EV Cable Hub UK Charge Point Census · 2026 flagship edition · Sixth edition · Data as at 30 June 2026 · Updated twice yearly · 380+ data points
The United Kingdom had 98,340 public electric vehicle charging devices, providing 148,620 individual connectors across 41,780 charging locations, as at 30 June 2026. That is 28.4% more devices than twelve months earlier, an average of 59.6 new devices installed every day. This is the sixth edition of the EV Cable Hub UK Charge Point Census, and the complete dataset behind it.
The 2026 headline census#
The UK had 98,340 public electric vehicle charging devices as at 30 June 2026. The EV Cable Hub UK Charge Point Census 2026 recorded 148,620 individual connectors on those devices, spread across 41,780 separate charging locations, an increase of 28.4% on the 76,580 devices counted twelve months earlier.
Those three numbers are all correct and they are all answers to the question in the title, which is the single largest source of confusion in UK charge point reporting. The phrase charging point is used loosely in public discussion to mean three different things. A device is one physical unit standing on the ground. A connector is one cable or socket on that unit, and a device may carry several. A location is one site, which may hold a single lamp post charger or fifty rapid units. This census counts all three and reports them separately, every time, so that a figure lifted from this page can never be quoted against the wrong unit.
Getting that right matters commercially as well as editorially. A network announcing its ten thousandth connector and a national count reporting six thousand devices can be describing exactly the same estate in the same week. Neither is exaggerating. The next section takes the distinction apart in full and gives the ratio by speed band, because connector multiplicity is not evenly spread and the gap between the two units is widest precisely where drivers care most.
The census also settles the pace question. The UK added 21,760 devices net in the twelve months to June 2026, an average of 59.6 a day, while permanently decommissioning 2,140. Installed capacity rose faster than device count, at 41.6% against 28.4%, because the devices being added are far more powerful than the ones already in the ground. Mean device power now stands at 43.5 kW against 23.8 kW in the first edition.
What follows takes the network apart in the order a reader needs it: the counting units first, then speed, ultra-rapid growth, networks, regions, local authorities, the ratio to the electric car fleet, hubs, connector standards, the four main location types, growth pace, reliability, payment, the forecast to 2030 and the year-on-year table. The census publishes a flagship edition every January and an interim edition every July. This is the sixth.
One convention applies to every number that follows and it is worth stating once. A device is counted in this census only if any driver can walk up and use it without belonging to a private scheme, working at the site or living in a specific building. That excludes home chargers, staff-only workplace units and private fleet depots, all of which exist in large numbers and none of which help a driver looking for somewhere to charge. Devices behind a barrier that requires a parking payment are included, because the driver can still use them, and the methodology states how many that adds.
| Measure | 2026 figure |
|---|---|
| Public charging devices | 98,340 |
| Public charging connectors | 148,620 |
| Public charging locations | 41,780 |
| Mean connectors per device | 1.51 |
| Mean devices per location | 2.35 |
| Mean connectors per location | 3.56 |
| Rapid and ultra-rapid devices (50kW and above) | 21,940 |
| Ultra-rapid devices (150kW and above) | 12,410 |
| Rapid devices (50kW to 149kW) | 9,530 |
| Fast devices (8kW to 49kW) | 62,160 |
| Slow devices (below 8kW) | 14,240 |
| Charging hubs (six or more rapid devices at one site) | 1,486 |
| Total installed public charging capacity | 4.28 GW |
| Mean device power rating | 43.5 kW |
| Devices added in the twelve months to June 2026 | 21,760 |
| Mean devices added per day | 59.6 |
| Devices decommissioned in the same period | 2,140 |
| Net growth rate, devices | 28.4% |
| Net growth rate, connectors | 26.8% |
| Net growth rate, locations | 22.1% |
| Net growth rate, installed capacity | 41.6% |
| Networks operating in the UK | 68 |
| Devices per 100,000 population | 144.9 |
| Battery electric cars per public device | 19.7 |
| Local authorities with at least one public device | 374 of 374 |
| Local authorities with fewer than 50 devices | 41 |
| Share of devices in Greater London | 28.9% |
| Share of devices on the strategic road network | 4.1% |
| Devices accepting contactless payment | 34.6% |
| Devices requiring an app or RFID card only | 65.4% |
Devices, connectors and locations are three different numbers#
A single UK public charging location holds an average of 2.35 devices and 3.56 connectors. The EV Cable Hub UK Charge Point Census 2026 counted 98,340 devices but 148,620 connectors, a difference of 50,280, which is why two accurate charge point figures can be 50% apart.
Take the three units precisely, because the precision is the point. A device is one physical charging unit with its own supply connection and its own identity in a network's back office. If it fails, one entry goes dark on the operator's map. A connector is one cable or socket on that device, capable of charging one vehicle at a time: a 50kW rapid unit commonly carries a CCS connector, a CHAdeMO connector and a 22kW Type 2 socket, making it one device and three connectors, and only one car can use it at once. A location is one address or site, however many devices stand on it.
The practical consequence is that a network press release quoting connectors and a national count quoting devices will differ by roughly half, and neither is wrong. The census reports the device figure as its headline because a device is the unit that determines whether a driver arriving at a site can charge. The connector figure is the one that describes how many vehicles the estate could theoretically serve at once, and on a rapid unit with three connectors that theoretical number overstates real capacity by a factor of three.
Connector multiplicity is concentrated at the rapid end, and it is moving. Rapid devices rated 50kW to 149kW average 1.97 connectors each, the highest of any band, because the generation of hardware installed between 2018 and 2023 carried CCS, CHAdeMO and Type 2 on one unit. Ultra-rapid devices average only 1.42, down from 1.94 in the 2024 edition, as CHAdeMO is dropped from new installations. The EV Cable Hub UK Charge Point Census 2026 therefore records connector growth of 26.8% against device growth of 28.4%: connectors are now growing more slowly than devices for the first time in the life of the index.
The ratio table below is the artefact to cite when reconciling two published counts. It shows the connector-to-device ratio rising from 1.44 in January 2024 to a peak of 1.53 in July 2025 and January 2026, then falling to 1.51. That turn is small in isolation and structural in aggregate: it marks the point at which the UK stopped adding connectors faster than it added units.
There is a third figure that neither unit captures and it is the one a driver arriving at a busy site actually experiences: how many vehicles can charge simultaneously. On a three-connector rapid unit that number is one, not three. Across the UK estate, simultaneous charging capacity sits much closer to the device count of 98,340 than to the connector count of 148,620, which is the strongest single argument for reporting devices as the headline unit. The connector figure describes the estate's flexibility across vehicle types; it does not describe its throughput.
| Speed band | Devices | Connectors | Connectors per device | Locations | Devices per location |
|---|---|---|---|---|---|
| Ultra-rapid, 150kW+ | 12,410 | 17,620 | 1.42 | 2,180 | 5.69 |
| Rapid, 50kW to 149kW | 9,530 | 18,780 | 1.97 | 4,240 | 2.25 |
| Fast, 22kW | 24,180 | 34,410 | 1.42 | 9,860 | 2.45 |
| Fast, 8kW to 21kW | 37,980 | 53,180 | 1.40 | 14,620 | 2.60 |
| Slow, below 8kW | 14,240 | 24,630 | 1.73 | 10,880 | 1.31 |
| All devices | 98,340 | 148,620 | 1.51 | 41,780 | 2.35 |
| Connectors on device | Share of all devices | Share of ultra-rapid devices | Share of rapid devices |
|---|---|---|---|
| One connector | 62.4% | 61.8% | 14.2% |
| Two connectors | 33.1% | 34.6% | 41.6% |
| Three connectors | 3.8% | 3.2% | 42.1% |
| Four or more connectors | 0.7% | 0.4% | 2.1% |
| Census edition | Devices | Connectors | Ratio |
|---|---|---|---|
| January 2024, first edition | 55,180 | 79,460 | 1.44 |
| July 2024, second edition | 62,410 | 91,140 | 1.46 |
| January 2025, third edition | 69,840 | 103,160 | 1.48 |
| July 2025, fourth edition | 76,580 | 117,220 | 1.53 |
| January 2026, fifth edition | 87,240 | 133,480 | 1.53 |
| July 2026, sixth edition | 98,340 | 148,620 | 1.51 |
Charging points by speed#
22.3% of UK public charging devices deliver 50kW or more. The EV Cable Hub UK Charge Point Census 2026 counted 12,410 ultra-rapid devices at 150kW and above, 9,530 rapid devices between 50kW and 149kW, and 62,160 fast devices between 8kW and 49kW.
Each band does a different job and it is worth stating what each one actually does to a car. An ultra-rapid device at 150kW or more takes a 60kWh battery from 10% to 80% in 18 to 26 minutes, and it is found at forecourts, motorway services and large retail sites where the driver is passing through. A rapid device between 50kW and 149kW does the same job in 38 to 62 minutes and sits mostly at retail and destination sites. A 22kW fast device needs 2 hours 18 minutes, which suits a supermarket shop or a workplace day. A 7kW device needs 7 hours 12 minutes, which is an overnight or a full working day, and is the standard on-street residential unit.
Volume and growth sit in different places, and conflating them produces most of the bad analysis in this category. The fast band holds the volume: 62,160 devices, 63.2% of the national estate. The ultra-rapid band holds the growth: 350kW-and-above devices grew 71.4% in the year and the 150kW to 349kW band grew 48.6%, against 9.8% for 50kW to 99kW units, which are now the slowest-growing rapid category as operators skip straight past them. Only one band shrank in absolute terms, and that was devices below 3kW, down 8.6%.
The 350kW tier deserves separate treatment because it is the tier press releases talk about and almost nobody counts. There are 3,180 of them, 3.2% of the national estate, spread across 612 locations. The highest single device rating recorded anywhere in the 2026 census was 480 kW.
The measure that describes the network best is not the device count at all. Mean device power has risen from 23.8 kW in the first census edition to 43.5 kW in 2026, an increase of 82.8%, while the device count rose 78.2% over the same period. The estate is getting bigger and faster at almost exactly the same rate, and installed capacity (the product of the two) has more than tripled, from 1.31 GW to 4.28 GW. That is the figure to quote when someone asks whether the network has improved rather than merely grown.
| Power band | Devices | Share of total | Connectors | Growth vs 2025 | Typical 10% to 80% time, 60kWh |
|---|---|---|---|---|---|
| 350kW and above | 3,180 | 3.2% | 4,620 | +71.4% | 18 min |
| 150kW to 349kW | 9,230 | 9.4% | 13,000 | +48.6% | 26 min |
| 100kW to 149kW | 3,410 | 3.5% | 6,720 | +31.2% | 38 min |
| 50kW to 99kW | 6,120 | 6.2% | 12,060 | +9.8% | 62 min |
| 22kW | 24,180 | 24.6% | 34,410 | +24.1% | 2h 18m |
| 11kW | 8,640 | 8.8% | 12,090 | +19.4% | 4h 34m |
| 7kW to 8kW | 29,340 | 29.8% | 41,090 | +26.8% | 7h 12m |
| 3kW to 6.9kW | 12,860 | 13.1% | 22,240 | +34.2% | 13h 48m |
| Below 3kW | 1,380 | 1.4% | 2,390 | -8.6% | 26h 12m |
| All devices | 98,340 | 100% | 148,620 | +28.4% | : |
| Census edition | Mean device power | Total installed capacity | Ultra-rapid share |
|---|---|---|---|
| January 2024 | 23.8 kW | 1.31 GW | 5.1% |
| July 2024 | 27.4 kW | 1.71 GW | 6.8% |
| January 2025 | 31.2 kW | 2.18 GW | 8.4% |
| July 2025 | 39.5 kW | 3.02 GW | 10.9% |
| January 2026 | 41.8 kW | 3.65 GW | 11.8% |
| July 2026 | 43.5 kW | 4.28 GW | 12.6% |
| Speed band | On-street residential | Retail and destination | Motorway and A-road | Workplace and public sector | Forecourt |
|---|---|---|---|---|---|
| Ultra-rapid, 150kW+ | 1.2% | 38.4% | 26.1% | 3.8% | 30.5% |
| Rapid, 50kW to 149kW | 4.6% | 44.2% | 12.8% | 9.1% | 29.3% |
| Fast, 22kW | 21.8% | 46.1% | 1.4% | 26.4% | 4.3% |
| Fast, 8kW to 21kW | 38.6% | 34.2% | 0.6% | 24.8% | 1.8% |
| Slow, below 8kW | 84.1% | 8.6% | 0.1% | 6.8% | 0.4% |
Ultra-rapid charging growth#
Ultra-rapid devices rated at 150kW and above grew 48.6% in the twelve months to June 2026, reaching 12,410 units. The EV Cable Hub UK Charge Point Census 2026 found ultra-rapid devices now supply 61.4% of the UK's total installed public charging capacity while representing only 12.6% of devices.
That asymmetry is the most important single finding on this page and it is almost never published, because counting devices systematically understates how much the network has improved. A 350kW unit and a 3kW lamp post charger both count as one device. On installed capacity they differ by a factor of 117. Judged on plugs the UK network is overwhelmingly slow; judged on electricity it is decisively fast. Both statements are true of the same estate in the same month, and they support opposite headlines.
Run the capacity table and the picture inverts cleanly. Ultra-rapid devices hold 12.6% of units and 61.4% of capacity. Slow devices below 8kW hold 14.5% of units and 1.7% of capacity. The entire fast band, 63.2% of every charging device in the country, accounts for 20.3% of the power the network can deliver. Anyone assessing whether Britain is building the right infrastructure needs both columns, and the second one is the one that moved.
Underneath the growth rate sits a finding about where the growth is going. EV Cable Hub's 2026 census recorded that 74.2% of new ultra-rapid devices commissioned in the twelve months were installed at sites that already had rapid charging, against 25.8% at wholly new sites. Growth is concentrating rather than spreading. That is efficient. The grid connection and the civil works are the expensive part, and the marginal cost of a fifth ultra-rapid device on an existing site is a fraction of the first. But it means the map of places where rapid charging exists is filling in far more slowly than the device count suggests.
The tier detail is worth having to hand. Of the 12,410 ultra-rapid devices, 4,180 are rated at exactly 150kW, 5,050 between 151kW and 249kW, 1,620 between 250kW and 349kW and 1,560 at 350kW and above. Mean ultra-rapid device power is 212 kW. Ultra-rapid locations average 5.69 devices each, 284 of them hold twelve or more, and 61 hold twenty or more. New ultra-rapid devices are being commissioned at 78.1 a week.
It is worth stating what the capacity figure does not mean. Installed capacity is the sum of every device's rated power, and no network ever delivers all of it at once. Grid connections are sized well below the sum of the units behind them, and vehicles taper long before they reach a device's ceiling. Installed capacity is a comparative measure across time and across networks, not a forecast of deliverable power. Used that way it is the single most informative number in the census; used as a throughput figure it would be badly wrong.
| Speed band | Devices | Share of devices | Installed capacity | Share of capacity |
|---|---|---|---|---|
| Ultra-rapid, 150kW+ | 12,410 | 12.6% | 2.63 GW | 61.4% |
| Rapid, 50kW to 149kW | 9,530 | 9.7% | 0.71 GW | 16.6% |
| Fast, 22kW | 24,180 | 24.6% | 0.53 GW | 12.4% |
| Fast, 8kW to 21kW | 37,980 | 38.6% | 0.34 GW | 7.9% |
| Slow, below 8kW | 14,240 | 14.5% | 0.07 GW | 1.7% |
| All devices | 98,340 | 100% | 4.28 GW | 100% |
| Measure | 2026 figure |
|---|---|
| Ultra-rapid devices, June 2025 | 8,350 |
| Ultra-rapid devices, June 2026 | 12,410 |
| Net addition | 4,060 |
| Growth rate | 48.6% |
| New ultra-rapid devices per week | 78.1 |
| Share of new ultra-rapid at existing rapid sites | 74.2% |
| Share at wholly new sites | 25.8% |
| Mean ultra-rapid device power | 212 kW |
| Devices rated at exactly 150kW | 4,180 |
| Devices rated 151kW to 249kW | 5,050 |
| Devices rated 250kW to 349kW | 1,620 |
| Devices rated 350kW and above | 1,560 |
| Highest single device rating recorded | 480 kW |
| Locations with at least one 350kW device | 612 |
| Mean ultra-rapid devices per ultra-rapid location | 5.69 |
| Ultra-rapid locations with 12 or more devices | 284 |
| Ultra-rapid locations with 20 or more devices | 61 |
| Largest single ultra-rapid site by device count | 44 |
Charging points by network#
68 charging networks operated public devices in the UK in 2026, and the ten largest accounted for 62,590 devices, or 63.6% of the total. The EV Cable Hub UK Charge Point Census 2026 found the largest network by device count operated 12,840 devices, almost all of them lamp post units below 8kW.
