.5m
Destination and workplace 19 21,640 58.4% Most sessions 5m
Mixed-speed national networks 9 14,180 34.1% Some sessions 5m
Rapid and ultra-rapid only 18 21,920 0.0% Never None
All networks 68 98,340 42.4% : :

The rapid and ultra-rapid group is fully tethered, so no driver-supplied cable is needed at any length.

Tethered against untethered connectors by UK charging network, each bar scaled to that network's own connector total. Tethered here counts Type 2 tethered, CCS, CHAdeMO and MCS connectors together. EV Cable Hub UK Charging Network Index 2026. Chart 17. Tethered against untethered connectors by UK charging network, each bar scaled to that network's own connector total. Tethered here counts Type 2 tethered, CCS, CHAdeMO and MCS connectors together. EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Tethered connectorsUntethered connectorsubitricity12,840char.gy8,120Connected Kerb8748,846Believ6725,568Source London3322,348Pod Point3,7045,156Fuuse-managed sites1,5521,358RAW Charging668512Swarco E.Connect946634Zest792618Blink UK426254Mer1,332588ESB Energy1,318542BP Pulse6,4962,684Shell Recharge4,6581,462GeniePoint1,654486Wenea362148Alfa Power88496JOLT51248Osprey2,440InstaVolt4,580GRIDSERVE2,380MFG EV Power2,180Evyve780Applegreen Electric1,060EG On The Move1,240Fastned940IONITY480Tesla Supercharger2,180Milence420
Tethered against untethered connectors by UK charging network, each bar scaled to that network's own connector total. Tethered here counts Type 2 tethered, CCS, CHAdeMO and MCS connectors together. EV Cable Hub UK Charging Network Index 2026. Data: Table 14
Untethered share of connectors by network type, EV Cable Hub UK Charging Network Index 2026. Chart 18. Untethered share of connectors by network type, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Lamp post and on-street slow96.4%Local authority fast networks71.2%Destination and workplace58.4%Mixed-speed national networks34.1%Rapid and ultra-rapid only0%All networks42.4%
Untethered share of connectors by network type, EV Cable Hub UK Charging Network Index 2026. Data: Table 15

Pricing by network#

UK charging network ad-hoc prices ranged from 45p to 89p per kWh in 2026, a spread of 44p worth £18.48 on a single 42 kWh charge. The EV Cable Hub UK Charging Network Index 2026 found that price and mean device speed correlated at 0.71, so most of the apparent price difference between networks is a speed difference.

That correlation is the most important thing in this section and it changes how the whole price table should be read. A 45p network and an 89p network are not offering the same product at different prices. The 45p network is a 5.0 kW on-street unit and the 89p network is a 150 kW motorway unit, and the second delivers a usable charge in twenty minutes where the first takes overnight.

That is why the price pillar scores each network against the mean price for its own speed mix rather than against the market as a whole. Scoring price against the market mean would hand the price pillar to slow networks for reasons that have nothing to do with value, and would penalise every ultra-rapid network for being ultra-rapid. This is the most contestable methodological choice on the page, which is why the speed-adjusted position column is published beside the raw price for every network.

The speed-adjusted column reorders the table substantially. Tesla Supercharger prices 15.6% below the mean for its speed mix and scores 17.4 of 20 on price despite an ad-hoc rate of 67p. Milence prices 9.3% below and IONITY 6.8% below. In the other direction Shell Recharge prices 12.1% above the mean for its speed mix and BP Pulse 9.6% above, which is what produces price pillar scores of 10.4 and 10.2 rather than the mid-teens their raw rates alone would suggest.

Prices rose almost everywhere. EV Cable Hub's 2026 Public Charging Tariff Basket, built from 4,208 published tariffs captured on the first working day of each month, recorded a mean ad-hoc price of 59.2p per kWh against 56.7p a year earlier, a rise of 4.4%. Only one network held its price flat and one cut it. The largest single rise was 7.7% and the largest fall 1.3%, so the movement was broad but shallow.

The full UK public charging price dataset sets out the same market from the tariff side, including additional fees, which are scored inside the price pillar at 3 of its 20 points and are not reflected in the headline rate.

Table 16 Network pricing, 2026
Table 16. Network pricing, 2026 Source: EV Cable Hub Research, 2026 edition.
Network Ad-hoc Subscription Monthly fee Speed-adjusted position Price pillar score /20 Change vs 2025
IONITY 74p 44p £8.99 -6.8% 17.8 -1.3%
Tesla Supercharger 67p 52p £10.99 -15.6% 17.4 +3.1%
ubitricity 45p 41p £0 -7.4% 17.6 +2.3%
char.gy 47p 42p £0 -3.3% 17.2 +4.4%
Believ 48p 44p £0 -1.2% 17.0 +6.7%
Connected Kerb 49p 44p £0 -0.8% 16.8 +4.3%
Fastned 79p 59p £11.99 -0.5% 16.4 0.0%
Pod Point 59p 54p £0 +1.0% 15.8 +3.5%
Alfa Power 69p 64p £0 -2.1% 15.8 +4.5%
RAW Charging 52p 48p £0 +1.6% 15.8 +6.1%
Milence 72p 68p £0 -9.3% 15.4 new
Zest 55p 49p £0 +2.4% 15.4 +5.8%
Swarco E.Connect 58p 52p £0 +2.8% 15.0 +5.5%
Fuuse-managed sites 56p 52p £0 +3.2% 14.8 +7.7%
GRIDSERVE 82p 79p £0 +3.3% 14.8 +1.2%
Applegreen Electric 79p 74p £0 -0.5% 14.6 +5.3%
Evyve 79p 74p £0 -0.5% 14.6 +5.3%
Mer 62p 55p £0 +4.1% 14.6 +5.1%
Blink UK 61p 56p £0 +4.6% 14.4 +5.2%
Wenea 64p 59p £0 +5.2% 14.2 +4.9%
InstaVolt 85p 79p £0 +7.1% 14.2 +3.7%
MFG EV Power 84p 79p £0 +5.8% 13.8 +2.4%
Source London 54p 39p £4.00 +6.4% 13.6 +3.8%
Osprey 85p 79p £0 +7.1% 13.6 +2.4%
ESB Energy 65p 59p £0 +7.2% 13.4 +3.2%
JOLT 69p 69p : +8.1% 12.8 +6.2%
GeniePoint 74p 69p £0 +9.4% 12.0 +4.2%
Shell Recharge 89p 79p £0 +12.1% 10.4 +2.3%
BP Pulse 87p 69p £7.85 +9.6% 10.2 +1.2%
EG On The Move 85p 85p : +7.1% 9.8 +6.3%
Ad-hoc price per kWh by UK charging network, EV Cable Hub UK Charging Network Index 2026. Chart 19. Ad-hoc price per kWh by UK charging network, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.IONITY74pTesla Supercharger67pubitricity45pchar.gy47pBeliev48pConnected Kerb49pFastned79pPod Point59pAlfa Power69pRAW Charging52pMilence72pZest55pSwarco E.Connect58pFuuse-managed sites56pGRIDSERVE82pApplegreen Electric79pEvyve79pMer62pBlink UK61pWenea64pInstaVolt85pMFG EV Power84pSource London54pOsprey85pESB Energy65pJOLT69pGeniePoint74pShell Recharge89pBP Pulse87pEG On The Move85p
Ad-hoc price per kWh by UK charging network, EV Cable Hub UK Charging Network Index 2026. Data: Table 16
Ad-hoc price per kWh against mean device power for each UK charging network. Prices are from the network pricing table and mean device power from the speed mix table on this page. EV Cable Hub UK Charging Network Index 2026. Chart 20. Ad-hoc price per kWh against mean device power for each UK charging network. Prices are from the network pricing table and mean device power from the speed mix table on this page. EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.020406080100070140210280350420IONITYTesla Superchargerubitricitychar.gyBelievConnected KerbFastnedPod PointAlfa PowerRAW ChargingMilenceZestSwarco E.ConnectFuuse-managed sitesGRIDSERVEApplegreen ElectricEvyveMerBlink UKWeneaInstaVoltMFG EV PowerSource LondonOspreyESB EnergyJOLTGeniePointShell RechargeBP PulseEG On The MoveMean device power, kWAd-hoc price, pence per kWh
Ad-hoc price per kWh against mean device power for each UK charging network. Prices are from the network pricing table and mean device power from the speed mix table on this page. EV Cable Hub UK Charging Network Index 2026. Data: Table 16
Price pillar score out of 20 by UK charging network, scored against the mean price for each network's own speed mix. EV Cable Hub UK Charging Network Index 2026. Chart 21. Price pillar score out of 20 by UK charging network, scored against the mean price for each network's own speed mix. EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.IONITY17.8Tesla Supercharger17.4ubitricity17.6char.gy17.2Believ17Connected Kerb16.8Fastned16.4Pod Point15.8Alfa Power15.8RAW Charging15.8Milence15.4Zest15.4Swarco E.Connect15Fuuse-managed sites14.8GRIDSERVE14.8Applegreen Electric14.6Evyve14.6Mer14.6Blink UK14.4Wenea14.2InstaVolt14.2MFG EV Power13.8Source London13.6Osprey13.6ESB Energy13.4JOLT12.8GeniePoint12Shell Recharge10.4BP Pulse10.2EG On The Move9.8
Price pillar score out of 20 by UK charging network, scored against the mean price for each network's own speed mix. EV Cable Hub UK Charging Network Index 2026. Data: Table 16

Subscriptions and membership value#

34 of 68 UK charging networks offered a subscription in 2026, and 26 of those charged no monthly fee. The EV Cable Hub UK Charging Network Index 2026 found the mean subscription saving was 11.1% per kWh, and the largest was 40.5% on IONITY.

A fee-free subscription is a registration, not a subscription. Twenty-six of the 34 schemes fall into that category: you sign up, you get a lower rate, and there is nothing to weigh up because the decision costs nothing. For those 26 networks the break-even is zero kWh a month and the answer is always to register.

The real decision is limited to the five networks that charge a monthly fee, and for those the break-even arithmetic is published in full. IONITY charges £8.99 and cuts 74p to 44p, so the fee is recovered at 30 kWh a month, about 111 miles of driving. Source London charges £4.00 and cuts 54p to 39p, recovered at 27 kWh or 100 miles. Fastned charges £11.99 and cuts 79p to 59p, recovered at 60 kWh or 222 miles. BP Pulse charges £7.85 for a 20.7% cut, recovered at 44 kWh or 163 miles. Tesla Supercharger charges £10.99 for a 22.4% cut, recovered at 74 kWh or 274 miles.

Those break-even points are lower than most drivers expect, and that is the practical finding. A driver taking 274 miles a month of public charging on a single network is not an unusual case. It is roughly a third of average annual mileage taken away from home. The reason most fee-paying subscriptions go unused is not that they fail to pay back; it is that public charging is spread across three or four networks, so no single network reaches its own break-even.

Subscription provision widened in 2026. Twenty-nine networks offered a scheme in the 2025 edition against 34 in this one, and the mean discount rose from 10.4% to 11.1%. The direction of travel is towards fee-free registration schemes rather than paid membership, which suits the multi-network reality of UK charging better than a monthly fee does.

Table 17 Subscription value by network, 2026
Table 17. Subscription value by network, 2026 Source: EV Cable Hub Research, 2026 edition.
Network Ad-hoc Member rate Saving Monthly fee Break-even kWh/month Break-even miles/month Worth it above
IONITY 74p 44p 40.5% £8.99 30 111 111 miles a month
Fastned 79p 59p 25.3% £11.99 60 222 222 miles a month
BP Pulse 87p 69p 20.7% £7.85 44 163 163 miles a month
Tesla Supercharger 67p 52p 22.4% £10.99 74 274 274 miles a month
Source London 54p 39p 27.8% £4.00 27 100 100 miles a month
Shell Recharge 89p 79p 11.2% £0 0 0 Always
InstaVolt 85p 79p 7.1% £0 0 0 Always
Osprey 85p 79p 7.1% £0 0 0 Always
MFG EV Power 84p 79p 6.0% £0 0 0 Always
GRIDSERVE 82p 79p 3.7% £0 0 0 Always
Applegreen Electric 79p 74p 6.3% £0 0 0 Always
Evyve 79p 74p 6.3% £0 0 0 Always
GeniePoint 74p 69p 6.8% £0 0 0 Always
Alfa Power 69p 64p 7.2% £0 0 0 Always
Milence 72p 68p 5.6% £0 0 0 Always
ESB Energy 65p 59p 9.2% £0 0 0 Always
Wenea 64p 59p 7.8% £0 0 0 Always
Mer 62p 55p 11.3% £0 0 0 Always
Blink UK 61p 56p 8.2% £0 0 0 Always
Pod Point 59p 54p 8.5% £0 0 0 Always
Swarco E.Connect 58p 52p 10.3% £0 0 0 Always
Fuuse-managed sites 56p 52p 7.1% £0 0 0 Always
Zest 55p 49p 10.9% £0 0 0 Always
RAW Charging 52p 48p 7.7% £0 0 0 Always
Connected Kerb 49p 44p 10.2% £0 0 0 Always
Believ 48p 44p 8.3% £0 0 0 Always
char.gy 47p 42p 10.6% £0 0 0 Always
ubitricity 45p 41p 8.9% £0 0 0 Always
Subscription saving against the ad-hoc rate by UK charging network, EV Cable Hub UK Charging Network Index 2026. Chart 22. Subscription saving against the ad-hoc rate by UK charging network, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.IONITY40.5%Fastned25.3%BP Pulse20.7%Tesla Supercharger22.4%Source London27.8%Shell Recharge11.2%InstaVolt7.1%Osprey7.1%MFG EV Power6%GRIDSERVE3.7%Applegreen Electric6.3%Evyve6.3%GeniePoint6.8%Alfa Power7.2%Milence5.6%ESB Energy9.2%Wenea7.8%Mer11.3%Blink UK8.2%Pod Point8.5%Swarco E.Connect10.3%Fuuse-managed sites7.1%Zest10.9%RAW Charging7.7%Connected Kerb10.2%Believ8.3%char.gy10.6%ubitricity8.9%
Subscription saving against the ad-hoc rate by UK charging network, EV Cable Hub UK Charging Network Index 2026. Data: Table 17
Ad-hoc price against member rate in pence per kWh for the 28 UK networks operating a subscription or registration scheme. EV Cable Hub UK Charging Network Index 2026. Chart 23. Ad-hoc price against member rate in pence per kWh for the 28 UK networks operating a subscription or registration scheme. EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Ad-hoc priceMember rateIONITY44pFastned59pBP Pulse69pTesla Supercharger52pSource London39pShell Recharge79pInstaVolt79pOsprey79pMFG EV Power79pGRIDSERVE79pApplegreen Electric74pEvyve74pGeniePoint69pAlfa Power64pMilence68pESB Energy59pWenea59pMer55pBlink UK56pPod Point54pSwarco E.Connect52pFuuse-managed sites52pZest49pRAW Charging48pConnected Kerb44pBeliev44pchar.gy42pubitricity41p
Ad-hoc price against member rate in pence per kWh for the 28 UK networks operating a subscription or registration scheme. EV Cable Hub UK Charging Network Index 2026. Data: Table 17

Reliability by network#

Tesla Supercharger recorded the highest successful-first-attempt rate of any UK charging network in 2026 at 99.1%, ahead of InstaVolt on 98.4% and Fastned on 98.1%. The EV Cable Hub Charge Point Verification Programme 2026 measured a network mean of 93.1% across 41,280 verification checks, and a lowest network figure of 82.4%.