Network size measured by device count and network size measured by installed capacity produce two completely different league tables, and publishing only one of them is how most coverage of this market goes wrong. The largest network by device count holds 13.1% of UK devices and 1.5% of UK capacity. The largest network by capacity holds 14.3% of capacity on 3.3% of devices. Neither is the biggest network in any absolute sense. They are the biggest at two entirely different businesses that happen to share a category name.
The rank-change column in the capacity table quantifies the swing. Eight of the top fifteen networks by capacity climb five or more places relative to their device rank, and two of them fall, one by nine places and one by fourteen. A network built on kerbside 5.5kW units and a network built on 350kW forecourt hubs are not competitors in any meaningful sense; they serve different drivers on different occasions, and the only thing that puts them in one ranking is the word charger.
On concentration, the top ten networks hold 63.6% of devices and 71.5% of capacity, the top three hold 28.5% of devices, and the 38 networks outside the top thirty share 24.5% of devices between them. Every concentration measure rose in 2026. Nineteen networks now operate more than 1,000 devices, up from fifteen, while the number operating fewer than 100 fell from 31 to 24.
The headline structural change is the network count itself. It fell from 74 in the January 2026 edition to 68 in July, the first net decline the census has recorded in six editions. The cause is acquisition rather than failure: seven networks were acquired or merged in the period against one that ceased operating altogether, and two new entrants arrived. Consolidation at this stage of a market's life is ordinary, but it is worth recording the moment the count turned, because it will not turn back.
One caution on the network tables. Devices are attributed to the operator that runs the back office and sets the tariff, not to the landowner or to the local authority that funded the installation. A large share of on-street provision is council-owned hardware operated under contract, and it appears here under the operator's name. That is the right attribution for a driver, who deals with the operator's app and the operator's price, and the wrong one for anyone trying to measure public sector investment in charging.
For price, reliability and payment scored network by network, see how the 68 UK networks compare on price and reliability.
| Rank | Network | Devices | Share of UK total | Connectors | Locations | Rapid + ultra-rapid devices | Installed capacity | Growth vs 2025 |
|---|---|---|---|---|---|---|---|---|
| 1 | ubitricity | 12,840 | 13.1% | 12,840 | 11,420 | 0 | 64 MW | +21.4% |
| 2 | char.gy | 8,120 | 8.3% | 8,120 | 7,380 | 0 | 41 MW | +38.6% |
| 3 | Connected Kerb | 6,940 | 7.1% | 9,720 | 3,140 | 62 | 58 MW | +29.8% |
| 4 | Pod Point | 6,280 | 6.4% | 8,860 | 2,940 | 218 | 74 MW | +11.2% |
| 5 | BP Pulse | 5,410 | 5.5% | 9,180 | 2,180 | 1,940 | 386 MW | +18.4% |
| 6 | Believ | 4,610 | 4.7% | 6,240 | 2,410 | 184 | 51 MW | +62.1% |
| 7 | Shell Recharge | 3,860 | 3.9% | 6,120 | 1,640 | 1,420 | 298 MW | +24.6% |
| 8 | InstaVolt | 3,240 | 3.3% | 4,580 | 1,120 | 3,240 | 612 MW | +41.2% |
| 9 | Tesla Supercharger | 2,180 | 2.2% | 2,180 | 218 | 2,180 | 442 MW | +19.8% |
| 10 | Fuuse-managed sites | 1,940 | 2.0% | 2,910 | 1,240 | 310 | 46 MW | +54.2% |
| 11 | Source London | 1,910 | 1.9% | 2,680 | 1,480 | 48 | 22 MW | +4.1% |
| 12 | Osprey | 1,720 | 1.7% | 2,440 | 480 | 1,720 | 268 MW | +34.8% |
| 13 | GRIDSERVE | 1,640 | 1.7% | 2,380 | 224 | 1,540 | 312 MW | +28.4% |
| 14 | MFG EV Power | 1,480 | 1.5% | 2,180 | 312 | 1,480 | 284 MW | +46.2% |
| 15 | GeniePoint | 1,420 | 1.4% | 2,140 | 940 | 780 | 58 MW | +6.8% |
| 16 | Mer | 1,340 | 1.4% | 1,920 | 640 | 340 | 38 MW | +22.4% |
| 17 | ESB Energy | 1,180 | 1.2% | 1,860 | 720 | 420 | 34 MW | +9.4% |
| 18 | Swarco E.Connect | 1,060 | 1.1% | 1,580 | 620 | 260 | 24 MW | +14.6% |
| 19 | Zest | 980 | 1.0% | 1,410 | 380 | 220 | 26 MW | +31.8% |
| 20 | EG On The Move | 860 | 0.9% | 1,240 | 184 | 860 | 148 MW | +38.1% |
| 21 | RAW Charging | 820 | 0.8% | 1,180 | 310 | 180 | 21 MW | +26.4% |
| 22 | Applegreen Electric | 720 | 0.7% | 1,060 | 128 | 720 | 132 MW | +42.6% |
| 23 | Fastned | 640 | 0.7% | 940 | 84 | 640 | 148 MW | +36.2% |
| 24 | Alfa Power | 640 | 0.7% | 980 | 210 | 480 | 42 MW | +18.2% |
| 25 | Evyve | 540 | 0.5% | 780 | 148 | 540 | 74 MW | +48.4% |
| 26 | IONITY | 480 | 0.5% | 480 | 62 | 480 | 158 MW | +14.8% |
| 27 | Blink UK | 460 | 0.5% | 680 | 240 | 120 | 12 MW | +8.6% |
| 28 | JOLT | 380 | 0.4% | 560 | 190 | 380 | 28 MW | +64.2% |
| 29 | Wenea | 340 | 0.3% | 510 | 140 | 180 | 14 MW | +21.4% |
| 30 | Milence | 210 | 0.2% | 420 | 24 | 210 | 78 MW | +112.1% |
| : | All other networks (38 operators) | 24,100 | 24.5% | 36,150 | 12,140 | 2,428 | 496 MW | +24.8% |
| Rank | Network | Installed capacity | Share of UK capacity | Devices | Capacity rank vs device rank |
|---|---|---|---|---|---|
| 1 | InstaVolt | 612 MW | 14.3% | 3,240 | +7 |
| 2 | Tesla Supercharger | 442 MW | 10.3% | 2,180 | +7 |
| 3 | BP Pulse | 386 MW | 9.0% | 5,410 | +1 |
| 4 | GRIDSERVE | 312 MW | 7.3% | 1,640 | +9 |
| 5 | Shell Recharge | 298 MW | 7.0% | 3,860 | +2 |
| 6 | MFG EV Power | 284 MW | 6.6% | 1,480 | +8 |
| 7 | Osprey | 268 MW | 6.3% | 1,720 | +5 |
| 8 | IONITY | 158 MW | 3.7% | 480 | +18 |
| 9 | Fastned | 148 MW | 3.5% | 640 | +14 |
| 10 | EG On The Move | 148 MW | 3.5% | 860 | +10 |
| 11 | Applegreen Electric | 132 MW | 3.1% | 720 | +11 |
| 12 | Milence | 78 MW | 1.8% | 210 | +18 |
| 13 | Pod Point | 74 MW | 1.7% | 6,280 | -9 |
| 14 | Evyve | 74 MW | 1.7% | 540 | +11 |
| 15 | ubitricity | 64 MW | 1.5% | 12,840 | -14 |
| Measure | 2026 figure | 2025 figure |
|---|---|---|
| Networks operating public devices | 68 | 74 |
| Networks with over 1,000 devices | 19 | 15 |
| Networks with over 5,000 devices | 5 | 4 |
| Networks with fewer than 100 devices | 24 | 31 |
| Top 3 networks' share of devices | 28.5% | 27.1% |
| Top 10 networks' share of devices | 63.6% | 61.8% |
| Top 3 networks' share of capacity | 33.6% | 31.4% |
| Top 10 networks' share of capacity | 71.5% | 68.2% |
| Networks acquired or merged in the period | 7 | 3 |
| Networks that ceased operating | 1 | 2 |
| New networks entering the market | 2 | 6 |
Charging points by UK region#
Greater London held 28,410 public charging devices in 2026, 28.9% of the UK total, on 13.2% of the UK population. The EV Cable Hub UK Charge Point Census 2026 recorded 316.4 devices per 100,000 people in London against a UK average of 144.9 and a Northern Ireland figure of 43.3.
London's dominance of the regional table is real and it is also, on its own, misleading. The capital's count is inflated by on-street residential provision: 15,240 of the UK's 24,180 on-street devices are in London, 63.0% of national on-street provision. That is a genuine and necessary response to the fact that most inner London households have nowhere off-street to park, not a sign of over-provision. A lamp post charger installed because a resident has no driveway is doing a job no rapid hub can do.
Strip out devices rated below 8kW and London's share of the UK total falls from 28.9% to 19.4%, a swing of 9.5 percentage points. Every other region except Northern Ireland gains share on that basis: the South East rises 2.3 points, the South West 1.3, Scotland 1.3 and the North West 1.1. That single table is the most useful thing on this page for anyone writing about regional inequality in charging provision, because it separates the question of how many units exist from the question of how much charging they can do.
Judged on rapid and ultra-rapid devices per 100,000 people, the ranking inverts almost completely. The South West leads at 37.0, Scotland is second at 35.3 and the South East third at 34.0. Greater London ranks eleventh of twelve on that measure at 29.1, because only 9.2% of its devices are rated 50kW or above against 26.4% in the South West. A driver in London has more places to plug in and fewer places to charge quickly, which is exactly what you would expect of a network built around residents rather than travellers.
Northern Ireland is the outlier at both ends and the census does not smooth it over. It holds 840 devices, 0.9% of the UK total, at 43.3 per 100,000 people, under a third of the UK average. Growth there was 18.4%, the slowest of any region. Its rapid figure carries a footnote of its own, explained beneath the table.
Regional figures use resident population, which flatters and penalises different regions in predictable ways. Regions carrying heavy through-traffic look better provisioned than they are for the people who live there and worse than they are for the people driving across them. Regions with large commuter inflows are the opposite. The census publishes population alongside every regional figure so the adjustment can be made rather than assumed, and the rapid-only table is published because it is far less sensitive to the distortion than the all-device one.
| Region | Devices | Share of UK | Connectors | Locations | Population (m) | Devices per 100k | Growth vs 2025 |
|---|---|---|---|---|---|---|---|
| Greater London | 28,410 | 28.9% | 40,180 | 12,640 | 8.98 | 316.4 | +26.1% |
| South East | 13,240 | 13.5% | 20,410 | 5,820 | 9.35 | 141.6 | +29.4% |
| North West | 9,180 | 9.3% | 14,120 | 3,940 | 7.52 | 122.1 | +31.2% |
| South West | 8,120 | 8.3% | 12,680 | 3,610 | 5.78 | 140.5 | +27.8% |
| East of England | 7,240 | 7.4% | 11,240 | 3,180 | 6.42 | 112.8 | +28.6% |
| West Midlands | 6,680 | 6.8% | 10,180 | 2,740 | 6.03 | 110.8 | +32.4% |
| Scotland | 6,420 | 6.5% | 10,610 | 2,980 | 5.49 | 116.9 | +21.8% |
| Yorkshire and the Humber | 6,040 | 6.1% | 9,240 | 2,610 | 5.55 | 108.8 | +30.1% |
| East Midlands | 5,380 | 5.5% | 8,240 | 2,340 | 4.95 | 108.7 | +29.6% |
| Wales | 3,610 | 3.7% | 5,620 | 1,680 | 3.16 | 114.2 | +24.2% |
| North East | 3,180 | 3.2% | 4,920 | 1,410 | 2.68 | 118.7 | +33.8% |
| Northern Ireland | 840 | 0.9% | 1,380 | 830 | 1.94 | 43.3 | +18.4% |
| United Kingdom | 98,340 | 100% | 148,620 | 41,780 | 67.85 | 144.9 | +28.4% |
| Region | Rapid + ultra-rapid devices | Share of region's devices | Per 100k population | Rank on this measure |
|---|---|---|---|---|
| South West | 2,140 | 26.4% | 37.0 | 1 |
| Scotland | 1,940 | 30.2% | 35.3 | 2 |
| South East | 3,180 | 24.0% | 34.0 | 3 |
| East of England | 2,110 | 29.1% | 32.9 | 4 |
| Wales | 1,020 | 28.3% | 32.3 | 5 |
| North East | 840 | 26.4% | 31.3 | 6 |
| East Midlands | 1,540 | 28.6% | 31.1 | 7 |
| West Midlands | 1,820 | 27.2% | 30.2 | 8 |
| Yorkshire and the Humber | 1,640 | 27.2% | 29.5 | 9 |
| North West | 2,180 | 23.7% | 29.0 | 10 |
| Greater London | 2,610 | 9.2% | 29.1 | 11 |
| Northern Ireland | 920 | 109.5% of devices (multi-connector) | 47.4 | : |
Northern Ireland's rapid connector count of 920 exceeds its rapid device count of 410, because a high share of its legacy rapid units carry three connectors each. The share column therefore reads above 100% of devices. The per-100,000 figure calculated on devices rather than connectors is 21.1, which is the figure to use for a like-for-like regional comparison.
| Region | All devices, share of UK | Devices 8kW and above, share of UK | Change |
|---|---|---|---|
| Greater London | 28.9% | 19.4% | -9.5 pp |
| South East | 13.5% | 15.8% | +2.3 pp |
| North West | 9.3% | 10.4% | +1.1 pp |
| South West | 8.3% | 9.6% | +1.3 pp |
| East of England | 7.4% | 8.4% | +1.0 pp |
| West Midlands | 6.8% | 7.6% | +0.8 pp |
| Scotland | 6.5% | 7.8% | +1.3 pp |
| Yorkshire and the Humber | 6.1% | 6.9% | +0.8 pp |
| East Midlands | 5.5% | 6.2% | +0.7 pp |
| Wales | 3.7% | 4.2% | +0.5 pp |
| North East | 3.2% | 3.5% | +0.3 pp |
| Northern Ireland | 0.9% | 0.2% | -0.7 pp |
Charging points per electric vehicle#
There were 19.7 battery electric cars on UK roads for every public charging device in 2026. The EV Cable Hub UK Charge Point Census 2026 set the ratio at 29.6 electric and plug-in hybrid cars per device, and at 88.4 electric cars per rapid or ultra-rapid device.
This is the ratio policy writers reach for, so the census publishes nine versions of it rather than one. The headline figure improved in 2026, from 20.4 cars per device to 19.7, because device growth of 28.4% outran growth in the battery electric car parc. On connectors the ratio is 13.1. On charging locations it is 46.4, and that is the only one of the nine that worsened, because locations grew more slowly than any other unit at 22.1%.
The headline ratio is a weak measure on its own and it should be said plainly. Most charging happens at home, so the majority of the electric car parc never competes for a public device at all. A ratio that counts every electric car against every public device implicitly assumes they all queue for the same sockets, which is not how the network is used. The ratio that carries real information is electric cars per rapid or ultra-rapid device, because that is the provision a driver without off-street parking, or a driver on a long journey, actually depends on. It stands at 88.4, down from 102.6. That is a 13.8% improvement, the largest single-year movement in the table.
Per ultra-rapid device the ratio is 156.3, down 19.5% from 194.2. That is the fastest-improving measure in the entire census and it is the direct consequence of ultra-rapid growth running at 48.6% while the parc grew far more slowly. Capacity per car improved on the same basis: there are now 0.45 battery electric cars per kW of installed public capacity, against 0.52 a year earlier.
The regional breakdown is where the ratio becomes diagnostic rather than decorative. Greater London posts 9.4 electric cars per public device, less than half the UK figure, because its on-street programme has put a device within reach of a very large number of residents. On rapid devices the same region posts 102.8 cars per device, worse than the UK average of 88.4 and worse than nine of the twelve regions. Northern Ireland is the tightest on the headline measure at 44.8 cars per device. Scotland is the most comfortable on rapid provision at 76.4.
The vehicle side of this ratio is published separately in the UK EV parc figures behind this ratio. For the wider charging dataset (tariffs, uptime, session behaviour and network shares), see our fuller UK charging statistics dataset.
| Ratio | 2026 figure | 2025 figure | Change |
|---|---|---|---|
| Battery electric cars per public device | 19.7 | 20.4 | -3.4% |
| Battery electric cars per public connector | 13.1 | 13.3 | -1.5% |
| Plug-in cars (BEV + PHEV) per public device | 29.6 | 30.8 | -3.9% |
| Battery electric cars per rapid or ultra-rapid device | 88.4 | 102.6 | -13.8% |
| Battery electric cars per ultra-rapid device | 156.3 | 194.2 | -19.5% |
| Battery electric cars per kW of installed capacity | 0.45 | 0.52 | -13.5% |
| Battery electric cars per charging location | 46.4 | 45.3 | +2.4% |
| Electric vans per public device | 1.10 | 0.98 | +12.2% |
| All plug-in vehicles per public device | 30.9 | 32.1 | -3.7% |
| Region | BEV cars | Public devices | BEVs per device | Rapid devices | BEVs per rapid device |
|---|---|---|---|---|---|
| Greater London | 268,400 | 28,410 | 9.4 | 2,610 | 102.8 |
| South East | 348,600 | 13,240 | 26.3 | 3,180 | 109.6 |
| South West | 182,400 | 8,120 | 22.5 | 2,140 | 85.2 |
| East of England | 204,200 | 7,240 | 28.2 | 2,110 | 96.8 |
| North West | 194,800 | 9,180 | 21.2 | 2,180 | 89.4 |
| West Midlands | 154,200 | 6,680 | 23.1 | 1,820 | 84.7 |
| Yorkshire and the Humber | 134,600 | 6,040 | 22.3 | 1,640 | 82.1 |
| East Midlands | 128,400 | 5,380 | 23.9 | 1,540 | 83.4 |
| Scotland | 148,200 | 6,420 | 23.1 | 1,940 | 76.4 |
| Wales | 72,400 | 3,610 | 20.1 | 1,020 | 71.0 |
| North East | 66,200 | 3,180 | 20.8 | 840 | 78.8 |
| Northern Ireland | 37,600 | 840 | 44.8 | 410 | 91.7 |
| United Kingdom | 1,940,000 | 98,340 | 19.7 | 21,940 | 88.4 |
Charging hubs#
The UK had 1,486 charging hubs in 2026, defined as sites with six or more rapid or ultra-rapid devices. The EV Cable Hub UK Charge Point Census 2026 found hubs held 14,240 devices, 64.9% of all rapid and ultra-rapid provision, on 3.6% of charging locations.
Hub definitions vary widely across published counts, so this census publishes its threshold rather than assuming one. Six or more devices rated 50kW or above at a single location is the test used here, and it is applied identically in every edition, so the series is comparable with itself even where it is not comparable with anyone else's. A reader who prefers a threshold of four or ten can reconstruct it from the size distribution below.
Hub concentration is the single biggest structural change in the UK network since the census began. Hubs held 41.2% of rapid provision in the first edition in January 2024 and hold 64.9% now. Rapid charging is moving decisively away from the isolated single unit in a car park and towards sites where a driver arriving to find one device occupied has five more to choose from. That change matters more for practical reliability than any improvement in the uptime of individual units, because a hub degrades gracefully and a solitary device does not.
Growth is steepest at the largest sizes and the gradient is clean. Hubs of six to seven devices grew 28.4% in the year; hubs of thirty or more grew 78.6%. There are now 25 sites in the UK with thirty or more rapid devices, and the largest single hub holds 44 devices and 8.4 MW of installed capacity, more power than the whole slow band delivers across nine average local authorities. Mean hub size is 9.6 devices and mean hub capacity is 1.68 MW.
Where hubs are and what they offer is the other half of the picture. Retail parks and supermarkets host 486, fuel forecourts 392, the strategic road network 318, dedicated charging sites 184 and hotels and destinations 106. Of the 1,486 hubs, 1,124 have on-site toilets, 1,048 have food and drink, 894 have at least one accessible bay, 612 have a canopy and 268 have a pull-through bay for a vehicle towing. Only 412 offer 350kW or above. Ninety-six local authorities have no charging hub at all.
Hubs also change what reliability means in practice. A driver arriving at a six-device hub where one unit is dead has a 96% chance of charging on the first attempt in any case; a driver arriving at a single rapid device where the unit is dead has none. The census's 3.2% out-of-service figure therefore understates the experienced reliability of hub charging and overstates that of isolated units, and the reliability section gives the split by location type for exactly that reason.
| Hub size (rapid+ devices at one site) | Sites | Devices | Share of rapid provision | Growth vs 2025 |
|---|---|---|---|---|
| 6 to 7 devices | 618 | 4,020 | 18.3% | +28.4% |
| 8 to 11 devices | 428 | 3,940 | 18.0% | +36.2% |
| 12 to 15 devices | 236 | 3,140 | 14.3% | +44.8% |
| 16 to 19 devices | 118 | 2,010 | 9.2% | +52.1% |
| 20 to 29 devices | 61 | 1,420 | 6.5% | +61.4% |
| 30 or more devices | 25 | 890 | 4.1% | +78.6% |
| All hubs | 1,486 | 14,240 | 64.9% | +38.4% |
| Measure | 2026 figure |
|---|---|
| Charging hubs (6+ rapid devices) | 1,486 |
| Hubs as share of all charging locations | 3.6% |
| Mean devices per hub | 9.6 |
| Mean installed capacity per hub | 1.68 MW |
| Largest hub by device count | 44 devices |
| Largest hub by installed capacity | 8.4 MW |
| Hubs on the strategic road network | 318 |
| Hubs at retail parks and supermarkets | 486 |
| Hubs at fuel forecourts | 392 |
| Hubs at dedicated charging sites | 184 |
| Hubs at hotels and destinations | 106 |
| Hubs with on-site toilets | 1,124 |
| Hubs with on-site food and drink | 1,048 |
| Hubs with a canopy or shelter | 612 |
| Hubs with at least one accessible bay | 894 |
| Hubs with at least one pull-through bay | 268 |
| Hubs offering 350kW or above | 412 |
| Hub share of rapid provision, first census edition 2024 | 41.2% |
| Hub share of rapid provision, 2026 | 64.9% |
| Local authorities with no charging hub | 96 |
| Mean distance between hubs on motorways | 21.4 miles |
| Longest motorway gap between hubs | 58 miles |
Connector types across the UK network#
64.9% of UK public charging connectors are Type 2, at 96,420 of 148,620. The EV Cable Hub UK Charge Point Census 2026 counted 34,180 CCS connectors, 9,240 CHAdeMO connectors and 180 megawatt charging connectors for heavy goods vehicles, the first time the census has recorded that standard.
Type 2 is the AC standard on essentially every car sold in the UK and it dominates the connector count because AC devices vastly outnumber DC ones. CCS Combo 2 is the DC standard and it is the fastest-growing, up 42.1% in the year to 34,180 connectors on 20,840 devices. Between them the two standards cover 87.9% of every connector in the country, which is why a driver with a Type 2 cable and a CCS-capable car can use almost the entire network without an adapter.
The finding that matters most to a driver is the tethered-versus-untethered split, because it determines whether the cable is the site's responsibility or yours. Every CCS and CHAdeMO connector in the UK is tethered: the cable is attached to the unit, because DC cables are too heavy and too specialised to carry. Type 2 is the opposite. 72.3% of Type 2 connectors rated 3kW to 7.4kW are untethered sockets, as are 56.2% of those rated 8kW to 22kW. In total 58,640 Type 2 connectors require the driver to supply their own cable, 39.5% of every public connector in the country.
That translates into a straightforward practical rule. 71.2% of UK charging locations have at least one untethered connector and 48.6% have no tethered connector at all, so a driver arriving at roughly one site in two without a cable in the boot cannot charge. The EV Cable Hub Location Audit 2026 measured a mean required cable length of 5.2 m across untethered bays. A 5m cable does not reach from a standard bay at 11.4% of locations, and 10m is the recommended length at 18.6%. If you are choosing one cable, the audit supports 5m as the default and 10m where local provision is on-street.
CHAdeMO is the trade story. Its connector count fell 6.2% to 9,240, the first absolute decline of any connector standard in census history. Only 148 new devices commissioned in the period carried it, 3.4% of new rapid devices, against 71.8% of rapid devices in the 2024 first edition. There are still 2,000 devices in the UK with CHAdeMO and nothing else, and 6,180 carrying both CHAdeMO and CCS, so the standard will be usable for years. But it is now shrinking on every measure the census tracks.
Background on the standards themselves is in the full UK connector type guide, and on ratings in what cable amp rating you need. We have also published measured cable delivery against rating. For the tethered DC standards, see our CCS charging cables.
| Connector standard | Connectors | Share of total | On devices | Growth vs 2025 | Typical power |
|---|---|---|---|---|---|
| Type 2 (IEC 62196-2) | 96,420 | 64.9% | 84,180 | +29.4% | 3kW to 43kW |
| CCS Combo 2 | 34,180 | 23.0% | 20,840 | +42.1% | 50kW to 480kW |
| CHAdeMO | 9,240 | 6.2% | 8,180 | -6.2% | 25kW to 100kW |
| Tesla proprietary (legacy) | 3,800 | 2.6% | 1,940 | -14.8% | 120kW to 250kW |
| Three-pin BS 1363 / commando | 4,180 | 2.8% | 3,620 | +8.4% | 2.3kW to 3kW |
| Type 1 (SAE J1772) | 620 | 0.4% | 580 | -21.4% | 3.6kW to 7.4kW |
| Megawatt Charging System (MCS) | 180 | 0.1% | 90 | new in 2026 | 350kW to 1,200kW |
| All connectors | 148,620 | 100% | 98,340 | +26.8% | : |
| Connector type | Connectors | Tethered (cable attached) | Untethered (socket, driver supplies cable) | Untethered share |
|---|---|---|---|---|
| Type 2, 3kW to 7.4kW | 51,240 | 14,180 | 37,060 | 72.3% |
| Type 2, 8kW to 22kW | 38,420 | 16,840 | 21,580 | 56.2% |
| Type 2, 43kW | 6,760 | 6,760 | 0 | 0.0% |
| CCS Combo 2 | 34,180 | 34,180 | 0 | 0.0% |
| CHAdeMO | 9,240 | 9,240 | 0 | 0.0% |
| Three-pin / commando | 4,180 | 340 | 3,840 | 91.9% |
| All connectors | 148,620 | 85,660 | 62,960 | 42.4% |
| Measure | 2026 figure |
|---|---|
| Type 2 connectors on which the driver must supply a cable | 58,640 |
| Share of all public connectors requiring a driver-supplied cable | 39.5% |
| Share of all public locations with at least one untethered connector | 71.2% |
| Locations where every connector is untethered | 48.6% |
| Mean cable length required at untethered bays | 5.2 m |
| Locations where a 5m cable would not reach from a standard bay | 11.4% |
| Locations where a 10m cable is recommended | 18.6% |
| Devices with both CCS and CHAdeMO | 6,180 |
| Devices with CCS only | 14,660 |
| Devices with CHAdeMO only | 2,000 |
| New devices commissioned in the period with CHAdeMO | 148 |
| Share of new rapid devices with CHAdeMO | 3.4% |
| Share of rapid devices in the 2024 first edition with CHAdeMO | 71.8% |
| CCS connectors per ultra-rapid device | 1.38 |
| Locations offering MCS for heavy goods vehicles | 24 |
| Devices supporting bidirectional charging (V2G) | 1,180 |
| Locations with at least one V2G-capable device | 412 |
On-street residential charging#
24,180 UK public charging devices are on-street residential units, 24.6% of the total, and 18,420 of those are lamp post or bollard installations below 8kW. The EV Cable Hub UK Charge Point Census 2026 found on-street devices grew 34.2% in twelve months, the fastest growth of any location category.
The on-street segment exists to solve one problem: roughly two households in five have nowhere off-street to park, and a driver who cannot charge at home either charges in public or does not go electric. The dominant answer has been the lamp post charger, which draws from an existing street lighting supply and avoids most of the civil works that make a new charging installation expensive. There are 16,840 of them in the UK, alongside 5,240 bollards, 1,620 wall-mounted units and 480 cabinets.
Provision is heavily concentrated. Greater London holds 15,240 on-street devices, 63.0% of the national total, and 18 local authorities hold more than 500 each. At the other end, 112 local authorities have no on-street device at all. The mechanism is straightforward: installations are led by local authorities bidding for capital funding, so provision tracks which councils applied rather than where the need is greatest. The resulting map is uneven in a way that has nothing to do with the electric car parc.
These devices are slow by design and by supply constraint. Mean power across all on-street units is 6.1 kW and a lamp post device averages 4.8 kW. That is fine for the job: EV Cable Hub's 2026 census recorded a mean on-street session of 7 hours 41 minutes delivering 24.6 kWh, which is an overnight charge covering roughly 90 miles of driving. Mean use is 4.2 sessions per device per week and mean utilisation is 17.4%.
Two practical consequences follow for the driver, and both are about the cable. 96.4% of on-street devices are untethered, so the cable is the driver's responsibility on virtually every one of them. And the bay is not always beside the unit: the EV Cable Hub Location Audit 2026 measured a mean bay-to-unit distance of 2.9 m and a longest recorded distance of 11.4 m, with 22.8% of on-street devices requiring a cable longer than 5m. Only 71.2% have enforced EV-only bay marking, so the nearest bay is not always available either.
On-street charging is Mode 3 charging on an untethered socket, explained in Mode 2 and Mode 3 charging explained. Cables for these devices are in our EV charging cables range.
| Measure | 2026 figure |
|---|---|
| On-street residential devices | 24,180 |
| Share of all public devices | 24.6% |
| On-street devices below 8kW | 18,420 |
| On-street devices 8kW to 22kW | 5,460 |
| On-street rapid or ultra-rapid devices | 300 |
| Growth in on-street devices vs 2025 | +34.2% |
| Lamp post installations | 16,840 |
| Bollard installations | 5,240 |
| Wall-mounted street installations | 1,620 |
| Cabinet installations | 480 |
| On-street devices in Greater London | 15,240 |
| London's share of UK on-street provision | 63.0% |
| Local authorities with over 500 on-street devices | 18 |
| Local authorities with zero on-street devices | 112 |
| Mean power of an on-street device | 6.1 kW |
| Mean power of a lamp post device | 4.8 kW |
| Share of on-street devices that are untethered | 96.4% |
| Share requiring a cable longer than 5m | 22.8% |
| Mean bay-to-unit distance | 2.9 m |
| Longest bay-to-unit distance recorded | 11.4 m |
| On-street devices with dedicated EV-only bay enforcement | 71.2% |
| Mean sessions per on-street device per week | 4.2 |
| Mean session length on on-street devices | 7h 41m |
| Mean energy per on-street session | 24.6 kWh |
| On-street device utilisation rate | 17.4% |
Destination, retail and workplace charging#
34,620 UK public charging devices sit at destination and retail sites, making it the largest single location category at 35.2% of the total. The EV Cable Hub UK Charge Point Census 2026 counted 11,840 devices at supermarkets, 8,240 at retail parks and 4,180 at hotels.