The definition has to come before the numbers. A successful first attempt means a charging session started on the first try, without a second attempt, without a call to network support and without moving to another device. It is the strictest of the three availability measures on this page and the closest to what a driver actually experiences, which is why it carries 12 of the 25 reliability points on its own.

The check count is published beside every network figure, because a reliability figure without a sample size is not a figure. EV Cable Hub's 2026 verification programme ran 41,280 checks across 8,240 locations between 1 April and 30 June 2026, with a minimum of 180 checks on every scored network. The largest single network sample was 3,180 checks and the smallest 180, so the confidence interval on the small networks is wider and should be read as such.

Across the whole field, 4.6% of devices needed a second attempt to start, 1.4% needed network support and 0.9% could not be started at all. The mean time to a first successful session start was 74 seconds and the median 41 seconds, and the gap between those two numbers is itself informative: most starts are quick and a long tail of slow ones drags the mean up.

The finding that explains the ranking is a correlation rather than a judgement. Reliability correlates with mean device age at -0.68 and with mean device power at +0.61, and with network size at -0.31. Newer devices start sessions more often than older ones, and ultra-rapid networks are newer, so the top of the reliability table is populated by the newest hardware in the country. The mean device age across the ten most reliable networks was 2.1 years; across the ten least reliable it was 5.4 years. That is a fleet-age effect, not a competence effect, and describing it as anything else would be reading more into the data than it contains.

Mean time to repair spreads far wider than the first-attempt rate does and is arguably the more revealing column. It runs from 1.8 days at the fastest network to 18.2 days at the slowest, a factor of ten, against a first-attempt spread of only 16.7 percentage points. A device that fails on a network with an 18-day repair cycle is effectively gone for most of a month. The overall picture improved: 41 networks raised their reliability against the 2025 edition and 22 saw it fall, with the largest improvement at 4.2 percentage points and the largest decline at 2.6.

Table 18 Reliability by network, 2026
Table 18. Reliability by network, 2026 Source: EV Cable Hub Research, 2026 edition.
Network Successful first attempt Checks Out of service at census Mean time to repair Sessions ending prematurely Reliability score /25
Tesla Supercharger 99.1% 1,240 0.4% 1.8 days 0.6% 24.6
InstaVolt 98.4% 1,840 0.6% 2.1 days 0.8% 24.1
Fastned 98.1% 420 0.7% 2.0 days 0.9% 24.0
Osprey 97.6% 980 0.9% 2.4 days 1.1% 23.8
GRIDSERVE 97.2% 940 1.1% 2.6 days 1.2% 23.4
MFG EV Power 96.8% 860 1.2% 2.8 days 1.4% 22.8
IONITY 96.4% 320 1.4% 3.1 days 1.6% 22.6
Applegreen Electric 96.1% 480 1.5% 3.2 days 1.7% 22.1
Milence 95.8% 180 1.6% 3.4 days 1.8% 21.4
Evyve 95.4% 360 1.8% 3.6 days 2.0% 21.8
Alfa Power 94.8% 420 2.1% 4.2 days 2.2% 20.8
char.gy 94.2% 2,180 2.4% 6.8 days 2.4% 20.6
Shell Recharge 94.1% 1,640 2.4% 4.6 days 2.6% 21.2
Pod Point 93.6% 2,410 2.8% 7.2 days 2.8% 20.4
Connected Kerb 93.2% 2,640 3.0% 8.1 days 3.0% 20.1
Believ 92.8% 1,820 3.2% 8.6 days 3.2% 19.8
Mer 92.6% 620 3.4% 7.8 days 3.4% 19.6
Zest 92.4% 480 3.5% 8.2 days 3.5% 19.2
ubitricity 92.1% 3,180 3.6% 11.8 days 3.6% 19.4
BP Pulse 91.8% 2,180 3.8% 5.4 days 3.8% 19.2
RAW Charging 91.6% 410 3.9% 9.4 days 3.9% 19.0
Swarco E.Connect 91.2% 520 4.1% 9.8 days 4.1% 18.6
Wenea 91.0% 180 4.2% 10.2 days 4.2% 18.4
Fuuse-managed sites 90.8% 940 4.4% 10.6 days 4.4% 18.2
EG On The Move 90.4% 420 4.6% 6.8 days 4.6% 17.8
JOLT 89.8% 210 4.9% 11.2 days 4.9% 17.4
Blink UK 90.1% 240 4.8% 11.0 days 4.8% 17.6
ESB Energy 89.4% 580 5.2% 12.4 days 5.2% 17.2
GeniePoint 88.2% 720 6.1% 14.8 days 6.1% 15.4
Source London 86.4% 940 7.4% 18.2 days 7.4% 14.8
All other networks (38) 90.6% 11,264 4.4% 10.8 days 4.4% 18.1
All networks 93.1% 41,280 3.2% 7.4 days 2.8% 19.4
Successful-first-attempt rate by UK charging network across 41,280 verification checks, EV Cable Hub Charge Point Verification Programme 2026. Chart 24. Successful-first-attempt rate by UK charging network across 41,280 verification checks, EV Cable Hub Charge Point Verification Programme 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Tesla Supercharger99.1%InstaVolt98.4%Fastned98.1%Osprey97.6%GRIDSERVE97.2%MFG EV Power96.8%IONITY96.4%Applegreen Electric96.1%Milence95.8%Evyve95.4%Alfa Power94.8%char.gy94.2%Shell Recharge94.1%Pod Point93.6%Connected Kerb93.2%Believ92.8%Mer92.6%Zest92.4%ubitricity92.1%BP Pulse91.8%RAW Charging91.6%Swarco E.Connect91.2%Wenea91%Fuuse-managed sites90.8%EG On The Move90.4%JOLT89.8%Blink UK90.1%ESB Energy89.4%GeniePoint88.2%Source London86.4%
Successful-first-attempt rate by UK charging network across 41,280 verification checks, EV Cable Hub Charge Point Verification Programme 2026. Data: Table 18
Mean time to repair a faulty device by UK charging network, in days, EV Cable Hub Charge Point Verification Programme 2026. Chart 25. Mean time to repair a faulty device by UK charging network, in days, EV Cable Hub Charge Point Verification Programme 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Tesla Supercharger1.8 daysInstaVolt2.1 daysFastned2 daysOsprey2.4 daysGRIDSERVE2.6 daysMFG EV Power2.8 daysIONITY3.1 daysApplegreen Electric3.2 daysMilence3.4 daysEvyve3.6 daysAlfa Power4.2 dayschar.gy6.8 daysShell Recharge4.6 daysPod Point7.2 daysConnected Kerb8.1 daysBeliev8.6 daysMer7.8 daysZest8.2 daysubitricity11.8 daysBP Pulse5.4 daysRAW Charging9.4 daysSwarco E.Connect9.8 daysWenea10.2 daysFuuse-managed sites10.6 daysEG On The Move6.8 daysJOLT11.2 daysBlink UK11 daysESB Energy12.4 daysGeniePoint14.8 daysSource London18.2 days
Mean time to repair a faulty device by UK charging network, in days, EV Cable Hub Charge Point Verification Programme 2026. Data: Table 18
Successful-first-attempt rate against mean device power for each UK charging network. Device age was the stronger correlate at -0.68, and power stands in for it here because ultra-rapid hardware is the newest in the country. EV Cable Hub Charge Point Verification Programme 2026. Chart 26. Successful-first-attempt rate against mean device power for each UK charging network. Device age was the stronger correlate at -0.68, and power stands in for it here because ultra-rapid hardware is the newest in the country. EV Cable Hub Charge Point Verification Programme 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.020406080100070140210280350420Tesla SuperchargerInstaVoltFastnedOspreyGRIDSERVEMFG EV PowerIONITYApplegreen ElectricMilenceEvyveAlfa Powerchar.gyShell RechargePod PointConnected KerbBelievMerZestubitricityBP PulseRAW ChargingSwarco E.ConnectWeneaFuuse-managed sitesEG On The MoveJOLTBlink UKESB EnergyGeniePointSource LondonMean device power, kWSuccessful first attempt, %
Successful-first-attempt rate against mean device power for each UK charging network. Device age was the stronger correlate at -0.68, and power stands in for it here because ultra-rapid hardware is the newest in the country. EV Cable Hub Charge Point Verification Programme 2026. Data: Table 18

Uptime claims against measured availability#

34 UK charging networks published an uptime figure in 2026, and the mean published claim was 99.1% against a mean measured availability of 96.8%. The EV Cable Hub Charge Point Verification Programme 2026 found a mean gap of 2.3 percentage points between claimed and measured availability, and a largest gap of 8.4 points.

The gap is a definitional difference and not evidence of dishonesty, and that needs saying at the top rather than buried at the bottom. Operator uptime is generally measured at the device: is it powered, is it communicating with the back office, is it reporting a fault. Measured availability is taken at the bay: is the device present, powered, unobstructed and able to accept a connector. A device that is powered and communicating but cannot start a session counts as up on the first definition and unavailable on the second. Both definitions are internally consistent. They are just not the same definition.

Three layers of the same estate produce three different numbers, and all three are published here so the distance between them can be read directly. The mean published uptime claim is 99.1%. The mean measured availability is 96.8%. The mean successful-first-attempt rate is 93.1%. The gap from claim to measured availability is 2.3 percentage points and the gap from claim to first-attempt rate is 6.0 points, with a largest single gap of 11.6 points and a smallest of 0.8.

The causes of the difference are measurable and they are set out rather than inferred. Across the 2026 verification programme, 2.4% of devices were powered and communicating but unable to start a session, 1.1% had a payment terminal fault while power delivery worked normally, 1.8% had a fault on one connector of several, 1.4% were blocked by a non-charging vehicle and 0.9% were unreachable because the site was closed. Those five categories add to roughly the observed gap, and only the first three are within an operator's control at all.

Only 11 of the 34 networks publishing an uptime figure also publish the definition behind it. That is the finding worth acting on, and it is a disclosure question rather than a performance question: a published percentage with no published definition cannot be compared with anything. Three networks recorded a measured availability above their own published claim, which is the clearest possible demonstration that these are different measurements rather than a systematic overstatement.

There is a straightforward fix available to any network that wants the gap closed, and it costs nothing. Publishing the definition alongside the percentage would make 34 published figures comparable overnight. Eleven networks already do it. The other 23 publish a number whose meaning cannot be established from outside, and the index scores none of this. The uptime comparison sits outside the five pillars entirely, because a claim is not a service attribute.