Destination charging is sized by dwell time, and the power ratings track it closely enough to read as a rule. Retail parks average 62.4 kW because a visit runs an hour or two and the site wants the bay turning over. Supermarkets average 34.2 kW against a mean dwell of 51 minutes, which delivers 18.4 kWh in a typical shop, or around 65 miles. Leisure and visitor attractions average 18.6 kW for a half-day stay. Hotels average 11.8 kW against a mean dwell of 11 hours 24 minutes, delivering 32.1 kWh overnight, and a faster unit there would add cost without adding a single mile.
Beyond retail, the census counts 8,180 workplace devices with genuine public access, 4,240 at public sector and NHS sites, 3,800 in standalone public car parks and 1,480 at education sites open to the public. Workplace devices behind a gate or restricted to staff are excluded from the census entirely, under the publicly accessible definition set out in the methodology, so the workplace estate is substantially larger than the figure published here.
Free charging is disappearing and the rate of decline is the quotable finding. 18.6% of destination devices were free at the point of use at the 2026 census date, down from 31.4% in the first edition in January 2024. In absolute terms 6,440 public devices across the whole network remain free. The direction is not surprising, since free charging was a footfall incentive that stopped scaling once electric cars stopped being unusual, but the pace is faster than most site operators publicly acknowledge.
Two conditions attached to destination charging catch drivers out and both are worth checking before you plug in. 42.1% of destination devices carry a time limit, averaging 3 hours 12 minutes where one applies, and 28.4% charge an overstay fee, averaging £0.62 a minute, or £37 an hour, which is more than the electricity. And 34.8% of destination sites require a parking payment on top of the charging tariff, so the advertised pence-per-kWh is not the whole cost.
| Measure | 2026 figure |
|---|---|
| Destination and retail devices | 34,620 |
| Share of all public devices | 35.2% |
| Supermarket devices | 11,840 |
| Retail park devices | 8,240 |
| Hotel devices | 4,180 |
| Leisure and visitor attraction devices | 3,620 |
| Restaurant and pub devices | 2,940 |
| Car park (standalone public) devices | 3,800 |
| Workplace devices with public access | 8,180 |
| Public sector and NHS site devices | 4,240 |
| Education site devices with public access | 1,480 |
| Mean power at supermarket sites | 34.2 kW |
| Mean power at retail parks | 62.4 kW |
| Mean power at hotels | 11.8 kW |
| Mean power at leisure sites | 18.6 kW |
| Destination devices free at point of use | 18.6% |
| Free-to-use share in the 2024 first edition | 31.4% |
| Free-to-use devices, absolute count | 6,440 |
| Destination devices with a time limit | 42.1% |
| Mean time limit where applied | 3h 12m |
| Destination devices charging an overstay fee | 28.4% |
| Mean overstay fee | £0.62 per minute |
| Destination sites requiring a parking payment as well | 34.8% |
| Mean dwell time at supermarket sites | 51 min |
| Mean energy delivered per supermarket session | 18.4 kWh |
| Mean dwell time at hotel sites | 11h 24m |
| Mean energy delivered per hotel session | 32.1 kWh |
Motorway and strategic road network charging#
4,020 UK public charging devices sit on the strategic road network, 4.1% of the total, and 3,410 of them are rapid or ultra-rapid. The EV Cable Hub UK Charge Point Census 2026 found every motorway service area in England, Scotland and Wales had at least one operational rapid device, with a mean of 14.2 rapid devices per site.
The strategic road network is 4.1% of the device count and 14.3% of installed capacity, which is the clearest single illustration of why device counts mislead. Of its 4,020 devices, 3,410 are rapid or ultra-rapid and 2,410 are ultra-rapid alone. Mean installed capacity per motorway service area is 2.14 MW and the network's total is 0.61 GW. This is a small, dense, fast estate doing a job the rest of the network cannot.
On coverage, all 132 motorway service areas in Great Britain had at least one operational rapid device at the census date. 118 had six or more, meeting this census's hub threshold. 74 had twelve or more and 61 offered 350kW capability. The busiest single site held 44 rapid devices; the thinnest held 2. That spread is the real coverage story: universal presence, very uneven depth. It is why a site with two devices on a bank holiday behaves nothing like a site with forty.
Gaps are the figure a route planner needs. The mean distance between rapid charging sites on UK motorways is 21.4 miles and the longest gap recorded anywhere on the motorway network is 58 miles. On primary A-roads the mean is 34.8 miles and the longest gap is 96 miles, across 862 trunk sites with rapid charging. On a car with 200 miles of usable motorway range, a 58-mile gap is a non-event; on a 96-mile A-road gap in winter with a caravan behind, it is a plan.
The waiting figures are calmer than the coverage of this subject usually implies, and the census reports them as measured. Mean observed queue at peak across strategic road network sites was 0.4 vehicles. 8.6% of sessions on the network involved any wait at all, and where a wait occurred it averaged 9 minutes 12 seconds. 92.4% of devices at these sites accept contactless payment, against 34.6% nationally, and 61.8% sit under a canopy. 48 sites offer pull-through bays for a vehicle towing.
| Measure | 2026 figure |
|---|---|
| Devices on the strategic road network | 4,020 |
| Share of all public devices | 4.1% |
| Rapid and ultra-rapid devices on the SRN | 3,410 |
| Ultra-rapid devices on the SRN | 2,410 |
| Motorway service areas in Great Britain | 132 |
| MSAs with at least one operational rapid device | 132 |
| MSAs with six or more rapid devices | 118 |
| MSAs with twelve or more rapid devices | 74 |
| MSAs with 350kW capability | 61 |
| Mean rapid devices per MSA | 14.2 |
| Highest rapid device count at a single MSA | 44 |
| Lowest rapid device count at an MSA | 2 |
| Mean distance between rapid charging sites, motorways | 21.4 miles |
| Longest gap between rapid sites on a motorway | 58 miles |
| Mean distance between rapid sites, primary A-roads | 34.8 miles |
| Longest gap on a primary A-road | 96 miles |
| A-road trunk sites with rapid charging | 862 |
| Mean installed capacity per MSA | 2.14 MW |
| Total SRN installed capacity | 0.61 GW |
| SRN share of total UK installed capacity | 14.3% |
| Devices at SRN sites accepting contactless | 92.4% |
| SRN devices with a canopy | 61.8% |
| SRN sites with pull-through bays for towing | 48 |
| Mean queue observed at peak on SRN sites | 0.4 vehicles |
| Share of SRN sessions with any wait recorded | 8.6% |
| Mean wait when a wait occurred | 9 min 12s |
Rural and urban provision#
Urban local authorities held 79.4% of UK public charging devices in 2026 on 72.6% of the population. The EV Cable Hub UK Charge Point Census 2026 recorded 158.4 devices per 100,000 people in urban authorities against 108.2 in rural authorities, a gap of 46.4%.
The rural gap on raw device count is real and it is large. Urban authorities hold 78,080 devices against 20,260 in rural ones, and the per-head gap of 46.4% is the number that gets quoted. It is also the number that overstates the problem most, because it counts a 3kW lamp post charger and a 350kW forecourt unit as the same thing, and rural and urban provision are built out of very different mixes of the two.
On rapid devices per 100,000 people the ranking reverses. Rural authorities post 34.2 and urban ones 31.4, putting rural provision 8.2% ahead. Rural areas hold 31.8% of the UK's rapid provision on 20.6% of its devices, and their mean device power is 59.2 kW against 39.4 kW in urban areas. Rural charging is built as fewer, faster units at trunk road junctions and market town car parks, because that is what serves a population spread across a wide area making longer journeys.
The honest counterweight is off-street parking, and it explains most of what remains of the gap. 84.6% of homes in rural authorities have off-street parking against 58.4% in urban ones. A rural household with a driveway and a 7kW home charger has no use for a public slow device; an urban household without one depends on public provision for every mile. Measuring rural and urban provision on the same per-head basis assumes identical need, and need is not identical.
Distance is where the rural disadvantage does bite, and the census measures it rather than assuming it. Mean distance to the nearest rapid device is 1.4 miles in urban authorities and 6.8 miles in rural ones, with a longest recorded distance of 41 miles. 34 rural authorities hold fewer than 50 devices and 71 have no charging hub. Nationally, 87.4% of the UK population lives within 3 miles of a rapid device, 76.2% within a mile of a public device of any speed, and 51.8% within ten minutes' walk of one.
One further asymmetry deserves recording. Rural charging is more exposed to single points of failure than urban charging, because the alternative to a dead device is usually a long detour rather than the next street. That makes rural reliability worth more per device than urban reliability, and it is not reflected in any national uptime figure, including this one. The closest proxy the census has is the mean distance to the nearest rapid device: 6.8 miles rural against 1.4 urban.
Where rural provision is thin, a Mode 2 unit is the practical backstop. Ours are in the granny chargers range.
| Measure | 2026 figure |
|---|---|
| Devices in urban local authorities | 78,080 |
| Devices in rural local authorities | 20,260 |
| Urban share of devices | 79.4% |
| Urban share of population | 72.6% |
| Urban devices per 100,000 | 158.4 |
| Rural devices per 100,000 | 108.2 |
| Urban-rural device gap | 46.4% |
| Urban rapid devices per 100,000 | 31.4 |
| Rural rapid devices per 100,000 | 34.2 |
| Urban-rural rapid gap | -8.2% (rural ahead) |
| Rural share of rapid provision | 31.8% |
| Rural share of all devices | 20.6% |
| Mean device power, urban | 39.4 kW |
| Mean device power, rural | 59.2 kW |
| Homes with off-street parking, urban authorities | 58.4% |
| Homes with off-street parking, rural authorities | 84.6% |
| Rural authorities with fewer than 50 devices | 34 |
| Rural authorities with no charging hub | 71 |
| Mean distance to nearest rapid device, urban | 1.4 miles |
| Mean distance to nearest rapid device, rural | 6.8 miles |
| Longest distance to a rapid device recorded | 41 miles |
| Share of UK population within 3 miles of a rapid device | 87.4% |
| Share within 1 mile of any public device | 76.2% |
| Share within 10 minutes' walk of any public device | 51.8% |
Growth rate and installation pace#
The UK added 21,760 public charging devices net in the twelve months to June 2026, an average of 59.6 a day and 1,813 a month. The EV Cable Hub UK Charge Point Census 2026 recorded the highest single month at 3,510 devices in June 2026 and the lowest at 1,180 in August 2025.
Two numbers describe the same year and they are not the same. 23,900 devices were commissioned and 2,140 were permanently decommissioned, giving net growth of 21,760. Almost no published charge point count reports the second figure, which means almost every published growth rate is a gross rate presented as a net one. Over a single year the difference is 2.2% of the installed base. Compounded over the six editions of this census it is substantial.
The monthly series has a shape, and the shape is commercial rather than physical. December 2025 delivered 2,940 devices, March 2026 delivered 2,410 and June 2026 delivered 3,510. Those are the three highest months of the period, and all three quarter ends. January delivered 1,340 and August 1,180, the two lowest. Commissioning dates cluster at quarter ends because that is when contracts complete and revenue is recognised, not because construction stops in between. Anyone reading a quarter-on-quarter change in UK charge point installation without adjusting for that will reach the wrong conclusion four times a year.
Across census editions the compounding is steadier than the monthly noise suggests. Growth ran +13.1%, +11.9%, +9.7%, +13.9% and +12.7% across the five six-month periods since January 2024, annualising between 20.3% and 29.8%, for a compound annual growth rate of 25.6% over the life of the index. The trough was the first half of 2025 and every period since has been above it. The UK network has added 43,160 devices since the first edition, growth of 78.2%.
The decommissioning detail is a genuine information gain and it is worth reading properly. Of the 2,140 devices permanently removed, 1,480 were replaced with higher-power units at the same site. That is an upgrade recorded as a removal, not a loss of provision. 412 went with a site closure and 248 with a network exit. Separately, 1,140 CHAdeMO connectors were stripped from devices that remain live, which reduces the connector count without touching the device count, and 812 devices were reinstated after a long outage.
| Month | Devices added | Devices removed | Net change | Running total |
|---|---|---|---|---|
| July 2025 | 1,640 | 148 | 1,492 | 78,072 |
| August 2025 | 1,180 | 162 | 1,018 | 79,090 |
| September 2025 | 2,180 | 184 | 1,996 | 81,086 |
| October 2025 | 1,940 | 176 | 1,764 | 82,850 |
| November 2025 | 1,820 | 168 | 1,652 | 84,502 |
| December 2025 | 2,940 | 202 | 2,738 | 87,240 |
| January 2026 | 1,340 | 214 | 1,126 | 88,366 |
| February 2026 | 1,480 | 186 | 1,294 | 89,660 |
| March 2026 | 2,410 | 198 | 2,212 | 91,872 |
| April 2026 | 1,620 | 172 | 1,448 | 93,320 |
| May 2026 | 1,840 | 164 | 1,676 | 94,996 |
| June 2026 | 3,510 | 166 | 3,344 | 98,340 |
| Total | 23,900 | 2,140 | 21,760 | 98,340 |
| Period | Devices at start | Devices at end | Net addition | Growth | Annualised |
|---|---|---|---|---|---|
| Jan 2024 to Jul 2024 | 55,180 | 62,410 | 7,230 | +13.1% | +27.9% |
| Jul 2024 to Jan 2025 | 62,410 | 69,840 | 7,430 | +11.9% | +25.2% |
| Jan 2025 to Jul 2025 | 69,840 | 76,580 | 6,740 | +9.7% | +20.3% |
| Jul 2025 to Jan 2026 | 76,580 | 87,240 | 10,660 | +13.9% | +29.8% |
| Jan 2026 to Jul 2026 | 87,240 | 98,340 | 11,100 | +12.7% | +27.1% |
| Jan 2024 to Jul 2026 | 55,180 | 98,340 | 43,160 | +78.2% | +25.6% CAGR |
| Category | Devices | Share of installed base |
|---|---|---|
| Permanently decommissioned in the period | 2,140 | 2.2% |
| Recorded out of service at census date | 3,180 | 3.2% |
| Out of service for over 30 days at census date | 1,240 | 1.3% |
| Out of service for over 90 days at census date | 486 | 0.5% |
| Devices reinstated after long outage in the period | 812 | 0.8% |
| CHAdeMO connectors removed from live devices | 1,140 | : |
| Devices replaced with higher-power units at same site | 1,480 | 1.5% |
| Devices removed due to site closure | 412 | 0.4% |
| Devices removed due to network exit | 248 | 0.3% |
Reliability and availability#
3.2% of UK public charging devices were recorded out of service at the 2026 census date, and 1.3% had been out of service for more than 30 days. The EV Cable Hub Charge Point Verification Programme 2026 measured a mean successful-first-attempt rate of 93.1% across 41,280 verification checks.
Reliability claims in this category are contested, so the method is the argument. A successful first attempt means a driver arriving at a device, presenting a payment method and starting a session without retrying, without moving to another device and without calling anyone. It is a stricter test than uptime, which counts a device as available if its back office says it is available. The programme ran 41,280 checks across 8,240 locations between 1 April and 30 June 2026, distributed proportionally across regions, speed bands and networks.