Table 19 Published uptime against measured availability, 2026
Table 19. Published uptime against measured availability, 2026 Source: EV Cable Hub Research, 2026 edition.
Network Published uptime claim Measured availability Gap Successful first attempt Gap to first-attempt rate
Tesla Supercharger 99.9% 99.6% 0.3 pp 99.1% 0.8 pp
InstaVolt 99.4% 99.4% 0.0 pp 98.4% 1.0 pp
Fastned 99.9% 99.3% 0.6 pp 98.1% 1.8 pp
Osprey 99.0% 99.1% -0.1 pp 97.6% 1.4 pp
GRIDSERVE 99.0% 98.9% 0.1 pp 97.2% 1.8 pp
MFG EV Power 99.0% 98.8% 0.2 pp 96.8% 2.2 pp
IONITY 99.0% 98.6% 0.4 pp 96.4% 2.6 pp
Applegreen Electric 99.0% 98.5% 0.5 pp 96.1% 2.9 pp
Shell Recharge 99.0% 97.6% 1.4 pp 94.1% 4.9 pp
BP Pulse 99.0% 96.2% 2.8 pp 91.8% 7.2 pp
Pod Point 99.0% 97.2% 1.8 pp 93.6% 5.4 pp
Connected Kerb 99.0% 97.0% 2.0 pp 93.2% 5.8 pp
char.gy 99.0% 97.6% 1.4 pp 94.2% 4.8 pp
Believ 99.0% 96.8% 2.2 pp 92.8% 6.2 pp
ubitricity 99.5% 96.4% 3.1 pp 92.1% 7.4 pp
GeniePoint 98.0% 93.9% 4.1 pp 88.2% 9.8 pp
Source London 98.0% 92.6% 5.4 pp 86.4% 11.6 pp
Mean, 34 networks publishing a claim 99.1% 96.8% 2.3 pp 93.1% 6.0 pp
Published uptime claim against measured successful-first-attempt rate for the 17 largest UK charging networks publishing a figure. The two measure different things; the distance between the dots is the definitional gap. EV Cable Hub Charge Point Verification Programme 2026. Chart 27. Published uptime claim against measured successful-first-attempt rate for the 17 largest UK charging networks publishing a figure. The two measure different things; the distance between the dots is the definitional gap. EV Cable Hub Charge Point Verification Programme 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Published uptime claimMeasured successful-first-attempt rateTesla Supercharger99.1%InstaVolt98.4%Fastned98.1%Osprey97.6%GRIDSERVE97.2%MFG EV Power96.8%IONITY96.4%Applegreen Electric96.1%Shell Recharge94.1%BP Pulse91.8%Pod Point93.6%Connected Kerb93.2%char.gy94.2%Believ92.8%ubitricity92.1%GeniePoint88.2%Source London86.4%
Published uptime claim against measured successful-first-attempt rate for the 17 largest UK charging networks publishing a figure. The two measure different things; the distance between the dots is the definitional gap. EV Cable Hub Charge Point Verification Programme 2026. Data: Table 19
Gap between each network's published uptime claim and its measured successful-first-attempt rate, in percentage points, EV Cable Hub Charge Point Verification Programme 2026. Chart 28. Gap between each network's published uptime claim and its measured successful-first-attempt rate, in percentage points, EV Cable Hub Charge Point Verification Programme 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Tesla Supercharger0.8 ppInstaVolt1 ppFastned1.8 ppOsprey1.4 ppGRIDSERVE1.8 ppMFG EV Power2.2 ppIONITY2.6 ppApplegreen Electric2.9 ppShell Recharge4.9 ppBP Pulse7.2 ppPod Point5.4 ppConnected Kerb5.8 ppchar.gy4.8 ppBeliev6.2 ppubitricity7.4 ppGeniePoint9.8 ppSource London11.6 pp
Gap between each network's published uptime claim and its measured successful-first-attempt rate, in percentage points, EV Cable Hub Charge Point Verification Programme 2026. Data: Table 19

Contactless payment and payment access#

26 UK charging networks accepted contactless card payment on all their rapid devices in 2026, and 22 accepted contactless on none of their devices. The EV Cable Hub UK Charging Network Index 2026 found 34,020 devices accepting contactless, 34.6% of the UK network, with acceptance at 92.4% on devices rated 50kW and above but 4.1% below 8kW.

Payment access carries 15 points and it is the pillar where the slow on-street networks lose the most ground. Contactless acceptance alone is worth 6 of those 15, with an app-free payment route worth 3, roaming participation worth 3 and price displayed on the unit worth 3.

The split by device speed is close to absolute. Above 50kW, 92.4% of UK devices take a contactless card. Below 8kW, 4.1% do. That is not primarily a policy difference between operators; it is a consequence of unit economics, because a payment terminal costs roughly the same whether it is bolted to a 5 kW lamp post unit or a 350 kW forecourt unit, and the revenue per device differs by two orders of magnitude.

The balanced reading matters here more than in any other section. An on-street network serving residents who register once and then charge outside their own front door for years has far less need for contactless than a motorway network serving strangers who will use it once. The index reflects that only partly, by weighting payment access at 15 rather than 25, and the pillar therefore reads harder on on-street networks than a driver of that type would judge it. Saying so is what keeps the section fair.

The wider payment picture is broader than contactless. Eighteen networks require an app for every session and 34 offer an app-free route. Sixty-one accept an RFID card. Forty-seven are in at least one roaming agreement and 22 are in three or more, carrying a mean of 2.4 roaming platforms each. Twenty-four networks display the price on the unit itself and 32 display it only in an app, which is a transparency gap rather than an access one but is scored inside the same pillar.

Pre-authorisation holds are the least visible part of paying for a charge. The mean hold across UK networks in 2026 was £28 and 19 networks apply none at all. A hold is not a charge and it is released, but it sits against a card balance for days on some networks, and a driver taking four public charges on a trip can have over a hundred pounds held against a card without having spent it.

Table 20 Payment access by network, 2026
Table 20. Payment access by network, 2026 Source: EV Cable Hub Research, 2026 edition.
Network Contactless devices Contactless share App required RFID accepted Roaming platforms Price shown on unit Payment score /15
Fastned 640 100% No Yes 6 Yes 14.6
InstaVolt 3,240 100% No Yes 5 Yes 14.2
Osprey 1,720 100% No Yes 5 Yes 14.0
GRIDSERVE 1,640 100% No Yes 4 Yes 13.8
MFG EV Power 1,480 100% No Yes 4 Yes 13.4
Shell Recharge 2,180 56.5% No Yes 5 Partial 13.2
Applegreen Electric 720 100% No Yes 3 Yes 13.2
Evyve 540 100% No Yes 3 Yes 13.0
BP Pulse 2,410 44.5% No Yes 5 Partial 12.8
EG On The Move 860 100% No Yes 2 Yes 12.4
IONITY 480 100% No Yes 4 Partial 12.4
Milence 210 100% No Yes 2 Yes 12.4
Tesla Supercharger 2,180 100% Partial No 1 Partial 12.1
Alfa Power 480 75.0% No Yes 3 Yes 12.0
Pod Point 1,182 18.8% Mostly Yes 4 Partial 10.6
JOLT 380 100% No Yes 1 Yes 10.4
Zest 246 25.1% Mostly Yes 3 Partial 10.4
Mer 340 25.4% Mostly Yes 3 Partial 10.2
Wenea 180 52.9% No Yes 2 Partial 10.2
RAW Charging 180 22.0% Mostly Yes 2 Partial 10.0
Swarco E.Connect 260 24.5% Mostly Yes 2 Partial 9.8
Blink UK 120 26.1% Mostly Yes 2 Partial 9.6
ESB Energy 420 35.6% Mostly Yes 2 Partial 8.8
Fuuse-managed sites 310 16.0% Mostly Yes 3 No 8.6
Connected Kerb 62 0.9% Yes Yes 3 No 8.4
GeniePoint 780 54.9% Mostly Yes 2 Partial 8.2
Believ 184 4.0% Yes Yes 2 No 7.4
char.gy 0 0.0% Yes Yes 3 No 7.2
Source London 48 2.5% Yes Yes 1 No 5.4
ubitricity 0 0.0% Yes Yes 2 No 4.2
Share of each UK charging network's devices accepting a contactless card, EV Cable Hub UK Charging Network Index 2026. Chart 29. Share of each UK charging network's devices accepting a contactless card, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Fastned100%InstaVolt100%Osprey100%GRIDSERVE100%MFG EV Power100%Shell Recharge56.5%Applegreen Electric100%Evyve100%BP Pulse44.5%EG On The Move100%IONITY100%Milence100%Tesla Supercharger100%Alfa Power75%Pod Point18.8%JOLT100%Zest25.1%Mer25.4%Wenea52.9%RAW Charging22%Swarco E.Connect24.5%Blink UK26.1%ESB Energy35.6%Fuuse-managed sites16%Connected Kerb0.9%GeniePoint54.9%Believ4%char.gy0%Source London2.5%ubitricity0%
Share of each UK charging network's devices accepting a contactless card, EV Cable Hub UK Charging Network Index 2026. Data: Table 20
Payment access pillar score out of 15 by UK charging network, EV Cable Hub UK Charging Network Index 2026. Chart 30. Payment access pillar score out of 15 by UK charging network, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Fastned14.6InstaVolt14.2Osprey14GRIDSERVE13.8MFG EV Power13.4Shell Recharge13.2Applegreen Electric13.2Evyve13BP Pulse12.8EG On The Move12.4IONITY12.4Milence12.4Tesla Supercharger12.1Alfa Power12Pod Point10.6JOLT10.4Zest10.4Mer10.2Wenea10.2RAW Charging10Swarco E.Connect9.8Blink UK9.6ESB Energy8.8Fuuse-managed sites8.6Connected Kerb8.4GeniePoint8.2Believ7.4char.gy7.2Source London5.4ubitricity4.2
Payment access pillar score out of 15 by UK charging network, EV Cable Hub UK Charging Network Index 2026. Data: Table 20
Roaming platforms carried by each UK charging network, EV Cable Hub UK Charging Network Index 2026. Chart 31. Roaming platforms carried by each UK charging network, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Fastned6InstaVolt5Osprey5GRIDSERVE4MFG EV Power4Shell Recharge5Applegreen Electric3Evyve3BP Pulse5EG On The Move2IONITY4Milence2Tesla Supercharger1Alfa Power3Pod Point4JOLT1Zest3Mer3Wenea2RAW Charging2Swarco E.Connect2Blink UK2ESB Energy2Fuuse-managed sites3Connected Kerb3GeniePoint2Believ2char.gy3Source London1ubitricity2
Roaming platforms carried by each UK charging network, EV Cable Hub UK Charging Network Index 2026. Data: Table 20

Amenities and site quality#

1,124 UK charging hubs had on-site toilets in 2026 and 1,048 had on-site food and drink, of 1,486 hubs in total. The EV Cable Hub Location Audit 2026 found 894 hubs had at least one accessible bay and 268 had at least one pull-through bay suitable for a vehicle towing a trailer.

Amenities are not scored in the index and the reason is structural rather than editorial. Amenity provision is a site attribute, not a network attribute, and a large share of UK charging networks operate at sites they do not own or control: a forecourt, a supermarket car park, a hotel. Holding an operator responsible for whether the retailer next door keeps its toilets open would be scoring the wrong entity. The data is published anyway, because it is genuinely useful to a driver planning a stop.

The headline provision is better than reputation suggests. Across all 1,486 UK hubs, 75.6% have toilets, 70.5% have food and drink, 96.9% are lit at night, 86.5% have CCTV and 79.5% have 24-hour access. The weakest categories are shelter at 41.2% and a dedicated waiting area at 19.1%, which are the two that matter most on the days when charging is least pleasant.

Accessibility is where the picture is hardest. EV Cable Hub's 2026 Location Audit found 60.2% of hubs have at least one accessible bay, but only 28.8% meet a 3.0 metre accessible bay width and only 41.2% are sites where a wheelchair user could reach the connector unaided. Mean bay width at hub sites is 2.6 metres. Those three figures together say that accessible provision at UK charging hubs is more often a designated bay than a usable one.

Two physical measurements from the audit have direct consequences for equipment. Mean bay-to-unit distance at hub sites is 1.2 metres and the mean tethered cable length is 4.8 metres, but at 186 hubs (12.5%) the tethered cable does not reach a rear-port vehicle parked in at least one of the bays. Pull-through bays, the only practical option for a vehicle towing anything, exist at 268 hubs, 18.0% of the total.

Table 21 Amenities by network, hub sites only, 2026
Table 21. Amenities by network, hub sites only, 2026 Source: EV Cable Hub Research, 2026 edition.
Network Hub sites With toilets With food and drink With a canopy With an accessible bay With a pull-through bay Lit at night
GRIDSERVE 140 138 136 128 132 62 140
Tesla Supercharger 218 196 184 42 148 34 214
InstaVolt 186 174 168 84 138 41 182
Fastned 58 54 46 58 48 24 58
IONITY 62 58 54 34 46 18 62
MFG EV Power 96 94 92 42 68 21 94
Applegreen Electric 48 48 48 24 38 14 48
Shell Recharge 121 118 116 62 84 26 118
BP Pulse 148 142 138 48 96 18 144
Osprey 84 68 62 32 61 12 82
EG On The Move 42 42 42 18 32 8 42
Milence 24 24 22 24 18 24 24
Evyve 34 28 24 14 24 6 34
All other hub operators 225 140 108 62 61 20 198
All hubs 1,486 1,124 1,048 612 894 268 1,440
Hub sites operated against hubs with at least one accessible bay, 13 UK networks, EV Cable Hub Location Audit 2026. Chart 32. Hub sites operated against hubs with at least one accessible bay, 13 UK networks, EV Cable Hub Location Audit 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Hub sites operatedHubs with at least one accessible bayGRIDSERVE132Tesla Supercharger148InstaVolt138Fastned48IONITY46MFG EV Power68Applegreen Electric38Shell Recharge84BP Pulse96Osprey61EG On The Move32Milence18Evyve24
Hub sites operated against hubs with at least one accessible bay, 13 UK networks, EV Cable Hub Location Audit 2026. Data: Table 21
On-site toilets and food provision at charging hubs by network, EV Cable Hub Location Audit 2026. Chart 33. On-site toilets and food provision at charging hubs by network, EV Cable Hub Location Audit 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Hubs with toiletsHubs with food and drinkGRIDSERVE138136Tesla Supercharger196184InstaVolt174168Fastned5446IONITY5854MFG EV Power9492Applegreen Electric4848Shell Recharge118116BP Pulse142138Osprey6862EG On The Move4242Milence2422Evyve2824
On-site toilets and food provision at charging hubs by network, EV Cable Hub Location Audit 2026. Data: Table 21

Network growth and expansion#

Milence grew fastest of any UK charging network in 2026 at 112.1%, ahead of JOLT on 64.2% and Believ on 62.1%. The EV Cable Hub UK Charging Network Index 2026 found the ten fastest-growing networks added 8,240 devices between them, 37.9% of all devices added in the twelve months.

Growth is not scored, because growth is not provision. A network that doubles from 99 devices to 210 has grown 112.1% and still operates fewer devices than any other network in the scored field. But growth is the best available predictor of the next edition's ranking, and publishing it is what makes this page a series rather than a snapshot.

Growth is concentrating rather than spreading. The ten fastest-growing networks accounted for 37.9% of all UK device additions in the twelve months to June 2026, from 14.6% of the installed base. The two largest absolute contributors were char.gy at 2,261 devices and ubitricity at 2,263, each 10.4% of all UK additions, and both are on-street networks, which is why mean device power rose only 10.1% in a year when ultra-rapid provision expanded sharply.

Percentage growth and absolute growth pick out completely different networks and both are published for that reason. Milence's 112.1% is 111 devices. ubitricity's 21.4% is 2,263 devices. A regional newspaper looking for the fastest-growing network in the UK and a driver looking for where new devices actually appeared are asking different questions, and answering the first with the second's data is the most common error in coverage of this market.

The slowest growers are as informative as the fastest. Source London grew 4.1%, GeniePoint 6.8% and Blink UK 8.6% in a market that added devices at more than 20% overall. Three of the four slowest-growing networks in the field are also in the bottom third of the ranking, and the relationship runs through coverage: a network that is not adding devices is losing coverage share every year, whether or not it loses devices.

Table 22 Network growth, twelve months to June 2026
Table 22. Network growth, twelve months to June 2026 Source: EV Cable Hub Research, 2026 edition.
Network Devices June 2025 Devices June 2026 Net addition Growth Share of all UK additions
Milence 99 210 111 +112.1% 0.5%
JOLT 231 380 149 +64.2% 0.7%
Believ 2,844 4,610 1,766 +62.1% 8.1%
Fuuse-managed sites 1,258 1,940 682 +54.2% 3.1%
Evyve 364 540 176 +48.4% 0.8%
MFG EV Power 1,012 1,480 468 +46.2% 2.2%
Applegreen Electric 505 720 215 +42.6% 1.0%
InstaVolt 2,295 3,240 945 +41.2% 4.3%
char.gy 5,859 8,120 2,261 +38.6% 10.4%
EG On The Move 623 860 237 +38.1% 1.1%
Fastned 470 640 170 +36.2% 0.8%
Osprey 1,276 1,720 444 +34.8% 2.0%
Zest 744 980 236 +31.8% 1.1%
Connected Kerb 5,347 6,940 1,593 +29.8% 7.3%
GRIDSERVE 1,277 1,640 363 +28.4% 1.7%
RAW Charging 649 820 171 +26.4% 0.8%
Shell Recharge 3,098 3,860 762 +24.6% 3.5%
Mer 1,095 1,340 245 +22.4% 1.1%
ubitricity 10,577 12,840 2,263 +21.4% 10.4%
Wenea 280 340 60 +21.4% 0.3%
Tesla Supercharger 1,820 2,180 360 +19.8% 1.7%
BP Pulse 4,569 5,410 841 +18.4% 3.9%
Alfa Power 541 640 99 +18.2% 0.5%
Swarco E.Connect 925 1,060 135 +14.6% 0.6%
IONITY 418 480 62 +14.8% 0.3%
Pod Point 5,647 6,280 633 +11.2% 2.9%
ESB Energy 1,078 1,180 102 +9.4% 0.5%
Blink UK 424 460 36 +8.6% 0.2%
GeniePoint 1,329 1,420 91 +6.8% 0.4%
Source London 1,835 1,910 75 +4.1% 0.3%
Device growth by UK charging network in the twelve months to June 2026, EV Cable Hub UK Charging Network Index 2026. Chart 34. Device growth by UK charging network in the twelve months to June 2026, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Milence112.1%JOLT64.2%Believ62.1%Fuuse-managed sites54.2%Evyve48.4%MFG EV Power46.2%Applegreen Electric42.6%InstaVolt41.2%char.gy38.6%EG On The Move38.1%Fastned36.2%Osprey34.8%Zest31.8%Connected Kerb29.8%GRIDSERVE28.4%RAW Charging26.4%Shell Recharge24.6%Mer22.4%ubitricity21.4%Wenea21.4%Tesla Supercharger19.8%BP Pulse18.4%Alfa Power18.2%Swarco E.Connect14.6%IONITY14.8%Pod Point11.2%ESB Energy9.4%Blink UK8.6%GeniePoint6.8%Source London4.1%
Device growth by UK charging network in the twelve months to June 2026, EV Cable Hub UK Charging Network Index 2026. Data: Table 22
Device count a year apart for the fifteen fastest-growing UK charging networks, EV Cable Hub UK Charging Network Index 2026. Chart 35. Device count a year apart for the fifteen fastest-growing UK charging networks, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Devices, June 2025Devices, June 2026Milence99210JOLT231380Believ2,8444,610Fuuse-managed sites1,2581,940Evyve364540MFG EV Power1,0121,480Applegreen Electric505720InstaVolt2,2953,240char.gy5,8598,120EG On The Move623860Fastned470640Osprey1,2761,720Zest744980Connected Kerb5,3476,940GRIDSERVE1,2771,640
Device count a year apart for the fifteen fastest-growing UK charging networks, EV Cable Hub UK Charging Network Index 2026. Data: Table 22
Devices added by each UK charging network in the twelve months to June 2026, EV Cable Hub UK Charging Network Index 2026. Chart 36. Devices added by each UK charging network in the twelve months to June 2026, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.Milence111JOLT149Believ1,766Fuuse-managed sites682Evyve176MFG EV Power468Applegreen Electric215InstaVolt945char.gy2,261EG On The Move237Fastned170Osprey444Zest236Connected Kerb1,593GRIDSERVE363RAW Charging171Shell Recharge762Mer245ubitricity2,263Wenea60Tesla Supercharger360BP Pulse841Alfa Power99Swarco E.Connect135IONITY62Pod Point633ESB Energy102Blink UK36GeniePoint91Source London75
Devices added by each UK charging network in the twelve months to June 2026, EV Cable Hub UK Charging Network Index 2026. Data: Table 22

Consolidation and networks that have gone#

The number of UK public charging networks fell from 74 to 68 in the twelve months to June 2026, the first net decline the EV Cable Hub UK Charging Network Index has recorded. Seven networks were acquired or merged, one ceased operating, and two new networks entered the market.

Consolidation is the structural story of the 2026 edition. The arithmetic is straightforward: minus seven for acquisition and merger, minus one for the single exit, plus two new entrants, for a net change of minus six. It is the first time in four editions that the count has gone down, and it happened in a year when the total device count rose by more than a fifth.

The acquisitions moved 4,860 devices between operators, 4.9% of the UK network, without a single new device being installed. That is the part of the year's activity that changes nothing physical and everything administrative: the same units in the same bays, under a different app, on a different tariff, with a different support line. Five of the seven acquired networks recorded improved reliability after the change of operator, with a mean improvement of 2.4 percentage points, which is the clearest argument in the data that consolidation is not purely a loss to drivers.

The single network exit was small and mostly recovered. It affected 248 devices, of which 186 were reinstated under a new operator and 62 were permanently lost. Sixty-two devices is a rounding error against a national total of roughly 98,000 connectors, but for the drivers who parked next to them it was the whole of their local provision, and it is the case worth watching as more small networks reach the end of their funding cycles.

The shape of the market changed at both ends. Networks with fewer than 100 devices fell from 31 to 24, and networks with over 1,000 devices rose from 15 to 19. Mean devices per network rose from 1,035 to 1,446. The top ten networks' share of devices rose from 61.8% to 63.6% and their share of installed capacity from 68.2% to 71.5%, so concentration is rising faster in capacity than in unit count.

For a driver, consolidation reads as fewer apps to install, wider roaming coverage and a smaller number of networks whose reliability now determines the national average. That last consequence is the one worth tracking. When the top ten hold 71.5% of installed capacity, the national successful-first-attempt rate is effectively a weighted average of ten operational decisions rather than sixty-eight.

Which network suits which driver#

No single UK charging network scored above 19 of 25 on coverage and above 24 of 25 on reliability in 2026, so no network covers every use case. The EV Cable Hub UK Charging Network Index 2026 found that a driver needs a mean of 3.4 network registrations to cover 90% of their likely charging locations.

This section is built as a decision table rather than as advice, and the reasoning behind every row is stated as pillar scores rather than as a recommendation. Six driver profiles, each with the pillars that decide the outcome for that profile, and the networks that score highest on those specific pillars.

The long-distance motorway driver is decided by strategic road network coverage, reliability and speed, and needs three registrations for 90% coverage of likely locations with no cable required. The urban driver without off-street parking is decided by coverage in their own region, price and payment access, needs two registrations, and needs a cable at every session. Those two profiles sit at opposite ends of the index and share almost no networks between them, which is the clearest illustration on the page that a single 'best network' answer does not exist.

The registration arithmetic is the practical payoff and it is published in full. One registration with the largest network by devices reaches 13.1% of UK devices but 0.0% of rapid devices. Two reaches 21.3% of devices and still no rapid provision, because the two largest networks by device count are both on-street slow operators. Three registrations chosen on coverage score reach 34.2% of devices and 28.4% of rapid devices. Five reach 48.4% and ten reach 68.4%.

The roaming route beats almost all of them. A single registration with the best roaming platform reaches 47 networks, 75.5% of UK devices, 82.4% of rapid devices and 78.1% of locations, more than holding the best fifteen individual network accounts. That is the highest-value single line in this section and it is not widely known.

Behaviour lags the arithmetic. UK drivers held a mean of 3.8 network accounts and 4.2 charging apps in 2026, 26.4% used a single network exclusively, and only 38.6% held a roaming RFID card. Eighteen point two per cent have abandoned a charge because they had no account for the network in front of them and 11.4% because they had no cable, while 31.8% of public sessions required a driver-supplied cable. Our guide to matching your cable rating to your car, the EV charging cable range, the granny charger range and our UK EV market and running cost statistics cover what to carry and what it costs.

The registration table also settles a question that comes up whenever public charging is discussed. Holding more accounts produces diminishing returns quickly: the first three registrations buy 34.2% of UK devices, the next seven buy 34.2 percentage points more, and the ten after that buy 16.2. Past about six registrations a driver is paying attention costs for coverage they will rarely use, which is why the roaming route matters more than the individual network choice for most people.

Table 23 Network fit by driver profile, 2026
Table 23. Network fit by driver profile, 2026 Source: EV Cable Hub Research, 2026 edition.
Driver profile Pillars that matter most Highest scoring networks on those pillars Registrations needed for 90% coverage Cable required
Long-distance motorway driver Coverage on SRN, reliability, speed GRIDSERVE, InstaVolt, Tesla Supercharger, IONITY, Fastned 3 No
Urban driver with no off-street parking Coverage in own region, price, payment access ubitricity, char.gy, Connected Kerb, Believ 2 Yes, every session
Home charger who tops up occasionally Reliability, payment access, price InstaVolt, Osprey, Pod Point, Shell Recharge 3 Sometimes
High-mileage fleet or business driver Coverage, reliability, subscription value BP Pulse, Shell Recharge, InstaVolt, IONITY 4 Sometimes
Rural driver Coverage in own region, reliability InstaVolt, Osprey, MFG EV Power, Pod Point 4 Sometimes
Van or LCV driver Speed, pull-through bays, coverage GRIDSERVE, Milence, InstaVolt, MFG EV Power 3 No
Table 24 Coverage achieved by number of network registrations, 2026
Table 24. Coverage achieved by number of network registrations, 2026 Source: EV Cable Hub Research, 2026 edition.
Registrations held Networks Share of UK devices reachable Share of UK rapid devices reachable Share of UK locations reachable
1 Largest by devices 13.1% 0.0% 27.3%
2 Top 2 by devices 21.3% 0.0% 45.0%
3 Best 3 by coverage score 34.2% 28.4% 41.8%
4 Best 4 by coverage score 41.6% 38.1% 48.2%
5 Best 5 by coverage score 48.4% 46.8% 54.1%
6 Best 6 by coverage score 54.2% 54.2% 58.6%
8 Best 8 by coverage score 62.8% 66.4% 66.2%
10 Best 10 by coverage score 68.4% 74.6% 71.8%
15 Best 15 by coverage score 78.2% 84.1% 80.4%
20 Best 20 by coverage score 84.6% 89.8% 86.2%
Roaming platform, best single 47 networks 75.5% 82.4% 78.1%
Share of the UK charging network reachable by the number of network registrations held. The final point is a single roaming platform covering 47 networks. EV Cable Hub UK Charging Network Index 2026. Chart 37. Share of the UK charging network reachable by the number of network registrations held. The final point is a single roaming platform covering 47 networks. EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.020406080100Devices reachableRapid devices reachableLocations reachable1234568101520Roaming platform, best single
Share of the UK charging network reachable by the number of network registrations held. The final point is a single roaming platform covering 47 networks. EV Cable Hub UK Charging Network Index 2026. Data: Table 24

Year on year, 2025 against 2026#

The mean UK charging network score rose from 60.8 to 63.4 between the 2025 and 2026 editions of the EV Cable Hub UK Charging Network Index, an improvement of 2.6 points. Reliability rose 1.7 percentage points to 93.1% while the mean ad-hoc price rose 4.4% to 59.2p per kWh.

The year-on-year table is designed as a permanent fixture. Every edition the previous year's column moves left, a new column appears on the right, and the section is republished with the same 28 measures. That is what turns a comparison page into a series, and a series is what a citing writer comes back to.

On the index measures, UK charging improved on almost every axis except price. The mean score rose 2.6 points, the highest score rose 1.8 and the lowest rose 3.5, so the field tightened from the bottom. Networks scoring 75 or above rose from four to six and networks below 50 fell from 19 to 14. The mean successful-first-attempt rate rose 1.7 percentage points, devices out of service fell 0.3 points and mean time to repair fell 1.2 days.

Payment access improved fastest of the five pillars. Devices accepting contactless rose 46.8% to 34,020, lifting the contactless share of the network from 30.3% to 34.6%. Networks accepting contactless on all their rapid devices rose from 19 to 26 and networks accepting it nowhere fell from 28 to 22. Roaming agreements rose from 38 networks to 47. That is the fastest single-year movement on any measure in the table.

Price is the counterweight and it should be read plainly. The mean ad-hoc price rose 4.4% to 59.2p per kWh, the cheapest large-network price rose 2.3% to 45p and the most expensive rose 2.3% to 89p. Charging got more reliable, more accessible and faster in 2026, and it also got more expensive. Both halves of that sentence are in the same table.

Three measures are worth watching into the next edition and they are named here so the next edition can be held to them. First, contactless acceptance below 22kW, currently the weakest segment by a wide margin. Second, the gap between published uptime claims and the measured first-attempt rate, which narrowed from 7.4 to 6.0 percentage points and is the measure most likely to move if definitions are standardised. Third, whether consolidation continues, because the first net decline in network count could be the start of a trend or a single year's noise.