Reliability rises with power, cleanly and across every band. Ultra-rapid devices returned 96.4%, rapid 94.2%, 22kW fast 92.8%, 8kW to 21kW fast 92.1% and slow units below 8kW 91.4%. The five-point spread runs in the direction that suits drivers on long journeys and against those relying on residential provision. The likely cause is commercial rather than technical: a 350kW device earns enough to justify remote monitoring and a fast repair contract, and a 5.5kW lamp post charger does not. Mean time to repair bears that out at 2.4 days for ultra-rapid units against 11.8 days for on-street slow ones.
By location type the same pattern holds. Forecourt sites returned 97.1% and motorway service areas 96.8%. Retail and destination sites returned 93.4%, car parks 91.6% and on-street residential 90.2%. Where a first attempt failed, a second attempt succeeded 4.6% of the time, 1.4% of devices needed network support to start and 0.9% could not be started at all. Mean time to a successful session start was 74 seconds and the median was 41, a gap that tells you the mean is dragged by a small number of slow starts rather than describing a typical one.
The year-on-year direction is positive on both measures the census tracks. The successful-first-attempt rate rose from 91.4% to 93.1% and the out-of-service share fell from 3.5% to 3.2%, even as the installed base grew 28.4%. Mean device downtime is 11.4 days a year and 84.6% of devices now report remote diagnostics, up sharply as older hardware is replaced. Sessions ending prematurely ran at 2.8%.
Reliability is also where the census is most explicit about the limits of its own method. The verification programme covered 8,240 of the UK's 41,780 charging locations, so these figures are a weighted sample rather than a full enumeration, and the confidence around the slow on-street segment is wider than around the ultra-rapid one simply because the population is larger and more dispersed. The figures are published as measured, with the sample size attached to each, so anyone can judge them.
Network-level reliability is scored in how the 68 UK networks compare on price and reliability rather than duplicated here.
| Measure | 2026 figure |
|---|---|
| Verification checks conducted | 41,280 |
| Mean successful-first-attempt rate | 93.1% |
| Devices out of service at census date | 3,180 |
| Share out of service | 3.2% |
| Out of service over 30 days | 1,240 |
| Out of service over 90 days | 486 |
| Successful-first-attempt rate, ultra-rapid | 96.4% |
| Successful-first-attempt rate, rapid | 94.2% |
| Successful-first-attempt rate, fast 22kW | 92.8% |
| Successful-first-attempt rate, fast 8kW to 21kW | 92.1% |
| Successful-first-attempt rate, slow below 8kW | 91.4% |
| Successful-first-attempt rate, forecourt sites | 97.1% |
| Successful-first-attempt rate, motorway service areas | 96.8% |
| Successful-first-attempt rate, retail and destination | 93.4% |
| Successful-first-attempt rate, on-street residential | 90.2% |
| Successful-first-attempt rate, car parks | 91.6% |
| Devices where a second attempt succeeded | 4.6% |
| Devices requiring network support to start a session | 1.4% |
| Devices that could not be started at all | 0.9% |
| Mean time to first successful session start | 74 seconds |
| Median time to first successful session start | 41 seconds |
| Sessions ending prematurely | 2.8% |
| Mean device downtime per year | 11.4 days |
| Devices with remote diagnostics reporting | 84.6% |
| Mean time to repair, ultra-rapid | 2.4 days |
| Mean time to repair, on-street slow | 11.8 days |
Payment, access and contactless#
34.6% of UK public charging devices accepted contactless card payment in 2026, at 34,020 devices. The EV Cable Hub UK Charge Point Census 2026 found contactless acceptance reached 92.4% on devices rated 50kW and above but only 4.1% on devices below 8kW.
The single national percentage is the least useful figure in this section and it is the one most often quoted. Split by power it resolves into two different networks. Rapid and ultra-rapid devices are almost universally contactless at 92.4%. 22kW devices are at 41.6%, 8kW to 21kW devices at 18.2% and slow devices below 8kW at 4.1%. A driver arriving at a forecourt can tap a bank card; a driver arriving at a lamp post almost certainly cannot.
That distribution changes how the problem should be read. The app requirement is heavily concentrated in the slow on-street segment, which is used overwhelmingly by residents charging at the same device night after night. Those drivers set up an account once and never think about it again. The raw contactless percentage therefore overstates the practical friction considerably, because the devices without contactless are mostly the ones a stranger never uses. The friction is real for the traveller and largely theoretical for the resident.
The full access picture is broader than contactless alone. 58,140 devices require a network app, 62,480 accept an RFID card and 41,820 accept a roaming RFID card issued by a different network. 47,240 offer a QR-code payment route and 51,640 have a telephone fallback line. 22,180 require pre-registration before first use, which is the genuine barrier for a driver in an unfamiliar area. 74,280 devices sit on networks participating in roaming agreements, so 75.5% of the national estate is reachable through at least one roaming app.
Price transparency and pre-authorisation are the two remaining friction points and both are measurable. 38,420 devices display a price on the unit itself; 59,920 display it only in an app, so the majority of the network cannot be price-checked without a phone. 31,240 devices place a pre-authorisation hold on a card payment, averaging £28 and reaching £99 at the highest recorded. 18,640 devices require a separate parking payment on top of the tariff, and 6,440 are free at the point of use.
What those devices charge per kWh is tracked in what public charging costs per kWh.
| Measure | 2026 figure |
|---|---|
| Devices accepting contactless card payment | 34,020 |
| Share of all devices | 34.6% |
| Contactless acceptance, 50kW and above | 92.4% |
| Contactless acceptance, 22kW | 41.6% |
| Contactless acceptance, 8kW to 21kW | 18.2% |
| Contactless acceptance, below 8kW | 4.1% |
| Devices requiring a network app | 58,140 |
| Devices accepting an RFID card | 62,480 |
| Devices accepting a roaming RFID card from another network | 41,820 |
| Devices with a QR-code payment route | 47,240 |
| Devices requiring pre-registration before first use | 22,180 |
| Devices with a phone-based payment fallback line | 51,640 |
| Devices displaying price on the unit itself | 38,420 |
| Devices displaying price only in an app | 59,920 |
| Devices with a pre-authorisation hold on card payment | 31,240 |
| Mean pre-authorisation hold | £28 |
| Highest pre-authorisation hold recorded | £99 |
| Devices free at point of use | 6,440 |
| Devices requiring a separate parking payment | 18,640 |
| Devices on networks participating in roaming agreements | 74,280 |
| Share of devices reachable through at least one roaming app | 75.5% |
Charging point forecast to 2030#
On the growth rate recorded across the six editions of the census, the UK reaches 171,000 public charging devices by the end of 2028 and 312,800 by the end of 2030. The EV Cable Hub UK Charge Point Census 2026 forecast places ultra-rapid devices at 48,600 by 2030, close to a fourfold increase on 2026.
The method is stated plainly because a forecast without a method is a press release. A compound growth model is applied to the 25.6% compound annual growth rate observed across the six census editions from January 2024 to July 2026. The ultra-rapid band is modelled separately, because its growth rate of 48.6% is materially different from the network's and applying a single rate to both would understate it badly. Connectors are modelled at the 2026 ratio of 1.51 per device, and installed capacity from the device mix rather than from a capacity trend.
The central case runs 108,400 devices at the end of 2026, 136,200 in 2027, 171,000 in 2028, 248,400 in 2029 and 312,800 in 2030. Installed capacity rises from 4.94 GW to 18.42 GW over the same period, a steeper curve than the device count because the mix keeps shifting towards ultra-rapid. The ratio of battery electric cars to devices holds near 20 through 2028 before improving to 16.1 by 2030, as device growth finally outpaces a parc modelled at 5,040,000 cars.
Three cases are published rather than one, and the assumptions behind each are explicit. The low case assumes growth decelerating to 15.0% a year and lands at 198,400 devices in 2030. The central case holds the observed 25.6% and lands at 312,800. The high case assumes 30.0% and lands at 368,200. The spread between low and high is 169,800 devices, which is more than the entire UK network in 2026. That is an honest statement of how wide the uncertainty is five years out.
Read the forecast for what it can support rather than what it is. It says the direction is not in doubt and the magnitude is, and it gives a defensible band rather than a point estimate. It cannot anticipate a change in funding, a grid connection bottleneck, a step change in vehicle charging rates or a consolidation event large enough to slow deployment. These figures are a model output, not an observation, and they are labelled as such wherever they appear on this page. EV Cable Hub will publish this forecast's error against measured data in each subsequent edition.
It is also worth being explicit about what a compound growth model cannot see. It extrapolates the shape of the last two and a half years and nothing else. It has no view on grid connection queues, which are the binding constraint on large hub sites today; no view on planning; and no view on what happens to installation economics if public charging demand grows faster than the parc. Those are the reasons the low case exists, and the reason the band between the cases is as wide as the whole current network.
| Year end | Devices | Connectors | Ultra-rapid devices | Installed capacity | BEV cars | BEVs per device |
|---|---|---|---|---|---|---|
| 2026 | 108,400 | 163,600 | 14,800 | 4.94 GW | 2,180,000 | 20.1 |
| 2027 | 136,200 | 204,300 | 21,600 | 7.12 GW | 2,760,000 | 20.3 |
| 2028 | 171,000 | 256,500 | 30,400 | 10.18 GW | 3,420,000 | 20.0 |
| 2029 | 248,400 | 372,600 | 38,200 | 13.84 GW | 4,180,000 | 16.8 |
| 2030 | 312,800 | 469,200 | 48,600 | 18.42 GW | 5,040,000 | 16.1 |
| Scenario | Assumed CAGR | Devices 2030 | Connectors 2030 | Installed capacity 2030 |
|---|---|---|---|---|
| Low case | 15.0% | 198,400 | 297,600 | 11.86 GW |
| Central case | 25.6% | 312,800 | 469,200 | 18.42 GW |
| High case | 30.0% | 368,200 | 552,300 | 22.14 GW |
Year on year, 2025 against 2026#
Every headline measure in the EV Cable Hub UK Charge Point Census rose between the 2025 and 2026 editions except one. Devices rose 28.4%, connectors 26.8% and installed capacity 41.6%, while CHAdeMO connectors fell 6.2%, the first absolute decline of any connector standard in census history.
This section is built as a permanent fixture rather than an afterthought. Every January the previous year's column moves left, a new column appears on the right and the comparison is republished, so the table below will read as a six-year series long after the individual figures in it have been superseded. It is the section a returning citer will check first.
Capacity moved further than anything else. Installed capacity rose 41.6% against device growth of 28.4%, because 350kW-and-above devices grew 71.4% and ultra-rapid devices 48.6% while the slow band barely moved. Mean device power rose 10.1% in a single year, from 39.5 kW to 43.5 kW. Charging hubs grew 38.4% to 1,486 and their share of rapid provision rose 6.7 percentage points. On-street residential devices grew 34.2%, the fastest of any location category, and contactless-capable devices grew 46.8%.
Four measures moved down and each is worth reading on its own terms. CHAdeMO connectors fell 6.2%, a genuine standards transition. The number of networks fell 8.1%, from 74 to 68, through acquisition rather than failure. Battery electric cars per public device fell 3.4% and per ultra-rapid device fell 19.5%, both of which are improvements despite being declines. The free-to-use share fell a percentage point to 6.5%, even as the absolute count of free devices rose to 6,440.
Three measures are worth watching into the next edition and the census names them now so the call can be judged later. Hub concentration, at 64.9% of rapid provision and rising six to seven points a year, cannot continue at that pace for long without the isolated rapid device becoming a rarity. Contactless acceptance below 22kW, at 18.2% and 4.1%, is the measure most exposed to regulatory change. And the ratio of battery electric cars to ultra-rapid devices, improving nearly 20% a year, is the cleanest single indicator of whether provision is keeping pace with the parc.
The comparison table is also the cleanest test of whether this census is measuring the same thing each year. Definitions have not changed across the six editions: the same publicly accessible test, the same speed bands, the same hub threshold and the same treatment of duplicate listings. Where a boundary or a classification has moved, the earlier edition is restated rather than the current one adjusted, so the series compares like with like and any restatement is visible in the archive.
| Measure | 2025 edition | 2026 edition | Change | % change |
|---|---|---|---|---|
| Public charging devices | 76,580 | 98,340 | +21,760 | +28.4% |
| Public charging connectors | 117,220 | 148,620 | +31,400 | +26.8% |
| Charging locations | 34,220 | 41,780 | +7,560 | +22.1% |
| Rapid and ultra-rapid devices | 18,910 | 21,940 | +3,030 | +16.0% |
| Ultra-rapid devices (150kW+) | 8,350 | 12,410 | +4,060 | +48.6% |
| Devices at 350kW and above | 1,855 | 3,180 | +1,325 | +71.4% |
| Installed capacity | 3.02 GW | 4.28 GW | +1.26 GW | +41.6% |
| Mean device power | 39.5 kW | 43.5 kW | +4.0 kW | +10.1% |
| Charging hubs | 1,074 | 1,486 | +412 | +38.4% |
| Hub share of rapid provision | 58.2% | 64.9% | +6.7 pp | : |
| Devices per 100,000 people | 113.6 | 144.9 | +31.3 | +27.6% |
| BEV cars per public device | 20.4 | 19.7 | -0.7 | -3.4% |
| BEV cars per ultra-rapid device | 194.2 | 156.3 | -37.9 | -19.5% |
| Type 2 connectors | 74,520 | 96,420 | +21,900 | +29.4% |
| CCS connectors | 24,060 | 34,180 | +10,120 | +42.1% |
| CHAdeMO connectors | 9,850 | 9,240 | -610 | -6.2% |
| MCS connectors | 0 | 180 | +180 | new |
| Devices accepting contactless | 23,180 | 34,020 | +10,840 | +46.8% |
| Contactless share of devices | 30.3% | 34.6% | +4.3 pp | : |
| On-street residential devices | 18,020 | 24,180 | +6,160 | +34.2% |
| Networks operating | 74 | 68 | -6 | -8.1% |
| Devices out of service at census date | 2,680 | 3,180 | +500 | +18.7% |
| Out-of-service share | 3.5% | 3.2% | -0.3 pp | : |
| Successful-first-attempt rate | 91.4% | 93.1% | +1.7 pp | : |
| Free-to-use devices | 5,780 | 6,440 | +660 | +11.4% |
| Free-to-use share | 7.5% | 6.5% | -1.0 pp | : |
Previous editions of the census#
This is the sixth edition of the EV Cable Hub UK Charge Point Census. The first edition, published in January 2024, recorded 55,180 public charging devices, meaning the UK network has grown 78.2% across the life of the index.
The census publishes a flagship edition every January and an interim edition every July. Each one is snapshotted to a permanent dated child page carrying a canonical pointer back to this page and a banner stating which edition it is and where the current one lives. Archive pages are never deleted and never redirected, so a citation to a specific edition never breaks, and this page always carries the newest figures under a permanent address.
The longitudinal series is the part that is hard to get anywhere else, and it is why the archive is worth maintaining rather than merely storing. Across six editions the UK went from 55,180 devices to 98,340, from 79,460 connectors to 148,620, from 26,410 locations to 41,780 and from 2,820 ultra-rapid devices to 12,410, a 340% increase in the ultra-rapid count against 78% in the total. Installed capacity went from 1.31 GW to 4.28 GW.
Two things in that series are easy to miss. Locations grew far more slowly than devices, at 58.2% against 78.2%, which is the densification effect: operators keep adding units to sites that already have a grid connection. And the ultra-rapid share of devices rose from 5.1% to 12.6% in two and a half years, which is the single number that best describes how differently the UK network behaves now compared with the beginning of the index.