Table 25 Year-on-year comparison, 2025 against 2026
Table 25. Year-on-year comparison, 2025 against 2026 Source: EV Cable Hub Research, 2026 edition.
Measure 2025 edition 2026 edition Change
Networks scored 74 68 -6
Mean network score 60.8 63.4 +2.6
Highest network score 82.4 84.2 +1.8
Lowest network score 32.1 35.6 +3.5
Networks scoring 75 or above 4 6 +2
Networks scoring below 50 19 14 -5
Mean successful-first-attempt rate 91.4% 93.1% +1.7 pp
Highest successful-first-attempt rate 98.6% 99.1% +0.5 pp
Lowest successful-first-attempt rate 79.8% 82.4% +2.6 pp
Mean devices out of service 3.5% 3.2% -0.3 pp
Mean time to repair 8.6 days 7.4 days -1.2 days
Mean ad-hoc price 56.7p 59.2p +4.4%
Cheapest large-network price 44p 45p +2.3%
Most expensive large-network price 87p 89p +2.3%
Networks offering a subscription 29 34 +5
Mean subscription discount 10.4% 11.1% +0.7 pp
Devices accepting contactless 23,180 34,020 +46.8%
Contactless share of devices 30.3% 34.6% +4.3 pp
Networks accepting contactless on all rapid devices 19 26 +7
Networks accepting contactless on no devices 28 22 -6
Networks in a roaming agreement 38 47 +9
Mean device power 39.5 kW 43.5 kW +10.1%
Networks operating hubs 19 24 +5
Charging hubs 1,074 1,486 +38.4%
Networks offering CHAdeMO 18 14 -4
Networks with untethered Type 2 44 41 -3
Untethered share of connectors 44.6% 42.4% -2.2 pp
Mean gap, uptime claim to first-attempt rate 7.4 pp 6.0 pp -1.4 pp
Five headline index measures a year apart, 2025 edition against 2026 edition, EV Cable Hub UK Charging Network Index 2026. Chart 38. Five headline index measures a year apart, 2025 edition against 2026 edition, EV Cable Hub UK Charging Network Index 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.2025 edition2026 editionMean network score63.4Highest score84.2Lowest score35.6Mean successful-first-attempt rate93.1Mean ad-hoc price, pence59.2
Five headline index measures a year apart, 2025 edition against 2026 edition, EV Cable Hub UK Charging Network Index 2026. Data: Table 25

Previous editions of the Network Index#

This is the fourth edition of the EV Cable Hub UK Charging Network Index. The first edition, published in January 2024, scored 61 networks with a mean score of 54.2, meaning the UK charging market has improved 9.2 points across the life of the index.

The index publishes a flagship edition every January and an interim edition every July, with the reliability measures tracked monthly in between. Each edition is snapshotted to a permanent dated child page, each monthly reliability update to its own short page carrying that month's table, and every archive page carries a canonical pointer back to the live page and a banner naming which edition it is. Archive pages are never deleted and never redirected, so a citation to a specific edition never breaks.

The longitudinal series is the thing that cannot be reconstructed from anywhere else. Mean score has risen from 54.2 to 57.4 to 60.8 to 63.4 across the four editions. The mean successful-first-attempt rate has risen from 88.6% to 90.2% to 91.4% to 93.1%. The top score has risen from 78.4 to 84.2. And the number of networks scored rose from 61 to 68 to 74 before falling back to 68, which is the consolidation story visible in a single column.

Scores are never retrospectively restated. If the method changes, the change is published in the methodology with the previous method stated alongside it, and the prior edition's scores stand as they were published. That rule exists because a restated score breaks every citation made against the original, and an index whose history can be edited is not a record of anything.

One caution on reading across editions. Because every sub-measure is normalised against the observed field, scores are relative to the market of their own year and are not directly comparable between editions without reference to the mean. The mean is published in the archive table beside every edition's top score for exactly that reason: a score of 82.4 against a mean of 60.8 and a score of 84.2 against a mean of 63.4 describe almost the same distance from the middle of the field.

Table 26 Network Index edition archive
Table 26. Network Index edition archive Source: EV Cable Hub Research, 2026 edition.
Edition Published Data as at Networks scored Mean score Top network Top score Mean first-attempt rate
First January 2024 31 Dec 2023 61 54.2 Tesla Supercharger 78.4 88.6%
Second January 2025 31 Dec 2024 68 57.4 Tesla Supercharger 80.1 90.2%
Third January 2026 31 Dec 2025 74 60.8 Tesla Supercharger 82.4 91.4%
Fourth (current) July 2026 30 Jun 2026 68 63.4 InstaVolt 84.2 93.1%
Mean network score, top score and mean successful-first-attempt rate across the four editions of the EV Cable Hub UK Charging Network Index, 2024 to 2026. Chart 39. Mean network score, top score and mean successful-first-attempt rate across the four editions of the EV Cable Hub UK Charging Network Index, 2024 to 2026. All values are shown as text on the chart and repeated in the data table it is drawn from. EV Cable Hub Research, 2026 edition.566472808896Mean scoreTop scoreMean first-attempt rateFirstSecondThirdFourth (current)
Mean network score, top score and mean successful-first-attempt rate across the four editions of the EV Cable Hub UK Charging Network Index, 2024 to 2026. Data: Table 26

Interactive tools#

A comparator covering all 30 ranked networks across 33 measures, two calculators built on the 2026 pricing tables, a searchable table of every figure on this page, and a twenty-item setup checklist that remembers where you got to. Everything runs in the browser.

Each tool draws on the tables above rather than on a separate dataset, so every figure they return can be checked against the table it came from. The comparator is the one to start with: it is the whole scored dataset for two networks side by side, including the pillar scores that produced their ranks.

UK charging network comparator

Pick any two of the 30 UK charging networks scored above 300 devices and compare them across all 33 measures published on this page, from the five pillar scores to whether you need to bring your own cable.

Measure : :
Index rank of 68, 2026 : :
Index score of 100 : :
Coverage pillar /25 : :
Reliability pillar /25 : :
Price pillar /20 : :
Payment access pillar /15 : :
Speed and connectors pillar /15 : :
Rank in the 2025 edition : :
Rank change since 2025 : :
Public devices : :
Locations : :
UK regions covered of 12 : :
Local authorities reached of 374 : :
Strategic road network sites : :
Installed capacity : :
Mean device power : :
Ultra-rapid share of devices : :
Ad-hoc price per kWh : :
Member rate per kWh : :
Monthly subscription fee : :
Successful first attempt : :
Verification checks : :
Devices out of service : :
Mean time to repair : :
Contactless share of devices : :
App required : :
Roaming platforms carried : :
Price shown on the unit : :
Charging hub sites : :
Devices added in the year : :
Device growth in the year : :
Driver must supply a cable : :
Typical cable length required : :

Every figure comes from the tables on this page: the ranking and pillar scores from Table 6, size from Table 7, hubs from Table 12, speed from Table 13, connectors from Tables 14 and 15, price from Table 16, reliability from Table 18, payment from Table 20 and growth from Table 22.

Network charging cost calculator

Enter a charge and this returns what it costs at each UK network's 2026 ad-hoc rate, against the network mean of 59.2p and against the cheapest large network at 45p.

: Energy delivered
: Cost of this charge
: Cost per mile
: Same charge at the 59.2p network mean
: Same charge at the cheapest network, 45p
: Annual cost at this mileage

Prices are the 2026 ad-hoc rates from Table 16 and the mean and cheapest figures from Table 2. Cost per mile uses 3.7 miles per kWh, the same basis the break-even mileage in Table 17 is built on, so a 42 kWh charge at 89p returns £37.38 against £18.90 at 45p. That is the 44p spread quoted in the pricing section.

Subscription break-even calculator

Twenty-six of the 34 UK subscription schemes charge no monthly fee, so there is nothing to work out. For the five that do charge, this reproduces the break-even in Table 17 and tells you what your own usage would save.

: Saving per kWh
: Break-even
: Break-even in miles a month
: Your monthly saving after the fee
: Worth it above

Break-even kWh is the monthly fee divided by the saving per kWh, rounded up, and break-even miles converts it at 3.7 miles per kWh. Both reproduce Table 17 exactly: IONITY returns 30 kWh and 111 miles, Fastned 60 and 222, BP Pulse 44 and 163, Tesla Supercharger 74 and 274, Source London 27 and 100.

Sortable master data table

Every figure on this page in one place, searchable and sortable, with a link back to the table it came from. 511 rows.

Master data table. Every figure published on this page, with its source table. Source: EV Cable Hub Research, 2026 edition.
Measure 2026 figure Source table Table title
1 InstaVolt Table 1 The 2026 top ten networks
2 Fastned Table 1 The 2026 top ten networks
3 Tesla Supercharger Table 1 The 2026 top ten networks
4 GRIDSERVE Table 1 The 2026 top ten networks
5 Osprey Table 1 The 2026 top ten networks
6 IONITY Table 1 The 2026 top ten networks
7 MFG EV Power Table 1 The 2026 top ten networks
8 Applegreen Electric Table 1 The 2026 top ten networks
9 Evyve Table 1 The 2026 top ten networks
10 Shell Recharge Table 1 The 2026 top ten networks
Networks scored 68 Table 2 Index headline figures, 2026
Highest score 84.2 (InstaVolt) Table 2 Index headline figures, 2026
Lowest score 35.6 Table 2 Index headline figures, 2026
Mean score 63.4 Table 2 Index headline figures, 2026
Median score 61.8 Table 2 Index headline figures, 2026
Networks scoring 75 or above 6 Table 2 Index headline figures, 2026
Networks scoring 70 or above 10 Table 2 Index headline figures, 2026
Networks scoring below 50 14 Table 2 Index headline figures, 2026
Mean successful-first-attempt rate, all networks 93.1% Table 2 Index headline figures, 2026
Highest successful-first-attempt rate 99.1% Table 2 Index headline figures, 2026
Lowest successful-first-attempt rate 82.4% Table 2 Index headline figures, 2026
Mean ad-hoc price across networks 59.2p/kWh Table 2 Index headline figures, 2026
Cheapest large-network ad-hoc price 45p/kWh Table 2 Index headline figures, 2026
Most expensive large-network ad-hoc price 89p/kWh Table 2 Index headline figures, 2026
Networks accepting contactless on all rapid devices 26 Table 2 Index headline figures, 2026
Networks accepting contactless on no devices 22 Table 2 Index headline figures, 2026
Networks offering a subscription 34 Table 2 Index headline figures, 2026
Networks in a roaming agreement 47 Table 2 Index headline figures, 2026
Networks operating in all 12 UK regions 9 Table 2 Index headline figures, 2026
Networks operating in one region only 21 Table 2 Index headline figures, 2026
Mean device power across networks 43.5 kW Table 2 Index headline figures, 2026
Highest network mean device power 212 kW Table 2 Index headline figures, 2026
Networks operating charging hubs 24 Table 2 Index headline figures, 2026
Networks that ceased trading in the period 1 Table 2 Index headline figures, 2026
Networks acquired or merged in the period 7 Table 2 Index headline figures, 2026
Coverage 25 points Table 3 Scoring pillars and weights, 2026
Reliability 25 points Table 3 Scoring pillars and weights, 2026
Price 20 points Table 3 Scoring pillars and weights, 2026
Payment access 15 points Table 3 Scoring pillars and weights, 2026
Speed and connectors 15 points Table 3 Scoring pillars and weights, 2026
Device count 12,840 Table 4 Sub-measure normalisation, 2026
Location count 11,420 Table 4 Sub-measure normalisation, 2026
Regions covered of 12 12 Table 4 Sub-measure normalisation, 2026
Strategic road network sites 318 Table 4 Sub-measure normalisation, 2026
Local authorities reached of 374 218 Table 4 Sub-measure normalisation, 2026
Successful-first-attempt rate 99.1% Table 4 Sub-measure normalisation, 2026
Devices out of service 0.4% Table 4 Sub-measure normalisation, 2026
Mean time to repair 1.8 days Table 4 Sub-measure normalisation, 2026
Sessions ending prematurely 0.6% Table 4 Sub-measure normalisation, 2026
Ad-hoc price against speed-adjusted mean -21.4% Table 4 Sub-measure normalisation, 2026
Subscription discount 40.5% Table 4 Sub-measure normalisation, 2026
Additional fee burden per session £0.00 Table 4 Sub-measure normalisation, 2026
Contactless acceptance 100% Table 4 Sub-measure normalisation, 2026
Roaming platforms carried 6 Table 4 Sub-measure normalisation, 2026
Mean device power 212 kW Table 4 Sub-measure normalisation, 2026
Ultra-rapid share of devices 100% Table 4 Sub-measure normalisation, 2026
Connector standards offered 4 Table 4 Sub-measure normalisation, 2026
Customer service quality Cannot be measured consistently across 68 networks Table 5 What the index deliberately excludes
App design and user experience Subjective and version-dependent Table 5 What the index deliberately excludes
Brand recognition Not a service attribute Table 5 What the index deliberately excludes
Corporate ownership and funding Does not affect the driver at the charge point Table 5 What the index deliberately excludes
Future expansion commitments Announcements are not provision Table 5 What the index deliberately excludes
Renewable energy claims Not independently verifiable at device level Table 5 What the index deliberately excludes
Networks operating fewer than 20 public devices 6 operators covering 84 devices, listed separately in the dataset Table 5 What the index deliberately excludes
1 InstaVolt Table 6 Full network ranking, 2026
2 Fastned Table 6 Full network ranking, 2026
3 Tesla Supercharger Table 6 Full network ranking, 2026
4 GRIDSERVE Table 6 Full network ranking, 2026
5 Osprey Table 6 Full network ranking, 2026
6 IONITY Table 6 Full network ranking, 2026
7 MFG EV Power Table 6 Full network ranking, 2026
8 Applegreen Electric Table 6 Full network ranking, 2026
9 Evyve Table 6 Full network ranking, 2026
10 Shell Recharge Table 6 Full network ranking, 2026
11 Pod Point Table 6 Full network ranking, 2026
12 Milence Table 6 Full network ranking, 2026
13 Connected Kerb Table 6 Full network ranking, 2026
14 BP Pulse Table 6 Full network ranking, 2026
15 char.gy Table 6 Full network ranking, 2026
16 Alfa Power Table 6 Full network ranking, 2026
17 Believ Table 6 Full network ranking, 2026
18 Mer Table 6 Full network ranking, 2026
19 ubitricity Table 6 Full network ranking, 2026
20 Zest Table 6 Full network ranking, 2026
21 RAW Charging Table 6 Full network ranking, 2026
22 Swarco E.Connect Table 6 Full network ranking, 2026
23 EG On The Move Table 6 Full network ranking, 2026
24 Fuuse-managed sites Table 6 Full network ranking, 2026
25 Wenea Table 6 Full network ranking, 2026
26 Blink UK Table 6 Full network ranking, 2026
27 ESB Energy Table 6 Full network ranking, 2026
28 JOLT Table 6 Full network ranking, 2026
29 GeniePoint Table 6 Full network ranking, 2026
30 Source London Table 6 Full network ranking, 2026
: Mean, all 68 scored networks Table 6 Full network ranking, 2026
ubitricity 12,840 Table 7 Network size, 2026
char.gy 8,120 Table 7 Network size, 2026
Connected Kerb 6,940 Table 7 Network size, 2026
Pod Point 6,280 Table 7 Network size, 2026
BP Pulse 5,410 Table 7 Network size, 2026
Believ 4,610 Table 7 Network size, 2026
Shell Recharge 3,860 Table 7 Network size, 2026
InstaVolt 3,240 Table 7 Network size, 2026
Tesla Supercharger 2,180 Table 7 Network size, 2026
Fuuse-managed sites 1,940 Table 7 Network size, 2026
Source London 1,910 Table 7 Network size, 2026
Osprey 1,720 Table 7 Network size, 2026
GRIDSERVE 1,640 Table 7 Network size, 2026
MFG EV Power 1,480 Table 7 Network size, 2026
GeniePoint 1,420 Table 7 Network size, 2026
Mer 1,340 Table 7 Network size, 2026
ESB Energy 1,180 Table 7 Network size, 2026
Swarco E.Connect 1,060 Table 7 Network size, 2026
Zest 980 Table 7 Network size, 2026
EG On The Move 860 Table 7 Network size, 2026
RAW Charging 820 Table 7 Network size, 2026
Applegreen Electric 720 Table 7 Network size, 2026
Fastned 640 Table 7 Network size, 2026
Alfa Power 640 Table 7 Network size, 2026
Evyve 540 Table 7 Network size, 2026
IONITY 480 Table 7 Network size, 2026
Blink UK 460 Table 7 Network size, 2026
JOLT 380 Table 7 Network size, 2026
Wenea 340 Table 7 Network size, 2026
Milence 210 Table 7 Network size, 2026
InstaVolt 8 Table 8 Size rank against index rank, 2026
Fastned 23 Table 8 Size rank against index rank, 2026
Tesla Supercharger 9 Table 8 Size rank against index rank, 2026
GRIDSERVE 13 Table 8 Size rank against index rank, 2026
Osprey 12 Table 8 Size rank against index rank, 2026
IONITY 26 Table 8 Size rank against index rank, 2026
MFG EV Power 14 Table 8 Size rank against index rank, 2026
Shell Recharge 7 Table 8 Size rank against index rank, 2026
Pod Point 4 Table 8 Size rank against index rank, 2026
Connected Kerb 3 Table 8 Size rank against index rank, 2026
BP Pulse 5 Table 8 Size rank against index rank, 2026
char.gy 2 Table 8 Size rank against index rank, 2026
ubitricity 1 Table 8 Size rank against index rank, 2026
Source London 11 Table 8 Size rank against index rank, 2026
Greater London 52 Table 9 Networks operating in each UK region, 2026
South East 46 Table 9 Networks operating in each UK region, 2026
North West 41 Table 9 Networks operating in each UK region, 2026
South West 38 Table 9 Networks operating in each UK region, 2026
East of England 37 Table 9 Networks operating in each UK region, 2026
West Midlands 36 Table 9 Networks operating in each UK region, 2026
Scotland 34 Table 9 Networks operating in each UK region, 2026
Yorkshire and the Humber 33 Table 9 Networks operating in each UK region, 2026
East Midlands 31 Table 9 Networks operating in each UK region, 2026
Wales 26 Table 9 Networks operating in each UK region, 2026
North East 24 Table 9 Networks operating in each UK region, 2026
Northern Ireland 14 Table 9 Networks operating in each UK region, 2026
Pod Point 12 Table 10 Regional coverage by network, top 20 networks, 2026
InstaVolt 12 Table 10 Regional coverage by network, top 20 networks, 2026
BP Pulse 12 Table 10 Regional coverage by network, top 20 networks, 2026
Shell Recharge 12 Table 10 Regional coverage by network, top 20 networks, 2026
Osprey 12 Table 10 Regional coverage by network, top 20 networks, 2026
GeniePoint 12 Table 10 Regional coverage by network, top 20 networks, 2026
Connected Kerb 12 Table 10 Regional coverage by network, top 20 networks, 2026
Tesla Supercharger 12 Table 10 Regional coverage by network, top 20 networks, 2026
MFG EV Power 12 Table 10 Regional coverage by network, top 20 networks, 2026
GRIDSERVE 12 Table 10 Regional coverage by network, top 20 networks, 2026
Believ 11 Table 10 Regional coverage by network, top 20 networks, 2026
EG On The Move 11 Table 10 Regional coverage by network, top 20 networks, 2026
Fuuse-managed sites 11 Table 10 Regional coverage by network, top 20 networks, 2026
char.gy 10 Table 10 Regional coverage by network, top 20 networks, 2026
Mer 10 Table 10 Regional coverage by network, top 20 networks, 2026
Zest 10 Table 10 Regional coverage by network, top 20 networks, 2026
Applegreen Electric 10 Table 10 Regional coverage by network, top 20 networks, 2026
ubitricity 9 Table 10 Regional coverage by network, top 20 networks, 2026
Swarco E.Connect 9 Table 10 Regional coverage by network, top 20 networks, 2026
RAW Charging 9 Table 10 Regional coverage by network, top 20 networks, 2026
BP Pulse 84 Table 11 Strategic road network presence, 2026
GRIDSERVE 68 Table 11 Strategic road network presence, 2026
Shell Recharge 62 Table 11 Strategic road network presence, 2026
Tesla Supercharger 48 Table 11 Strategic road network presence, 2026
InstaVolt 41 Table 11 Strategic road network presence, 2026
IONITY 34 Table 11 Strategic road network presence, 2026
Fastned 26 Table 11 Strategic road network presence, 2026
MFG EV Power 24 Table 11 Strategic road network presence, 2026
Applegreen Electric 21 Table 11 Strategic road network presence, 2026
Osprey 18 Table 11 Strategic road network presence, 2026
Milence 14 Table 11 Strategic road network presence, 2026
EG On The Move 12 Table 11 Strategic road network presence, 2026
Pod Point 8 Table 11 Strategic road network presence, 2026
Alfa Power 8 Table 11 Strategic road network presence, 2026
GeniePoint 6 Table 11 Strategic road network presence, 2026
Evyve 6 Table 11 Strategic road network presence, 2026
Fuuse-managed sites 4 Table 11 Strategic road network presence, 2026
ESB Energy 4 Table 11 Strategic road network presence, 2026
Tesla Supercharger 218 Table 12 Charging hubs by network, 2026
GRIDSERVE 140 Table 12 Charging hubs by network, 2026
InstaVolt 186 Table 12 Charging hubs by network, 2026
BP Pulse 148 Table 12 Charging hubs by network, 2026
Shell Recharge 121 Table 12 Charging hubs by network, 2026
MFG EV Power 96 Table 12 Charging hubs by network, 2026
Osprey 84 Table 12 Charging hubs by network, 2026
IONITY 62 Table 12 Charging hubs by network, 2026
Fastned 58 Table 12 Charging hubs by network, 2026
Applegreen Electric 48 Table 12 Charging hubs by network, 2026
EG On The Move 42 Table 12 Charging hubs by network, 2026
Evyve 34 Table 12 Charging hubs by network, 2026
Milence 24 Table 12 Charging hubs by network, 2026
Alfa Power 18 Table 12 Charging hubs by network, 2026
Pod Point 14 Table 12 Charging hubs by network, 2026
Mer 12 Table 12 Charging hubs by network, 2026
Zest 11 Table 12 Charging hubs by network, 2026
GeniePoint 10 Table 12 Charging hubs by network, 2026
ESB Energy 9 Table 12 Charging hubs by network, 2026
Connected Kerb 8 Table 12 Charging hubs by network, 2026
Swarco E.Connect 8 Table 12 Charging hubs by network, 2026
Wenea 6 Table 12 Charging hubs by network, 2026
Blink UK 4 Table 12 Charging hubs by network, 2026
Fuuse-managed sites 4 Table 12 Charging hubs by network, 2026
IONITY 329 kW Table 13 Speed and power mix by network, 2026
Milence 371 kW Table 13 Speed and power mix by network, 2026
Fastned 231 kW Table 13 Speed and power mix by network, 2026
Tesla Supercharger 203 kW Table 13 Speed and power mix by network, 2026
GRIDSERVE 190 kW Table 13 Speed and power mix by network, 2026
InstaVolt 189 kW Table 13 Speed and power mix by network, 2026
EG On The Move 172 kW Table 13 Speed and power mix by network, 2026
Osprey 156 kW Table 13 Speed and power mix by network, 2026
Applegreen Electric 183 kW Table 13 Speed and power mix by network, 2026
MFG EV Power 192 kW Table 13 Speed and power mix by network, 2026
Evyve 137 kW Table 13 Speed and power mix by network, 2026
Shell Recharge 77 kW Table 13 Speed and power mix by network, 2026
BP Pulse 71 kW Table 13 Speed and power mix by network, 2026
Alfa Power 66 kW Table 13 Speed and power mix by network, 2026
JOLT 74 kW Table 13 Speed and power mix by network, 2026
Wenea 41 kW Table 13 Speed and power mix by network, 2026
GeniePoint 41 kW Table 13 Speed and power mix by network, 2026
Zest 27 kW Table 13 Speed and power mix by network, 2026
Mer 28 kW Table 13 Speed and power mix by network, 2026
ESB Energy 29 kW Table 13 Speed and power mix by network, 2026
Blink UK 26 kW Table 13 Speed and power mix by network, 2026
RAW Charging 26 kW Table 13 Speed and power mix by network, 2026
Swarco E.Connect 23 kW Table 13 Speed and power mix by network, 2026
Fuuse-managed sites 24 kW Table 13 Speed and power mix by network, 2026
Pod Point 12 kW Table 13 Speed and power mix by network, 2026
Connected Kerb 8.4 kW Table 13 Speed and power mix by network, 2026
Believ 11 kW Table 13 Speed and power mix by network, 2026
Source London 11.5 kW Table 13 Speed and power mix by network, 2026
char.gy 5.0 kW Table 13 Speed and power mix by network, 2026
ubitricity 5.0 kW Table 13 Speed and power mix by network, 2026
ubitricity 0 Table 14 Connector mix by network, 2026
char.gy 0 Table 14 Connector mix by network, 2026
Connected Kerb 812 Table 14 Connector mix by network, 2026
Believ 486 Table 14 Connector mix by network, 2026
Source London 284 Table 14 Connector mix by network, 2026
Pod Point 3,486 Table 14 Connector mix by network, 2026
Fuuse-managed sites 1,242 Table 14 Connector mix by network, 2026
RAW Charging 486 Table 14 Connector mix by network, 2026
Swarco E.Connect 682 Table 14 Connector mix by network, 2026
Zest 574 Table 14 Connector mix by network, 2026
Blink UK 318 Table 14 Connector mix by network, 2026
Mer 942 Table 14 Connector mix by network, 2026
ESB Energy 786 Table 14 Connector mix by network, 2026
BP Pulse 3,142 Table 14 Connector mix by network, 2026
Shell Recharge 2,046 Table 14 Connector mix by network, 2026
GeniePoint 618 Table 14 Connector mix by network, 2026
Wenea 186 Table 14 Connector mix by network, 2026
Alfa Power 148 Table 14 Connector mix by network, 2026
JOLT 62 Table 14 Connector mix by network, 2026
Osprey 138 Table 14 Connector mix by network, 2026
InstaVolt 96 Table 14 Connector mix by network, 2026
GRIDSERVE 184 Table 14 Connector mix by network, 2026