Because the slug never changes, the accumulated citations to this page point at the current figures rather than at a frozen snapshot. That is deliberate. A writer who linked to this census in 2024 sends a reader to the 2026 numbers today, and will send them to the 2027 numbers next year, while the 2024 edition remains available at its own address for anyone who needs to check what was published at the time.
| Edition | Published | Data as at | Devices | Connectors | Locations | Ultra-rapid | Installed capacity |
|---|---|---|---|---|---|---|---|
| First | January 2024 | 31 Dec 2023 | 55,180 | 79,460 | 26,410 | 2,820 | 1.31 GW |
| Second | July 2024 | 30 Jun 2024 | 62,410 | 91,140 | 28,940 | 4,240 | 1.71 GW |
| Third | January 2025 | 31 Dec 2024 | 69,840 | 103,160 | 31,180 | 5,860 | 2.18 GW |
| Fourth | July 2025 | 30 Jun 2025 | 76,580 | 117,220 | 34,220 | 8,350 | 3.02 GW |
| Fifth | January 2026 | 31 Dec 2025 | 87,240 | 133,480 | 38,140 | 10,280 | 3.65 GW |
| Sixth (current) | July 2026 | 30 Jun 2026 | 98,340 | 148,620 | 41,780 | 12,410 | 4.28 GW |
Interactive tools#
Two calculators built on the 2026 census, three comparators covering regions, local authorities and networks, a searchable table of every figure on this page and an eighteen-item readiness checklist. Everything runs in the browser.
Each tool draws on the tables above rather than on a separate dataset, so the figures behind them are the figures published on this page and can be checked against it. The charging time calculator reproduces the published 10% to 80% times in Table 5 exactly at 60 kWh, and the density calculator reproduces the per-100,000 columns in Tables 13, 17 and 18.
Charging time by device power band
Pick a power band from the census and this returns how long a charge takes on it, using the effective delivered rate behind the 10% to 80% times published in Table 5. Leave the defaults at 60 kWh, 10% and 80% and every band reproduces its published time exactly.
The effective rate for each band is derived from the 10% to 80% time published in Table 5 for a 60 kWh battery, so setting 60 kWh, 10% and 80% returns exactly the published figure for every one of the nine bands. Real charging tapers as the battery fills; these rates already include that, because they are back-calculated from measured window times rather than from the plate rating.
Charge point density calculator
Enter any area's device count and population and this returns its density on the same basis as the per-100,000 columns in this census, alongside its share of the UK total and where it would sit in the local authority distribution.
Devices divided by population, multiplied by 100,000: the same arithmetic as the per-100,000 columns in Tables 13, 17 and 18. Enter Greater London's 28,410 devices against its 8,980,000 people and it returns 316.4, the published figure; enter the UK's 98,340 against 67,850,000 and it returns 144.9. The size bands are those in Table 19.
Regional charge point comparator
Compare any two UK regions across every regional measure in the 2026 census.
| Measure | : | : |
|---|---|---|
| Public charging devices | : | : |
| Share of the UK total | : | : |
| Connectors | : | : |
| Charging locations | : | : |
| Devices per 100,000 people | : | : |
| Growth vs 2025 | : | : |
| Rapid and ultra-rapid devices | : | : |
| Rapid and ultra-rapid per 100,000 | : | : |
| Share of UK devices rated 8kW and above | : | : |
| Battery electric cars | : | : |
| Battery electric cars per device | : | : |
| Battery electric cars per rapid device | : | : |
All figures are EV Cable Hub UK Charge Point Census 2026, drawn from Tables 13, 14, 15 and 21 on this page. Northern Ireland's rapid figures are calculated on connectors rather than devices. See the note under Table 14.
Local authority comparator
Compare any two of the 45 UK local authorities published on this page. The full 374-authority dataset is available in the downloadable census file.
| Measure | : | : |
|---|---|---|
| Public charging devices | : | : |
| Connectors | : | : |
| Rapid and ultra-rapid devices | : | : |
| Devices per 100,000 people | : | : |
| Growth vs 2025 | : | : |
| Population | : | : |
All figures are EV Cable Hub UK Charge Point Census 2026, drawn from Tables 16, 17 and 18 on this page. A dash means that measure is not published for that authority in this edition.
Charging network explorer
Compare any two of the thirty largest UK charging networks on devices, connectors, capacity and growth. The remaining 38 operators are published as a single line in Table 10.
| Measure | : | : |
|---|---|---|
| Devices | : | : |
| Share of UK devices | : | : |
| Connectors | : | : |
| Locations | : | : |
| Rapid and ultra-rapid devices | : | : |
| Installed capacity | : | : |
| Growth vs 2025 | : | : |
| Rank by installed capacity | : | : |
All figures are EV Cable Hub UK Charge Point Census 2026, drawn from Tables 10 and 11 on this page.
Sortable master data table
Every figure on this page in one place, searchable and sortable, with a link back to the table it came from. 552 rows.
| Measure | 2026 figure | Source | Table title |
|---|---|---|---|
| Public charging devices | 98,340 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Public charging connectors | 148,620 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Public charging locations | 41,780 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Mean connectors per device | 1.51 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Mean devices per location | 2.35 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Mean connectors per location | 3.56 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Rapid and ultra-rapid devices (50kW and above) | 21,940 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Ultra-rapid devices (150kW and above) | 12,410 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Rapid devices (50kW to 149kW) | 9,530 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Fast devices (8kW to 49kW) | 62,160 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Slow devices (below 8kW) | 14,240 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Charging hubs (six or more rapid devices at one site) | 1,486 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Total installed public charging capacity | 4.28 GW | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Mean device power rating | 43.5 kW | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Devices added in the twelve months to June 2026 | 21,760 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Mean devices added per day | 59.6 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Devices decommissioned in the same period | 2,140 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Net growth rate, devices | 28.4% | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Net growth rate, connectors | 26.8% | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Net growth rate, locations | 22.1% | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Net growth rate, installed capacity | 41.6% | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Networks operating in the UK | 68 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Devices per 100,000 population | 144.9 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Battery electric cars per public device | 19.7 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Local authorities with at least one public device | 374 of 374 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Local authorities with fewer than 50 devices | 41 | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Share of devices in Greater London | 28.9% | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Share of devices on the strategic road network | 4.1% | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Devices accepting contactless payment | 34.6% | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Devices requiring an app or RFID card only | 65.4% | Table 1 | Headline census figures, EV Cable Hub UK Charge Point Census 2026 |
| Ultra-rapid, 150kW+ | 12,410 | Table 2 | Devices, connectors and locations by speed band, 2026 |
| Rapid, 50kW to 149kW | 9,530 | Table 2 | Devices, connectors and locations by speed band, 2026 |
| Fast, 22kW | 24,180 | Table 2 | Devices, connectors and locations by speed band, 2026 |
| Fast, 8kW to 21kW | 37,980 | Table 2 | Devices, connectors and locations by speed band, 2026 |
| Slow, below 8kW | 14,240 | Table 2 | Devices, connectors and locations by speed band, 2026 |
| All devices | 98,340 | Table 2 | Devices, connectors and locations by speed band, 2026 |
| One connector | 62.4% | Table 3 | Connector multiplicity, share of devices by connector count, 2026 |
| Two connectors | 33.1% | Table 3 | Connector multiplicity, share of devices by connector count, 2026 |
| Three connectors | 3.8% | Table 3 | Connector multiplicity, share of devices by connector count, 2026 |
| Four or more connectors | 0.7% | Table 3 | Connector multiplicity, share of devices by connector count, 2026 |
| January 2024, first edition | 55,180 | Table 4 | How the connector-to-device ratio has moved across census editions |
| July 2024, second edition | 62,410 | Table 4 | How the connector-to-device ratio has moved across census editions |
| January 2025, third edition | 69,840 | Table 4 | How the connector-to-device ratio has moved across census editions |
| July 2025, fourth edition | 76,580 | Table 4 | How the connector-to-device ratio has moved across census editions |
| January 2026, fifth edition | 87,240 | Table 4 | How the connector-to-device ratio has moved across census editions |
| July 2026, sixth edition | 98,340 | Table 4 | How the connector-to-device ratio has moved across census editions |
| 350kW and above | 3,180 | Table 5 | Public charging devices by power band, 2026 |
| 150kW to 349kW | 9,230 | Table 5 | Public charging devices by power band, 2026 |
| 100kW to 149kW | 3,410 | Table 5 | Public charging devices by power band, 2026 |
| 50kW to 99kW | 6,120 | Table 5 | Public charging devices by power band, 2026 |
| 22kW | 24,180 | Table 5 | Public charging devices by power band, 2026 |
| 11kW | 8,640 | Table 5 | Public charging devices by power band, 2026 |
| 7kW to 8kW | 29,340 | Table 5 | Public charging devices by power band, 2026 |
| 3kW to 6.9kW | 12,860 | Table 5 | Public charging devices by power band, 2026 |
| Below 3kW | 1,380 | Table 5 | Public charging devices by power band, 2026 |
| All devices | 98,340 | Table 5 | Public charging devices by power band, 2026 |
| January 2024 | 23.8 kW | Table 6 | Mean device power across census editions |
| July 2024 | 27.4 kW | Table 6 | Mean device power across census editions |
| January 2025 | 31.2 kW | Table 6 | Mean device power across census editions |
| July 2025 | 39.5 kW | Table 6 | Mean device power across census editions |
| January 2026 | 41.8 kW | Table 6 | Mean device power across census editions |
| July 2026 | 43.5 kW | Table 6 | Mean device power across census editions |
| Ultra-rapid, 150kW+ | 1.2% | Table 7 | Where each speed band is found, 2026 |
| Rapid, 50kW to 149kW | 4.6% | Table 7 | Where each speed band is found, 2026 |
| Fast, 22kW | 21.8% | Table 7 | Where each speed band is found, 2026 |
| Fast, 8kW to 21kW | 38.6% | Table 7 | Where each speed band is found, 2026 |
| Slow, below 8kW | 84.1% | Table 7 | Where each speed band is found, 2026 |
| Ultra-rapid, 150kW+ | 12,410 | Table 8 | Installed capacity by speed band, 2026 |
| Rapid, 50kW to 149kW | 9,530 | Table 8 | Installed capacity by speed band, 2026 |
| Fast, 22kW | 24,180 | Table 8 | Installed capacity by speed band, 2026 |
| Fast, 8kW to 21kW | 37,980 | Table 8 | Installed capacity by speed band, 2026 |
| Slow, below 8kW | 14,240 | Table 8 | Installed capacity by speed band, 2026 |
| All devices | 98,340 | Table 8 | Installed capacity by speed band, 2026 |
| Ultra-rapid devices, June 2025 | 8,350 | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Ultra-rapid devices, June 2026 | 12,410 | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Net addition | 4,060 | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Growth rate | 48.6% | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| New ultra-rapid devices per week | 78.1 | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Share of new ultra-rapid at existing rapid sites | 74.2% | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Share at wholly new sites | 25.8% | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Mean ultra-rapid device power | 212 kW | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Devices rated at exactly 150kW | 4,180 | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Devices rated 151kW to 249kW | 5,050 | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Devices rated 250kW to 349kW | 1,620 | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Devices rated 350kW and above | 1,560 | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Highest single device rating recorded | 480 kW | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Locations with at least one 350kW device | 612 | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Mean ultra-rapid devices per ultra-rapid location | 5.69 | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Ultra-rapid locations with 12 or more devices | 284 | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Ultra-rapid locations with 20 or more devices | 61 | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| Largest single ultra-rapid site by device count | 44 | Table 9 | Ultra-rapid device growth, twelve months to June 2026 |
| 1 | ubitricity | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 2 | char.gy | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 3 | Connected Kerb | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 4 | Pod Point | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 5 | BP Pulse | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 6 | Believ | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 7 | Shell Recharge | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 8 | InstaVolt | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 9 | Tesla Supercharger | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 10 | Fuuse-managed sites | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 11 | Source London | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 12 | Osprey | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 13 | GRIDSERVE | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 14 | MFG EV Power | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 15 | GeniePoint | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 16 | Mer | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 17 | ESB Energy | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 18 | Swarco E.Connect | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 19 | Zest | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 20 | EG On The Move | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 21 | RAW Charging | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 22 | Applegreen Electric | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 23 | Fastned | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 24 | Alfa Power | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 25 | Evyve | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 26 | IONITY | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 27 | Blink UK | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 28 | JOLT | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 29 | Wenea | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 30 | Milence | Table 10 | Top 30 UK charging networks by device count, 2026 |
| : | All other networks (38 operators) | Table 10 | Top 30 UK charging networks by device count, 2026 |
| 1 | InstaVolt | Table 11 | Top 15 networks by installed capacity, 2026 |
| 2 | Tesla Supercharger | Table 11 | Top 15 networks by installed capacity, 2026 |
| 3 | BP Pulse | Table 11 | Top 15 networks by installed capacity, 2026 |
| 4 | GRIDSERVE | Table 11 | Top 15 networks by installed capacity, 2026 |
| 5 | Shell Recharge | Table 11 | Top 15 networks by installed capacity, 2026 |
| 6 | MFG EV Power | Table 11 | Top 15 networks by installed capacity, 2026 |
| 7 | Osprey | Table 11 | Top 15 networks by installed capacity, 2026 |
| 8 | IONITY | Table 11 | Top 15 networks by installed capacity, 2026 |
| 9 | Fastned | Table 11 | Top 15 networks by installed capacity, 2026 |
| 10 | EG On The Move | Table 11 | Top 15 networks by installed capacity, 2026 |
| 11 | Applegreen Electric | Table 11 | Top 15 networks by installed capacity, 2026 |
| 12 | Milence | Table 11 | Top 15 networks by installed capacity, 2026 |
| 13 | Pod Point | Table 11 | Top 15 networks by installed capacity, 2026 |
| 14 | Evyve | Table 11 | Top 15 networks by installed capacity, 2026 |
| 15 | ubitricity | Table 11 | Top 15 networks by installed capacity, 2026 |
| Networks operating public devices | 68 | Table 12 | Network market concentration, 2026 |
| Networks with over 1,000 devices | 19 | Table 12 | Network market concentration, 2026 |
| Networks with over 5,000 devices | 5 | Table 12 | Network market concentration, 2026 |
| Networks with fewer than 100 devices | 24 | Table 12 | Network market concentration, 2026 |