MFG EV Power 92 Table 14 Connector mix by network, 2026
Evyve 42 Table 14 Connector mix by network, 2026
Applegreen Electric 48 Table 14 Connector mix by network, 2026
EG On The Move 62 Table 14 Connector mix by network, 2026
Fastned 0 Table 14 Connector mix by network, 2026
IONITY 0 Table 14 Connector mix by network, 2026
Tesla Supercharger 0 Table 14 Connector mix by network, 2026
Milence 0 Table 14 Connector mix by network, 2026
Lamp post and on-street slow 8 Table 15 Cable requirement by network type, 2026
Local authority fast networks 14 Table 15 Cable requirement by network type, 2026
Destination and workplace 19 Table 15 Cable requirement by network type, 2026
Mixed-speed national networks 9 Table 15 Cable requirement by network type, 2026
Rapid and ultra-rapid only 18 Table 15 Cable requirement by network type, 2026
All networks 68 Table 15 Cable requirement by network type, 2026
IONITY 74p Table 16 Network pricing, 2026
Tesla Supercharger 67p Table 16 Network pricing, 2026
ubitricity 45p Table 16 Network pricing, 2026
char.gy 47p Table 16 Network pricing, 2026
Believ 48p Table 16 Network pricing, 2026
Connected Kerb 49p Table 16 Network pricing, 2026
Fastned 79p Table 16 Network pricing, 2026
Pod Point 59p Table 16 Network pricing, 2026
Alfa Power 69p Table 16 Network pricing, 2026
RAW Charging 52p Table 16 Network pricing, 2026
Milence 72p Table 16 Network pricing, 2026
Zest 55p Table 16 Network pricing, 2026
Swarco E.Connect 58p Table 16 Network pricing, 2026
Fuuse-managed sites 56p Table 16 Network pricing, 2026
GRIDSERVE 82p Table 16 Network pricing, 2026
Applegreen Electric 79p Table 16 Network pricing, 2026
Evyve 79p Table 16 Network pricing, 2026
Mer 62p Table 16 Network pricing, 2026
Blink UK 61p Table 16 Network pricing, 2026
Wenea 64p Table 16 Network pricing, 2026
InstaVolt 85p Table 16 Network pricing, 2026
MFG EV Power 84p Table 16 Network pricing, 2026
Source London 54p Table 16 Network pricing, 2026
Osprey 85p Table 16 Network pricing, 2026
ESB Energy 65p Table 16 Network pricing, 2026
JOLT 69p Table 16 Network pricing, 2026
GeniePoint 74p Table 16 Network pricing, 2026
Shell Recharge 89p Table 16 Network pricing, 2026
BP Pulse 87p Table 16 Network pricing, 2026
EG On The Move 85p Table 16 Network pricing, 2026
IONITY 74p Table 17 Subscription value by network, 2026
Fastned 79p Table 17 Subscription value by network, 2026
BP Pulse 87p Table 17 Subscription value by network, 2026
Tesla Supercharger 67p Table 17 Subscription value by network, 2026
Source London 54p Table 17 Subscription value by network, 2026
Shell Recharge 89p Table 17 Subscription value by network, 2026
InstaVolt 85p Table 17 Subscription value by network, 2026
Osprey 85p Table 17 Subscription value by network, 2026
MFG EV Power 84p Table 17 Subscription value by network, 2026
GRIDSERVE 82p Table 17 Subscription value by network, 2026
Applegreen Electric 79p Table 17 Subscription value by network, 2026
Evyve 79p Table 17 Subscription value by network, 2026
GeniePoint 74p Table 17 Subscription value by network, 2026
Alfa Power 69p Table 17 Subscription value by network, 2026
Milence 72p Table 17 Subscription value by network, 2026
ESB Energy 65p Table 17 Subscription value by network, 2026
Wenea 64p Table 17 Subscription value by network, 2026
Mer 62p Table 17 Subscription value by network, 2026
Blink UK 61p Table 17 Subscription value by network, 2026
Pod Point 59p Table 17 Subscription value by network, 2026
Swarco E.Connect 58p Table 17 Subscription value by network, 2026
Fuuse-managed sites 56p Table 17 Subscription value by network, 2026
Zest 55p Table 17 Subscription value by network, 2026
RAW Charging 52p Table 17 Subscription value by network, 2026
Connected Kerb 49p Table 17 Subscription value by network, 2026
Believ 48p Table 17 Subscription value by network, 2026
char.gy 47p Table 17 Subscription value by network, 2026
ubitricity 45p Table 17 Subscription value by network, 2026
Tesla Supercharger 99.1% Table 18 Reliability by network, 2026
InstaVolt 98.4% Table 18 Reliability by network, 2026
Fastned 98.1% Table 18 Reliability by network, 2026
Osprey 97.6% Table 18 Reliability by network, 2026
GRIDSERVE 97.2% Table 18 Reliability by network, 2026
MFG EV Power 96.8% Table 18 Reliability by network, 2026
IONITY 96.4% Table 18 Reliability by network, 2026
Applegreen Electric 96.1% Table 18 Reliability by network, 2026
Milence 95.8% Table 18 Reliability by network, 2026
Evyve 95.4% Table 18 Reliability by network, 2026
Alfa Power 94.8% Table 18 Reliability by network, 2026
char.gy 94.2% Table 18 Reliability by network, 2026
Shell Recharge 94.1% Table 18 Reliability by network, 2026
Pod Point 93.6% Table 18 Reliability by network, 2026
Connected Kerb 93.2% Table 18 Reliability by network, 2026
Believ 92.8% Table 18 Reliability by network, 2026
Mer 92.6% Table 18 Reliability by network, 2026
Zest 92.4% Table 18 Reliability by network, 2026
ubitricity 92.1% Table 18 Reliability by network, 2026
BP Pulse 91.8% Table 18 Reliability by network, 2026
RAW Charging 91.6% Table 18 Reliability by network, 2026
Swarco E.Connect 91.2% Table 18 Reliability by network, 2026
Wenea 91.0% Table 18 Reliability by network, 2026
Fuuse-managed sites 90.8% Table 18 Reliability by network, 2026
EG On The Move 90.4% Table 18 Reliability by network, 2026
JOLT 89.8% Table 18 Reliability by network, 2026
Blink UK 90.1% Table 18 Reliability by network, 2026
ESB Energy 89.4% Table 18 Reliability by network, 2026
GeniePoint 88.2% Table 18 Reliability by network, 2026
Source London 86.4% Table 18 Reliability by network, 2026
All other networks (38) 90.6% Table 18 Reliability by network, 2026
All networks 93.1% Table 18 Reliability by network, 2026
Tesla Supercharger 99.9% Table 19 Published uptime against measured availability, 2026
InstaVolt 99.4% Table 19 Published uptime against measured availability, 2026
Fastned 99.9% Table 19 Published uptime against measured availability, 2026
Osprey 99.0% Table 19 Published uptime against measured availability, 2026
GRIDSERVE 99.0% Table 19 Published uptime against measured availability, 2026
MFG EV Power 99.0% Table 19 Published uptime against measured availability, 2026
IONITY 99.0% Table 19 Published uptime against measured availability, 2026
Applegreen Electric 99.0% Table 19 Published uptime against measured availability, 2026
Shell Recharge 99.0% Table 19 Published uptime against measured availability, 2026
BP Pulse 99.0% Table 19 Published uptime against measured availability, 2026
Pod Point 99.0% Table 19 Published uptime against measured availability, 2026
Connected Kerb 99.0% Table 19 Published uptime against measured availability, 2026
char.gy 99.0% Table 19 Published uptime against measured availability, 2026
Believ 99.0% Table 19 Published uptime against measured availability, 2026
ubitricity 99.5% Table 19 Published uptime against measured availability, 2026
GeniePoint 98.0% Table 19 Published uptime against measured availability, 2026
Source London 98.0% Table 19 Published uptime against measured availability, 2026
Mean, 34 networks publishing a claim 99.1% Table 19 Published uptime against measured availability, 2026
Fastned 640 Table 20 Payment access by network, 2026
InstaVolt 3,240 Table 20 Payment access by network, 2026
Osprey 1,720 Table 20 Payment access by network, 2026
GRIDSERVE 1,640 Table 20 Payment access by network, 2026
MFG EV Power 1,480 Table 20 Payment access by network, 2026
Shell Recharge 2,180 Table 20 Payment access by network, 2026
Applegreen Electric 720 Table 20 Payment access by network, 2026
Evyve 540 Table 20 Payment access by network, 2026
BP Pulse 2,410 Table 20 Payment access by network, 2026
EG On The Move 860 Table 20 Payment access by network, 2026
IONITY 480 Table 20 Payment access by network, 2026
Milence 210 Table 20 Payment access by network, 2026
Tesla Supercharger 2,180 Table 20 Payment access by network, 2026
Alfa Power 480 Table 20 Payment access by network, 2026
Pod Point 1,182 Table 20 Payment access by network, 2026
JOLT 380 Table 20 Payment access by network, 2026
Zest 246 Table 20 Payment access by network, 2026
Mer 340 Table 20 Payment access by network, 2026
Wenea 180 Table 20 Payment access by network, 2026
RAW Charging 180 Table 20 Payment access by network, 2026
Swarco E.Connect 260 Table 20 Payment access by network, 2026
Blink UK 120 Table 20 Payment access by network, 2026
ESB Energy 420 Table 20 Payment access by network, 2026
Fuuse-managed sites 310 Table 20 Payment access by network, 2026
Connected Kerb 62 Table 20 Payment access by network, 2026
GeniePoint 780 Table 20 Payment access by network, 2026
Believ 184 Table 20 Payment access by network, 2026
char.gy 0 Table 20 Payment access by network, 2026
Source London 48 Table 20 Payment access by network, 2026
ubitricity 0 Table 20 Payment access by network, 2026
GRIDSERVE 140 Table 21 Amenities by network, hub sites only, 2026
Tesla Supercharger 218 Table 21 Amenities by network, hub sites only, 2026
InstaVolt 186 Table 21 Amenities by network, hub sites only, 2026
Fastned 58 Table 21 Amenities by network, hub sites only, 2026
IONITY 62 Table 21 Amenities by network, hub sites only, 2026
MFG EV Power 96 Table 21 Amenities by network, hub sites only, 2026
Applegreen Electric 48 Table 21 Amenities by network, hub sites only, 2026
Shell Recharge 121 Table 21 Amenities by network, hub sites only, 2026
BP Pulse 148 Table 21 Amenities by network, hub sites only, 2026
Osprey 84 Table 21 Amenities by network, hub sites only, 2026
EG On The Move 42 Table 21 Amenities by network, hub sites only, 2026
Milence 24 Table 21 Amenities by network, hub sites only, 2026
Evyve 34 Table 21 Amenities by network, hub sites only, 2026
All other hub operators 225 Table 21 Amenities by network, hub sites only, 2026
All hubs 1,486 Table 21 Amenities by network, hub sites only, 2026
Milence 99 Table 22 Network growth, twelve months to June 2026
JOLT 231 Table 22 Network growth, twelve months to June 2026
Believ 2,844 Table 22 Network growth, twelve months to June 2026
Fuuse-managed sites 1,258 Table 22 Network growth, twelve months to June 2026
Evyve 364 Table 22 Network growth, twelve months to June 2026
MFG EV Power 1,012 Table 22 Network growth, twelve months to June 2026
Applegreen Electric 505 Table 22 Network growth, twelve months to June 2026
InstaVolt 2,295 Table 22 Network growth, twelve months to June 2026
char.gy 5,859 Table 22 Network growth, twelve months to June 2026
EG On The Move 623 Table 22 Network growth, twelve months to June 2026
Fastned 470 Table 22 Network growth, twelve months to June 2026
Osprey 1,276 Table 22 Network growth, twelve months to June 2026
Zest 744 Table 22 Network growth, twelve months to June 2026
Connected Kerb 5,347 Table 22 Network growth, twelve months to June 2026
GRIDSERVE 1,277 Table 22 Network growth, twelve months to June 2026
RAW Charging 649 Table 22 Network growth, twelve months to June 2026
Shell Recharge 3,098 Table 22 Network growth, twelve months to June 2026
Mer 1,095 Table 22 Network growth, twelve months to June 2026
ubitricity 10,577 Table 22 Network growth, twelve months to June 2026
Wenea 280 Table 22 Network growth, twelve months to June 2026
Tesla Supercharger 1,820 Table 22 Network growth, twelve months to June 2026
BP Pulse 4,569 Table 22 Network growth, twelve months to June 2026
Alfa Power 541 Table 22 Network growth, twelve months to June 2026
Swarco E.Connect 925 Table 22 Network growth, twelve months to June 2026
IONITY 418 Table 22 Network growth, twelve months to June 2026
Pod Point 5,647 Table 22 Network growth, twelve months to June 2026
ESB Energy 1,078 Table 22 Network growth, twelve months to June 2026
Blink UK 424 Table 22 Network growth, twelve months to June 2026
GeniePoint 1,329 Table 22 Network growth, twelve months to June 2026
Source London 1,835 Table 22 Network growth, twelve months to June 2026
Long-distance motorway driver Coverage on SRN, reliability, speed Table 23 Network fit by driver profile, 2026
Urban driver with no off-street parking Coverage in own region, price, payment access Table 23 Network fit by driver profile, 2026
Home charger who tops up occasionally Reliability, payment access, price Table 23 Network fit by driver profile, 2026
High-mileage fleet or business driver Coverage, reliability, subscription value Table 23 Network fit by driver profile, 2026
Rural driver Coverage in own region, reliability Table 23 Network fit by driver profile, 2026
Van or LCV driver Speed, pull-through bays, coverage Table 23 Network fit by driver profile, 2026
1 Largest by devices Table 24 Coverage achieved by number of network registrations, 2026
2 Top 2 by devices Table 24 Coverage achieved by number of network registrations, 2026
3 Best 3 by coverage score Table 24 Coverage achieved by number of network registrations, 2026
4 Best 4 by coverage score Table 24 Coverage achieved by number of network registrations, 2026
5 Best 5 by coverage score Table 24 Coverage achieved by number of network registrations, 2026
6 Best 6 by coverage score Table 24 Coverage achieved by number of network registrations, 2026
8 Best 8 by coverage score Table 24 Coverage achieved by number of network registrations, 2026
10 Best 10 by coverage score Table 24 Coverage achieved by number of network registrations, 2026
15 Best 15 by coverage score Table 24 Coverage achieved by number of network registrations, 2026
20 Best 20 by coverage score Table 24 Coverage achieved by number of network registrations, 2026
Roaming platform, best single 47 networks Table 24 Coverage achieved by number of network registrations, 2026
Networks scored 74 Table 25 Year-on-year comparison, 2025 against 2026
Mean network score 60.8 Table 25 Year-on-year comparison, 2025 against 2026
Highest network score 82.4 Table 25 Year-on-year comparison, 2025 against 2026
Lowest network score 32.1 Table 25 Year-on-year comparison, 2025 against 2026
Networks scoring 75 or above 4 Table 25 Year-on-year comparison, 2025 against 2026
Networks scoring below 50 19 Table 25 Year-on-year comparison, 2025 against 2026
Mean successful-first-attempt rate 91.4% Table 25 Year-on-year comparison, 2025 against 2026
Highest successful-first-attempt rate 98.6% Table 25 Year-on-year comparison, 2025 against 2026
Lowest successful-first-attempt rate 79.8% Table 25 Year-on-year comparison, 2025 against 2026
Mean devices out of service 3.5% Table 25 Year-on-year comparison, 2025 against 2026
Mean time to repair 8.6 days Table 25 Year-on-year comparison, 2025 against 2026
Mean ad-hoc price 56.7p Table 25 Year-on-year comparison, 2025 against 2026
Cheapest large-network price 44p Table 25 Year-on-year comparison, 2025 against 2026
Most expensive large-network price 87p Table 25 Year-on-year comparison, 2025 against 2026
Networks offering a subscription 29 Table 25 Year-on-year comparison, 2025 against 2026
Mean subscription discount 10.4% Table 25 Year-on-year comparison, 2025 against 2026
Devices accepting contactless 23,180 Table 25 Year-on-year comparison, 2025 against 2026
Contactless share of devices 30.3% Table 25 Year-on-year comparison, 2025 against 2026
Networks accepting contactless on all rapid devices 19 Table 25 Year-on-year comparison, 2025 against 2026
Networks accepting contactless on no devices 28 Table 25 Year-on-year comparison, 2025 against 2026
Networks in a roaming agreement 38 Table 25 Year-on-year comparison, 2025 against 2026
Mean device power 39.5 kW Table 25 Year-on-year comparison, 2025 against 2026
Networks operating hubs 19 Table 25 Year-on-year comparison, 2025 against 2026
Charging hubs 1,074 Table 25 Year-on-year comparison, 2025 against 2026
Networks offering CHAdeMO 18 Table 25 Year-on-year comparison, 2025 against 2026
Networks with untethered Type 2 44 Table 25 Year-on-year comparison, 2025 against 2026
Untethered share of connectors 44.6% Table 25 Year-on-year comparison, 2025 against 2026
Mean gap, uptime claim to first-attempt rate 7.4 pp Table 25 Year-on-year comparison, 2025 against 2026
First January 2024 Table 26 Network Index edition archive
Second January 2025 Table 26 Network Index edition archive
Third January 2026 Table 26 Network Index edition archive
Fourth (current) July 2026 Table 26 Network Index edition archive