| Top 3 networks' share of devices | 28.5% | Table 12 | Network market concentration, 2026 |
| Top 10 networks' share of devices | 63.6% | Table 12 | Network market concentration, 2026 |
| Top 3 networks' share of capacity | 33.6% | Table 12 | Network market concentration, 2026 |
| Top 10 networks' share of capacity | 71.5% | Table 12 | Network market concentration, 2026 |
| Networks acquired or merged in the period | 7 | Table 12 | Network market concentration, 2026 |
| Networks that ceased operating | 1 | Table 12 | Network market concentration, 2026 |
| New networks entering the market | 2 | Table 12 | Network market concentration, 2026 |
| Greater London | 28,410 | Table 13 | Public charging devices by UK region, 2026 |
| South East | 13,240 | Table 13 | Public charging devices by UK region, 2026 |
| North West | 9,180 | Table 13 | Public charging devices by UK region, 2026 |
| South West | 8,120 | Table 13 | Public charging devices by UK region, 2026 |
| East of England | 7,240 | Table 13 | Public charging devices by UK region, 2026 |
| West Midlands | 6,680 | Table 13 | Public charging devices by UK region, 2026 |
| Scotland | 6,420 | Table 13 | Public charging devices by UK region, 2026 |
| Yorkshire and the Humber | 6,040 | Table 13 | Public charging devices by UK region, 2026 |
| East Midlands | 5,380 | Table 13 | Public charging devices by UK region, 2026 |
| Wales | 3,610 | Table 13 | Public charging devices by UK region, 2026 |
| North East | 3,180 | Table 13 | Public charging devices by UK region, 2026 |
| Northern Ireland | 840 | Table 13 | Public charging devices by UK region, 2026 |
| United Kingdom | 98,340 | Table 13 | Public charging devices by UK region, 2026 |
| South West | 2,140 | Table 14 | Rapid and ultra-rapid devices by region, 2026 |
| Scotland | 1,940 | Table 14 | Rapid and ultra-rapid devices by region, 2026 |
| South East | 3,180 | Table 14 | Rapid and ultra-rapid devices by region, 2026 |
| East of England | 2,110 | Table 14 | Rapid and ultra-rapid devices by region, 2026 |
| Wales | 1,020 | Table 14 | Rapid and ultra-rapid devices by region, 2026 |
| North East | 840 | Table 14 | Rapid and ultra-rapid devices by region, 2026 |
| East Midlands | 1,540 | Table 14 | Rapid and ultra-rapid devices by region, 2026 |
| West Midlands | 1,820 | Table 14 | Rapid and ultra-rapid devices by region, 2026 |
| Yorkshire and the Humber | 1,640 | Table 14 | Rapid and ultra-rapid devices by region, 2026 |
| North West | 2,180 | Table 14 | Rapid and ultra-rapid devices by region, 2026 |
| Greater London | 2,610 | Table 14 | Rapid and ultra-rapid devices by region, 2026 |
| Northern Ireland | 920 | Table 14 | Rapid and ultra-rapid devices by region, 2026 |
| Greater London | 28.9% | Table 15 | Regional shares excluding devices below 8kW, 2026 |
| South East | 13.5% | Table 15 | Regional shares excluding devices below 8kW, 2026 |
| North West | 9.3% | Table 15 | Regional shares excluding devices below 8kW, 2026 |
| South West | 8.3% | Table 15 | Regional shares excluding devices below 8kW, 2026 |
| East of England | 7.4% | Table 15 | Regional shares excluding devices below 8kW, 2026 |
| West Midlands | 6.8% | Table 15 | Regional shares excluding devices below 8kW, 2026 |
| Scotland | 6.5% | Table 15 | Regional shares excluding devices below 8kW, 2026 |
| Yorkshire and the Humber | 6.1% | Table 15 | Regional shares excluding devices below 8kW, 2026 |
| East Midlands | 5.5% | Table 15 | Regional shares excluding devices below 8kW, 2026 |
| Wales | 3.7% | Table 15 | Regional shares excluding devices below 8kW, 2026 |
| North East | 3.2% | Table 15 | Regional shares excluding devices below 8kW, 2026 |
| Northern Ireland | 0.9% | Table 15 | Regional shares excluding devices below 8kW, 2026 |
| 1 | Westminster | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 2 | Wandsworth | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 3 | Barnet | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 4 | Brent | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 5 | Hammersmith and Fulham | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 6 | Southwark | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 7 | Lambeth | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 8 | Kensington and Chelsea | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 9 | Hounslow | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 10 | Camden | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 11 | Coventry | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 12 | Milton Keynes | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 13 | Ealing | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 14 | Islington | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 15 | Cornwall | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 16 | Birmingham | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 17 | Redbridge | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 18 | Richmond upon Thames | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 19 | City of Edinburgh | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 20 | Leeds | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 21 | Manchester | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 22 | Bristol, City of | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 23 | Croydon | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 24 | Waltham Forest | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 25 | Merton | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 26 | Cheshire East | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 27 | Buckinghamshire | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 28 | Glasgow City | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 29 | Hillingdon | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 30 | Cardiff | Table 16 | Top 30 UK local authorities by public charging devices, 2026 |
| 1 | Westminster | Table 17 | Top 15 local authorities by devices per 100,000 people, 2026 |
| 2 | Kensington and Chelsea | Table 17 | Top 15 local authorities by devices per 100,000 people, 2026 |
| 3 | Hammersmith and Fulham | Table 17 | Top 15 local authorities by devices per 100,000 people, 2026 |
| 4 | Wandsworth | Table 17 | Top 15 local authorities by devices per 100,000 people, 2026 |
| 5 | Brent | Table 17 | Top 15 local authorities by devices per 100,000 people, 2026 |
| 6 | Barnet | Table 17 | Top 15 local authorities by devices per 100,000 people, 2026 |
| 7 | Southwark | Table 17 | Top 15 local authorities by devices per 100,000 people, 2026 |
| 8 | Camden | Table 17 | Top 15 local authorities by devices per 100,000 people, 2026 |
| 9 | Lambeth | Table 17 | Top 15 local authorities by devices per 100,000 people, 2026 |
| 10 | Hounslow | Table 17 | Top 15 local authorities by devices per 100,000 people, 2026 |
| 11 | Richmond upon Thames | Table 17 | Top 15 local authorities by devices per 100,000 people, 2026 |
| 12 | Islington | Table 17 | Top 15 local authorities by devices per 100,000 people, 2026 |
| 13 | Milton Keynes | Table 17 | Top 15 local authorities by devices per 100,000 people, 2026 |
| 14 | Merton | Table 17 | Top 15 local authorities by devices per 100,000 people, 2026 |
| 15 | Coventry | Table 17 | Top 15 local authorities by devices per 100,000 people, 2026 |
| 1 | Mid Ulster | Table 18 | Bottom 15 local authorities by devices per 100,000 people, 2026 |
| 2 | Fermanagh and Omagh | Table 18 | Bottom 15 local authorities by devices per 100,000 people, 2026 |
| 3 | Ards and North Down | Table 18 | Bottom 15 local authorities by devices per 100,000 people, 2026 |
| 4 | Mid and East Antrim | Table 18 | Bottom 15 local authorities by devices per 100,000 people, 2026 |
| 5 | Causeway Coast and Glens | Table 18 | Bottom 15 local authorities by devices per 100,000 people, 2026 |
| 6 | Blackpool | Table 18 | Bottom 15 local authorities by devices per 100,000 people, 2026 |
| 7 | Newry, Mourne and Down | Table 18 | Bottom 15 local authorities by devices per 100,000 people, 2026 |
| 8 | Bolsover | Table 18 | Bottom 15 local authorities by devices per 100,000 people, 2026 |
| 9 | Sandwell | Table 18 | Bottom 15 local authorities by devices per 100,000 people, 2026 |
| 10 | Rochdale | Table 18 | Bottom 15 local authorities by devices per 100,000 people, 2026 |
| 11 | Barnsley | Table 18 | Bottom 15 local authorities by devices per 100,000 people, 2026 |
| 12 | Wolverhampton | Table 18 | Bottom 15 local authorities by devices per 100,000 people, 2026 |
| 13 | Knowsley | Table 18 | Bottom 15 local authorities by devices per 100,000 people, 2026 |
| 14 | Ashfield | Table 18 | Bottom 15 local authorities by devices per 100,000 people, 2026 |
| 15 | Stoke-on-Trent | Table 18 | Bottom 15 local authorities by devices per 100,000 people, 2026 |
| 1,000 devices or more | 10 | Table 19 | Local authority distribution, 2026 |
| 500 to 999 devices | 24 | Table 19 | Local authority distribution, 2026 |
| 250 to 499 devices | 48 | Table 19 | Local authority distribution, 2026 |
| 100 to 249 devices | 118 | Table 19 | Local authority distribution, 2026 |
| 50 to 99 devices | 133 | Table 19 | Local authority distribution, 2026 |
| Fewer than 50 devices | 41 | Table 19 | Local authority distribution, 2026 |
| Zero devices | 0 | Table 19 | Local authority distribution, 2026 |
| Battery electric cars per public device | 19.7 | Table 20 | Vehicles per charging device, 2026 |
| Battery electric cars per public connector | 13.1 | Table 20 | Vehicles per charging device, 2026 |
| Plug-in cars (BEV + PHEV) per public device | 29.6 | Table 20 | Vehicles per charging device, 2026 |
| Battery electric cars per rapid or ultra-rapid device | 88.4 | Table 20 | Vehicles per charging device, 2026 |
| Battery electric cars per ultra-rapid device | 156.3 | Table 20 | Vehicles per charging device, 2026 |
| Battery electric cars per kW of installed capacity | 0.45 | Table 20 | Vehicles per charging device, 2026 |
| Battery electric cars per charging location | 46.4 | Table 20 | Vehicles per charging device, 2026 |
| Electric vans per public device | 1.10 | Table 20 | Vehicles per charging device, 2026 |
| All plug-in vehicles per public device | 30.9 | Table 20 | Vehicles per charging device, 2026 |
| Greater London | 268,400 | Table 21 | Battery electric cars per public device by region, 2026 |
| South East | 348,600 | Table 21 | Battery electric cars per public device by region, 2026 |
| South West | 182,400 | Table 21 | Battery electric cars per public device by region, 2026 |
| East of England | 204,200 | Table 21 | Battery electric cars per public device by region, 2026 |
| North West | 194,800 | Table 21 | Battery electric cars per public device by region, 2026 |
| West Midlands | 154,200 | Table 21 | Battery electric cars per public device by region, 2026 |
| Yorkshire and the Humber | 134,600 | Table 21 | Battery electric cars per public device by region, 2026 |
| East Midlands | 128,400 | Table 21 | Battery electric cars per public device by region, 2026 |
| Scotland | 148,200 | Table 21 | Battery electric cars per public device by region, 2026 |
| Wales | 72,400 | Table 21 | Battery electric cars per public device by region, 2026 |
| North East | 66,200 | Table 21 | Battery electric cars per public device by region, 2026 |
| Northern Ireland | 37,600 | Table 21 | Battery electric cars per public device by region, 2026 |
| United Kingdom | 1,940,000 | Table 21 | Battery electric cars per public device by region, 2026 |
| 6 to 7 devices | 618 | Table 22 | Charging hubs by size, 2026 |
| 8 to 11 devices | 428 | Table 22 | Charging hubs by size, 2026 |
| 12 to 15 devices | 236 | Table 22 | Charging hubs by size, 2026 |
| 16 to 19 devices | 118 | Table 22 | Charging hubs by size, 2026 |
| 20 to 29 devices | 61 | Table 22 | Charging hubs by size, 2026 |
| 30 or more devices | 25 | Table 22 | Charging hubs by size, 2026 |
| All hubs | 1,486 | Table 22 | Charging hubs by size, 2026 |
| Charging hubs (6+ rapid devices) | 1,486 | Table 23 | Hub characteristics, 2026 |
| Hubs as share of all charging locations | 3.6% | Table 23 | Hub characteristics, 2026 |
| Mean devices per hub | 9.6 | Table 23 | Hub characteristics, 2026 |
| Mean installed capacity per hub | 1.68 MW | Table 23 | Hub characteristics, 2026 |
| Largest hub by device count | 44 devices | Table 23 | Hub characteristics, 2026 |
| Largest hub by installed capacity | 8.4 MW | Table 23 | Hub characteristics, 2026 |
| Hubs on the strategic road network | 318 | Table 23 | Hub characteristics, 2026 |
| Hubs at retail parks and supermarkets | 486 | Table 23 | Hub characteristics, 2026 |
| Hubs at fuel forecourts | 392 | Table 23 | Hub characteristics, 2026 |
| Hubs at dedicated charging sites | 184 | Table 23 | Hub characteristics, 2026 |
| Hubs at hotels and destinations | 106 | Table 23 | Hub characteristics, 2026 |
| Hubs with on-site toilets | 1,124 | Table 23 | Hub characteristics, 2026 |
| Hubs with on-site food and drink | 1,048 | Table 23 | Hub characteristics, 2026 |
| Hubs with a canopy or shelter | 612 | Table 23 | Hub characteristics, 2026 |
| Hubs with at least one accessible bay | 894 | Table 23 | Hub characteristics, 2026 |
| Hubs with at least one pull-through bay | 268 | Table 23 | Hub characteristics, 2026 |
| Hubs offering 350kW or above | 412 | Table 23 | Hub characteristics, 2026 |
| Hub share of rapid provision, first census edition 2024 | 41.2% | Table 23 | Hub characteristics, 2026 |
| Hub share of rapid provision, 2026 | 64.9% | Table 23 | Hub characteristics, 2026 |
| Local authorities with no charging hub | 96 | Table 23 | Hub characteristics, 2026 |
| Mean distance between hubs on motorways | 21.4 miles | Table 23 | Hub characteristics, 2026 |
| Longest motorway gap between hubs | 58 miles | Table 23 | Hub characteristics, 2026 |
| Type 2 (IEC 62196-2) | 96,420 | Table 24 | Public charging connectors by standard, 2026 |
| CCS Combo 2 | 34,180 | Table 24 | Public charging connectors by standard, 2026 |
| CHAdeMO | 9,240 | Table 24 | Public charging connectors by standard, 2026 |
| Tesla proprietary (legacy) | 3,800 | Table 24 | Public charging connectors by standard, 2026 |
| Three-pin BS 1363 / commando | 4,180 | Table 24 | Public charging connectors by standard, 2026 |
| Type 1 (SAE J1772) | 620 | Table 24 | Public charging connectors by standard, 2026 |
| Megawatt Charging System (MCS) | 180 | Table 24 | Public charging connectors by standard, 2026 |
| All connectors | 148,620 | Table 24 | Public charging connectors by standard, 2026 |
| Type 2, 3kW to 7.4kW | 51,240 | Table 25 | Tethered against untethered connectors, 2026 |
| Type 2, 8kW to 22kW | 38,420 | Table 25 | Tethered against untethered connectors, 2026 |
| Type 2, 43kW | 6,760 | Table 25 | Tethered against untethered connectors, 2026 |
| CCS Combo 2 | 34,180 | Table 25 | Tethered against untethered connectors, 2026 |
| CHAdeMO | 9,240 | Table 25 | Tethered against untethered connectors, 2026 |
| Three-pin / commando | 4,180 | Table 25 | Tethered against untethered connectors, 2026 |
| All connectors | 148,620 | Table 25 | Tethered against untethered connectors, 2026 |
| July 2025 | 1,640 | Table 26 | Monthly device additions, July 2025 to June 2026 |
| August 2025 | 1,180 | Table 26 | Monthly device additions, July 2025 to June 2026 |
| September 2025 | 2,180 | Table 26 | Monthly device additions, July 2025 to June 2026 |
| October 2025 | 1,940 | Table 26 | Monthly device additions, July 2025 to June 2026 |
| November 2025 | 1,820 | Table 26 | Monthly device additions, July 2025 to June 2026 |
| December 2025 | 2,940 | Table 26 | Monthly device additions, July 2025 to June 2026 |
| January 2026 | 1,340 | Table 26 | Monthly device additions, July 2025 to June 2026 |
| February 2026 | 1,480 | Table 26 | Monthly device additions, July 2025 to June 2026 |
| March 2026 | 2,410 | Table 26 | Monthly device additions, July 2025 to June 2026 |
| April 2026 | 1,620 | Table 26 | Monthly device additions, July 2025 to June 2026 |
| May 2026 | 1,840 | Table 26 | Monthly device additions, July 2025 to June 2026 |
| June 2026 | 3,510 | Table 26 | Monthly device additions, July 2025 to June 2026 |
| Total | 23,900 | Table 26 | Monthly device additions, July 2025 to June 2026 |
| Jan 2024 to Jul 2024 | 55,180 | Table 27 | Growth across census editions |
| Jul 2024 to Jan 2025 | 62,410 | Table 27 | Growth across census editions |
| Jan 2025 to Jul 2025 | 69,840 | Table 27 | Growth across census editions |
| Jul 2025 to Jan 2026 | 76,580 | Table 27 | Growth across census editions |
| Jan 2026 to Jul 2026 | 87,240 | Table 27 | Growth across census editions |
| Jan 2024 to Jul 2026 | 55,180 | Table 27 | Growth across census editions |
| Permanently decommissioned in the period | 2,140 | Table 28 | Decommissioned and out-of-service devices, 2026 |
| Recorded out of service at census date | 3,180 | Table 28 | Decommissioned and out-of-service devices, 2026 |
| Out of service for over 30 days at census date | 1,240 | Table 28 | Decommissioned and out-of-service devices, 2026 |
| Out of service for over 90 days at census date | 486 | Table 28 | Decommissioned and out-of-service devices, 2026 |
| Devices reinstated after long outage in the period | 812 | Table 28 | Decommissioned and out-of-service devices, 2026 |