511 figures shown

The 2026 charging network setup checklist

Twenty items across four stages. Tap once to tick, twice to mark not applicable, and the page remembers where you got to. Percentages exclude anything you mark not applicable.

0%

Not started

0 of 20 complete

Stage 1: work out what you need

  • I have identified my driver profile from the six in Table 23
  • I know my home region and how many networks operate there (14 in Northern Ireland, 52 in Greater London)
  • I have confirmed my vehicle's connector standard
  • I have confirmed my vehicle's maximum DC charging rate, so I know which speed tier is worth paying for
  • I know how many registrations I need for 90% coverage in my region (the UK mean is 3.4)

Stage 2: register with the right networks

  • I am registered with the highest-scoring network in my region
  • I am registered with the highest-scoring network on the motorway routes I use
  • I am registered with at least one network that accepts contactless, as a fallback (26 accept it on all rapid devices)
  • I hold one roaming platform account covering multiple networks (the best single one reaches 47 networks and 75.5% of UK devices)
  • I have checked whether any of my networks has a subscription worth the fee at my mileage (only five charge one)

Stage 3: sort your cable and connectors

  • I have checked the untethered share of every network I registered with in Table 14
  • I own a Type 2 cable if any of my networks requires one (eight networks require one at every session)
  • I have checked the cable length I need against local bay-to-unit distances (the mean at untethered sites is 2.9 metres)
  • My cable rating matches or exceeds my car's maximum AC intake
  • I keep a Mode 2 granny charger in the vehicle as a last resort

Stage 4: set up for a reliable charge

  • I have added a payment card to every registered network app
  • I have checked the pre-authorisation hold on each network (the UK mean is £28, and 19 networks apply none)
  • I have checked the overstay fee and grace period on the rapid networks I use
  • I have saved my three most-used locations in each app
  • I know the second network available at my regular motorway stop (74 of 132 service areas have one)

Every figure attached to an item comes from a table on this page. Nothing is stored anywhere but your own browser, and no email address is required.

Methodology#

Every figure on this page comes from one of four EV Cable Hub studies closed on 30 June 2026: the UK Charging Network Index itself, a verification programme of 41,280 charge point checks, a tariff basket of 4,208 published prices, and a physical audit of 2,140 charging locations.

1. The EV Cable Hub UK Charging Network Index 2026. A scored assessment of every UK public charging network operating 20 or more public devices as at 30 June 2026, comprising 68 networks. Each network is scored out of 100 across five pillars using the sub-measures and weights published in the scoring section. Each sub-measure is normalised on a 0 to 1 scale against the best and worst values observed across all 68 networks and multiplied by its weight. Ties are broken on reliability, then coverage. Six operators running fewer than 20 public devices, 84 devices between them, are excluded from scoring and listed separately in the downloadable dataset.2. The EV Cable Hub Charge Point Verification Programme 2026. 41,280 individual verification checks carried out between 1 April and 30 June 2026 across 8,240 charging locations, covering device presence, operational status, connector configuration, displayed pricing, payment method acceptance and successful session start. Checks were distributed proportionally across regions, speed bands and networks, with a minimum of 180 checks on every network scored. A successful first attempt means a charging session started on the first try, without a second attempt, without a call to network support and without moving to another device. This programme produces every reliability and availability figure on this page.3. The EV Cable Hub Public Charging Tariff Basket 2026. 4,208 individual published tariffs captured across all 68 networks on the first working day of each month, covering ad-hoc, subscription, roaming and time-of-use rates. Where a network's published price and its on-device displayed price disagree, the on-device price is used, because that is what the driver pays. This basket produces every pricing and subscription figure on this page.4. The EV Cable Hub Location Audit 2026. A physical audit of 2,140 charging locations, including 612 hub sites, recording bay-to-unit distance, bay dimensions, accessibility features, canopy provision, lighting, amenity provision, cable reach and signage. This audit produces the amenity and site quality figures and the cable reach figures on this page.The scoring rules, in full. A network must operate at least 20 public devices to be scored. Every sub-measure is normalised from 0 to 1 against the best and worst observed values across all scored networks and then weighted. Scores are relative, not absolute, so a network can lose points without getting worse if others improve around it. Price is speed-adjusted: each network is scored against the mean price for its own speed mix rather than against the market mean. Ties break on reliability first and coverage second. Every scored network carries a minimum of 180 verification checks. There is no retrospective restatement: if the method changes, the change is published with the previous method stated alongside and prior editions stand as published. Every scored network is sent its scorecard 14 days before publication and any factual correction is applied; score changes are not negotiable.Limitations. The index measures the network as a service to a driver. It does not measure customer service quality, app design, brand, ownership or investment commitments, all of which matter to some readers and none of which can be measured consistently across 68 operators. Verification checks covered 8,240 of 41,780 UK charging locations, so reliability figures are a weighted sample rather than a full enumeration, and the confidence interval is wider on small networks despite the 180-check minimum. Networks operating at sites they do not control cannot be held responsible for amenity provision, which is why amenities are published but not scored. Scores are relative to the 2026 UK market and are not comparable across editions without reference to the mean, which is published alongside for that reason. Price figures are captured on the first working day of each month, so a network changing price mid-month is captured in the following issue. The six operators below the 20-device threshold are excluded, which slightly raises the mean score. Publishing the limitations is what makes the rest defensible.

Frequently asked questions#

Twenty-seven questions on UK charging networks, each answered with the 2026 figure first.

Every answer below is drawn from the tables on this page, and every one names the edition it comes from so a quoted figure carries its date with it.

Which is the best EV charging network in the UK?

InstaVolt scored highest in 2026 at 84.2 points of 100 in the EV Cable Hub UK Charging Network Index, ahead of Fastned on 82.6 and Tesla Supercharger on 81.9.

How many EV charging networks are there in the UK?

68 operated public devices in 2026, down from 74 a year earlier, the first net decline the index has recorded. A further six operators run fewer than 20 devices and are not scored.

Which is the biggest UK charging network?

ubitricity, with 12,840 public devices in 2026, almost all lamp post units. By installed capacity the largest is InstaVolt at 612 MW on 3,240 devices.

Which UK charging network is most reliable?

Tesla Supercharger, at a 99.1% successful-first-attempt rate across 1,240 verification checks in 2026, ahead of InstaVolt on 98.4% and Fastned on 98.1%. The network mean was 93.1%.

Which is the cheapest UK charging network?

Among networks with over 300 devices in 2026, ubitricity at 45p per kWh, followed by char.gy at 47p and Believ at 48p. All three are predominantly slow on-street networks.

Which is the most expensive UK charging network?

Shell Recharge at 89p per kWh ad-hoc in 2026, followed by BP Pulse at 87p, and InstaVolt, Osprey and EG On The Move at 85p.

Why are some charging networks more expensive?

Mostly because they are faster. Network price and mean device speed correlated at 0.71 in 2026, so the index scores each network against the mean price for its own speed mix rather than against the market as a whole.

Which charging networks accept contactless?

26 UK networks accepted contactless on all their rapid devices in 2026 and 22 accepted it on none. Overall 34,020 devices took contactless, 34.6% of the network, rising to 92.4% at 50kW and above.

Which charging networks require an app?

18 UK networks required an app for every session in 2026, concentrated in the slow on-street segment. 34 networks offered an app-free payment route.

How many charging networks do I need to register with?

3.4 on average to reach 90% coverage of the locations a UK driver is likely to use in 2026. UK drivers held a mean of 3.8 network accounts and had 4.2 charging apps installed.

Do I need my own cable on public chargers?

It depends entirely on the network. Eight UK networks require a driver-supplied cable at every session in 2026 and 18 never require one. Across the network, 42.4% of connectors are untethered.

Which charging networks need me to bring a cable?

In 2026 the lamp post and on-street networks, including ubitricity and char.gy at 100% untethered, and Connected Kerb, Believ and Source London at over 90%. Rapid and ultra-rapid networks never require one.

Which charging network has the best motorway coverage?

BP Pulse operated 84 strategic road network sites in 2026, ahead of GRIDSERVE on 68 and Shell Recharge on 62. GRIDSERVE had the most devices on the network at 946.

Which charging network has the most hubs?

Tesla Supercharger, with 218 hub sites in 2026, ahead of InstaVolt on 186 and BP Pulse on 148. GRIDSERVE ran the highest share of its locations as hubs at 62.5%.

Which charging network is fastest?

By mean device power in 2026, Milence at 371 kW, then IONITY at 329 kW and Fastned at 231 kW. Four networks operated exclusively ultra-rapid devices.

Are charging network uptime claims accurate?

They measure something different. The mean published uptime claim in 2026 was 99.1% against a measured availability of 96.8% and a successful-first-attempt rate of 93.1%. A device that is powered but cannot start a session counts as up on most operator definitions.

Is a charging network subscription worth it?

26 of the 34 UK networks offering one charge no monthly fee in 2026, so registering is free. Of the eight charging a fee, the break-even ranges from 27 kWh a month to 74 kWh a month.

Which network has the best subscription discount?

IONITY, at 40.5% off ad-hoc in 2026, cutting 74p per kWh to 44p for a monthly fee of £8.99, which breaks even at 30 kWh or 111 miles a month.

Which charging networks still offer CHAdeMO?

14 UK networks in 2026, down from 22 two years earlier. There were 9,240 CHAdeMO connectors nationally, down 6.2% year on year.

Which charging network is growing fastest?

Milence at 112.1% in the twelve months to June 2026, then JOLT at 64.2% and Believ at 62.1%. The ten fastest-growing networks accounted for 37.9% of all devices added.

Which charging networks cover the whole UK?

Nine networks operated in all twelve UK regions in 2026: Pod Point, InstaVolt, BP Pulse, Shell Recharge, Osprey, GeniePoint, Connected Kerb, Tesla Supercharger, MFG EV Power and GRIDSERVE.

Which UK region has the fewest charging networks?

Northern Ireland, served by 14 networks in 2026 against 52 in Greater London. ESB Energy held 41.2% of Northern Ireland's devices.

Can I use Tesla Superchargers in a non-Tesla?

Yes, at a subset of UK sites in 2026. Non-Tesla drivers paid 67p per kWh ad-hoc against 52p for Tesla drivers, and 52p on the £10.99 monthly membership.

How is the charging network ranking calculated?

Out of 100 points across five pillars in 2026: coverage 25, reliability 25, price 20, payment access 15, and speed and connectors 15. Every sub-measure and weight is published, and each is normalised against the best and worst observed value across all 68 networks.

Which charging sites have toilets?

1,124 of 1,486 UK charging hubs in 2026, 75.6%, and 1,048 had food and drink. 894 had at least one accessible bay and 268 had a pull-through bay.

Are UK charging networks getting better?

On the index measures, yes. The mean network score rose from 60.8 to 63.4 in 2026, reliability rose 1.7 percentage points to 93.1%, and contactless acceptance rose 46.8%. The mean ad-hoc price rose 4.4%.

How often is this charging network comparison updated?

Twice a year. The EV Cable Hub UK Charging Network Index publishes a flagship edition every January and an interim edition every July, with reliability tracked monthly. The 2026 edition is the fourth, and every previous edition remains available in the archive.

EV Cable Hub Research, 2026 edition. Figures on this page are drawn from the EV Cable Hub UK Charging Network Index 2026, the EV Cable Hub Charge Point Verification Programme 2026 (41,280 checks), the EV Cable Hub Public Charging Tariff Basket 2026 (4,208 tariffs) and the EV Cable Hub Location Audit 2026 (2,140 locations). Tables may be reproduced with attribution to EV Cable Hub. Published twice yearly, with reliability tracked monthly.

Read next