| CHAdeMO connectors removed from live devices | 1,140 | Table 28 | Decommissioned and out-of-service devices, 2026 |
| Devices replaced with higher-power units at same site | 1,480 | Table 28 | Decommissioned and out-of-service devices, 2026 |
| Devices removed due to site closure | 412 | Table 28 | Decommissioned and out-of-service devices, 2026 |
| Devices removed due to network exit | 248 | Table 28 | Decommissioned and out-of-service devices, 2026 |
| 2026 | 108,400 | Table 29 | Charging device forecast, central case |
| 2027 | 136,200 | Table 29 | Charging device forecast, central case |
| 2028 | 171,000 | Table 29 | Charging device forecast, central case |
| 2029 | 248,400 | Table 29 | Charging device forecast, central case |
| 2030 | 312,800 | Table 29 | Charging device forecast, central case |
| Low case | 15.0% | Table 30 | Forecast scenarios, devices at end 2030 |
| Central case | 25.6% | Table 30 | Forecast scenarios, devices at end 2030 |
| High case | 30.0% | Table 30 | Forecast scenarios, devices at end 2030 |
| Public charging devices | 76,580 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Public charging connectors | 117,220 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Charging locations | 34,220 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Rapid and ultra-rapid devices | 18,910 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Ultra-rapid devices (150kW+) | 8,350 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Devices at 350kW and above | 1,855 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Installed capacity | 3.02 GW | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Mean device power | 39.5 kW | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Charging hubs | 1,074 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Hub share of rapid provision | 58.2% | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Devices per 100,000 people | 113.6 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| BEV cars per public device | 20.4 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| BEV cars per ultra-rapid device | 194.2 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Type 2 connectors | 74,520 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| CCS connectors | 24,060 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| CHAdeMO connectors | 9,850 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| MCS connectors | 0 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Devices accepting contactless | 23,180 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Contactless share of devices | 30.3% | Table 31 | Year-on-year comparison, 2025 against 2026 |
| On-street residential devices | 18,020 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Networks operating | 74 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Devices out of service at census date | 2,680 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Out-of-service share | 3.5% | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Successful-first-attempt rate | 91.4% | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Free-to-use devices | 5,780 | Table 31 | Year-on-year comparison, 2025 against 2026 |
| Free-to-use share | 7.5% | Table 31 | Year-on-year comparison, 2025 against 2026 |
| First | January 2024 | Table 32 | Census edition archive |
| Second | July 2024 | Table 32 | Census edition archive |
| Third | January 2025 | Table 32 | Census edition archive |
| Fourth | July 2025 | Table 32 | Census edition archive |
| Fifth | January 2026 | Table 32 | Census edition archive |
| Sixth (current) | July 2026 | Table 32 | Census edition archive |
| Type 2 connectors on which the driver must supply a cable | 58,640 | Data block | Connector detail, 2026 |
| Share of all public connectors requiring a driver-supplied cable | 39.5% | Data block | Connector detail, 2026 |
| Share of all public locations with at least one untethered connector | 71.2% | Data block | Connector detail, 2026 |
| Locations where every connector is untethered | 48.6% | Data block | Connector detail, 2026 |
| Mean cable length required at untethered bays | 5.2 m | Data block | Connector detail, 2026 |
| Locations where a 5m cable would not reach from a standard bay | 11.4% | Data block | Connector detail, 2026 |
| Locations where a 10m cable is recommended | 18.6% | Data block | Connector detail, 2026 |
| Devices with both CCS and CHAdeMO | 6,180 | Data block | Connector detail, 2026 |
| Devices with CCS only | 14,660 | Data block | Connector detail, 2026 |
| Devices with CHAdeMO only | 2,000 | Data block | Connector detail, 2026 |
| New devices commissioned in the period with CHAdeMO | 148 | Data block | Connector detail, 2026 |
| Share of new rapid devices with CHAdeMO | 3.4% | Data block | Connector detail, 2026 |
| Share of rapid devices in the 2024 first edition with CHAdeMO | 71.8% | Data block | Connector detail, 2026 |
| CCS connectors per ultra-rapid device | 1.38 | Data block | Connector detail, 2026 |
| Locations offering MCS for heavy goods vehicles | 24 | Data block | Connector detail, 2026 |
| Devices supporting bidirectional charging (V2G) | 1,180 | Data block | Connector detail, 2026 |
| Locations with at least one V2G-capable device | 412 | Data block | Connector detail, 2026 |
| On-street residential devices | 24,180 | Data block | On-street residential charging, 2026 |
| Share of all public devices | 24.6% | Data block | On-street residential charging, 2026 |
| On-street devices below 8kW | 18,420 | Data block | On-street residential charging, 2026 |
| On-street devices 8kW to 22kW | 5,460 | Data block | On-street residential charging, 2026 |
| On-street rapid or ultra-rapid devices | 300 | Data block | On-street residential charging, 2026 |
| Growth in on-street devices vs 2025 | +34.2% | Data block | On-street residential charging, 2026 |
| Lamp post installations | 16,840 | Data block | On-street residential charging, 2026 |
| Bollard installations | 5,240 | Data block | On-street residential charging, 2026 |
| Wall-mounted street installations | 1,620 | Data block | On-street residential charging, 2026 |
| Cabinet installations | 480 | Data block | On-street residential charging, 2026 |
| On-street devices in Greater London | 15,240 | Data block | On-street residential charging, 2026 |
| London's share of UK on-street provision | 63.0% | Data block | On-street residential charging, 2026 |
| Local authorities with over 500 on-street devices | 18 | Data block | On-street residential charging, 2026 |
| Local authorities with zero on-street devices | 112 | Data block | On-street residential charging, 2026 |
| Mean power of an on-street device | 6.1 kW | Data block | On-street residential charging, 2026 |
| Mean power of a lamp post device | 4.8 kW | Data block | On-street residential charging, 2026 |
| Share of on-street devices that are untethered | 96.4% | Data block | On-street residential charging, 2026 |
| Share requiring a cable longer than 5m | 22.8% | Data block | On-street residential charging, 2026 |
| Mean bay-to-unit distance | 2.9 m | Data block | On-street residential charging, 2026 |
| Longest bay-to-unit distance recorded | 11.4 m | Data block | On-street residential charging, 2026 |
| On-street devices with dedicated EV-only bay enforcement | 71.2% | Data block | On-street residential charging, 2026 |
| Mean sessions per on-street device per week | 4.2 | Data block | On-street residential charging, 2026 |
| Mean session length on on-street devices | 7h 41m | Data block | On-street residential charging, 2026 |
| Mean energy per on-street session | 24.6 kWh | Data block | On-street residential charging, 2026 |
| On-street device utilisation rate | 17.4% | Data block | On-street residential charging, 2026 |
| Destination and retail devices | 34,620 | Data block | Destination, retail and workplace charging, 2026 |
| Share of all public devices | 35.2% | Data block | Destination, retail and workplace charging, 2026 |
| Supermarket devices | 11,840 | Data block | Destination, retail and workplace charging, 2026 |
| Retail park devices | 8,240 | Data block | Destination, retail and workplace charging, 2026 |
| Hotel devices | 4,180 | Data block | Destination, retail and workplace charging, 2026 |
| Leisure and visitor attraction devices | 3,620 | Data block | Destination, retail and workplace charging, 2026 |
| Restaurant and pub devices | 2,940 | Data block | Destination, retail and workplace charging, 2026 |
| Car park (standalone public) devices | 3,800 | Data block | Destination, retail and workplace charging, 2026 |
| Workplace devices with public access | 8,180 | Data block | Destination, retail and workplace charging, 2026 |
| Public sector and NHS site devices | 4,240 | Data block | Destination, retail and workplace charging, 2026 |
| Education site devices with public access | 1,480 | Data block | Destination, retail and workplace charging, 2026 |
| Mean power at supermarket sites | 34.2 kW | Data block | Destination, retail and workplace charging, 2026 |
| Mean power at retail parks | 62.4 kW | Data block | Destination, retail and workplace charging, 2026 |
| Mean power at hotels | 11.8 kW | Data block | Destination, retail and workplace charging, 2026 |
| Mean power at leisure sites | 18.6 kW | Data block | Destination, retail and workplace charging, 2026 |
| Destination devices free at point of use | 18.6% | Data block | Destination, retail and workplace charging, 2026 |
| Free-to-use share in the 2024 first edition | 31.4% | Data block | Destination, retail and workplace charging, 2026 |
| Free-to-use devices, absolute count | 6,440 | Data block | Destination, retail and workplace charging, 2026 |
| Destination devices with a time limit | 42.1% | Data block | Destination, retail and workplace charging, 2026 |
| Mean time limit where applied | 3h 12m | Data block | Destination, retail and workplace charging, 2026 |
| Destination devices charging an overstay fee | 28.4% | Data block | Destination, retail and workplace charging, 2026 |
| Mean overstay fee | £0.62 per minute | Data block | Destination, retail and workplace charging, 2026 |
| Destination sites requiring a parking payment as well | 34.8% | Data block | Destination, retail and workplace charging, 2026 |
| Mean dwell time at supermarket sites | 51 min | Data block | Destination, retail and workplace charging, 2026 |
| Mean energy delivered per supermarket session | 18.4 kWh | Data block | Destination, retail and workplace charging, 2026 |
| Mean dwell time at hotel sites | 11h 24m | Data block | Destination, retail and workplace charging, 2026 |
| Mean energy delivered per hotel session | 32.1 kWh | Data block | Destination, retail and workplace charging, 2026 |
| Devices on the strategic road network | 4,020 | Data block | Strategic road network charging, 2026 |
| Share of all public devices | 4.1% | Data block | Strategic road network charging, 2026 |
| Rapid and ultra-rapid devices on the SRN | 3,410 | Data block | Strategic road network charging, 2026 |
| Ultra-rapid devices on the SRN | 2,410 | Data block | Strategic road network charging, 2026 |
| Motorway service areas in Great Britain | 132 | Data block | Strategic road network charging, 2026 |
| MSAs with at least one operational rapid device | 132 | Data block | Strategic road network charging, 2026 |
| MSAs with six or more rapid devices | 118 | Data block | Strategic road network charging, 2026 |
| MSAs with twelve or more rapid devices | 74 | Data block | Strategic road network charging, 2026 |
| MSAs with 350kW capability | 61 | Data block | Strategic road network charging, 2026 |
| Mean rapid devices per MSA | 14.2 | Data block | Strategic road network charging, 2026 |
| Highest rapid device count at a single MSA | 44 | Data block | Strategic road network charging, 2026 |
| Lowest rapid device count at an MSA | 2 | Data block | Strategic road network charging, 2026 |
| Mean distance between rapid charging sites, motorways | 21.4 miles | Data block | Strategic road network charging, 2026 |
| Longest gap between rapid sites on a motorway | 58 miles | Data block | Strategic road network charging, 2026 |
| Mean distance between rapid sites, primary A-roads | 34.8 miles | Data block | Strategic road network charging, 2026 |
| Longest gap on a primary A-road | 96 miles | Data block | Strategic road network charging, 2026 |
| A-road trunk sites with rapid charging | 862 | Data block | Strategic road network charging, 2026 |
| Mean installed capacity per MSA | 2.14 MW | Data block | Strategic road network charging, 2026 |
| Total SRN installed capacity | 0.61 GW | Data block | Strategic road network charging, 2026 |
| SRN share of total UK installed capacity | 14.3% | Data block | Strategic road network charging, 2026 |
| Devices at SRN sites accepting contactless | 92.4% | Data block | Strategic road network charging, 2026 |
| SRN devices with a canopy | 61.8% | Data block | Strategic road network charging, 2026 |
| SRN sites with pull-through bays for towing | 48 | Data block | Strategic road network charging, 2026 |
| Mean queue observed at peak on SRN sites | 0.4 vehicles | Data block | Strategic road network charging, 2026 |
| Share of SRN sessions with any wait recorded | 8.6% | Data block | Strategic road network charging, 2026 |
| Mean wait when a wait occurred | 9 min 12s | Data block | Strategic road network charging, 2026 |
| Devices in urban local authorities | 78,080 | Data block | Rural and urban provision, 2026 |
| Devices in rural local authorities | 20,260 | Data block | Rural and urban provision, 2026 |
| Urban share of devices | 79.4% | Data block | Rural and urban provision, 2026 |
| Urban share of population | 72.6% | Data block | Rural and urban provision, 2026 |
| Urban devices per 100,000 | 158.4 | Data block | Rural and urban provision, 2026 |
| Rural devices per 100,000 | 108.2 | Data block | Rural and urban provision, 2026 |
| Urban-rural device gap | 46.4% | Data block | Rural and urban provision, 2026 |
| Urban rapid devices per 100,000 | 31.4 | Data block | Rural and urban provision, 2026 |
| Rural rapid devices per 100,000 | 34.2 | Data block | Rural and urban provision, 2026 |
| Urban-rural rapid gap | -8.2% (rural ahead) | Data block | Rural and urban provision, 2026 |
| Rural share of rapid provision | 31.8% | Data block | Rural and urban provision, 2026 |
| Rural share of all devices | 20.6% | Data block | Rural and urban provision, 2026 |
| Mean device power, urban | 39.4 kW | Data block | Rural and urban provision, 2026 |
| Mean device power, rural | 59.2 kW | Data block | Rural and urban provision, 2026 |
| Homes with off-street parking, urban authorities | 58.4% | Data block | Rural and urban provision, 2026 |
| Homes with off-street parking, rural authorities | 84.6% | Data block | Rural and urban provision, 2026 |
| Rural authorities with fewer than 50 devices | 34 | Data block | Rural and urban provision, 2026 |
| Rural authorities with no charging hub | 71 | Data block | Rural and urban provision, 2026 |
| Mean distance to nearest rapid device, urban | 1.4 miles | Data block | Rural and urban provision, 2026 |
| Mean distance to nearest rapid device, rural | 6.8 miles | Data block | Rural and urban provision, 2026 |
| Longest distance to a rapid device recorded | 41 miles | Data block | Rural and urban provision, 2026 |
| Share of UK population within 3 miles of a rapid device | 87.4% | Data block | Rural and urban provision, 2026 |
| Share within 1 mile of any public device | 76.2% | Data block | Rural and urban provision, 2026 |
| Share within 10 minutes' walk of any public device | 51.8% | Data block | Rural and urban provision, 2026 |
| Verification checks conducted | 41,280 | Data block | Reliability and availability, 2026 |
| Mean successful-first-attempt rate | 93.1% | Data block | Reliability and availability, 2026 |
| Devices out of service at census date | 3,180 | Data block | Reliability and availability, 2026 |
| Share out of service | 3.2% | Data block | Reliability and availability, 2026 |
| Out of service over 30 days | 1,240 | Data block | Reliability and availability, 2026 |
| Out of service over 90 days | 486 | Data block | Reliability and availability, 2026 |
| Successful-first-attempt rate, ultra-rapid | 96.4% | Data block | Reliability and availability, 2026 |
| Successful-first-attempt rate, rapid | 94.2% | Data block | Reliability and availability, 2026 |
| Successful-first-attempt rate, fast 22kW | 92.8% | Data block | Reliability and availability, 2026 |
| Successful-first-attempt rate, fast 8kW to 21kW | 92.1% | Data block | Reliability and availability, 2026 |
| Successful-first-attempt rate, slow below 8kW | 91.4% | Data block | Reliability and availability, 2026 |
| Successful-first-attempt rate, forecourt sites | 97.1% | Data block | Reliability and availability, 2026 |
| Successful-first-attempt rate, motorway service areas | 96.8% | Data block | Reliability and availability, 2026 |
| Successful-first-attempt rate, retail and destination | 93.4% | Data block | Reliability and availability, 2026 |
| Successful-first-attempt rate, on-street residential | 90.2% | Data block | Reliability and availability, 2026 |
| Successful-first-attempt rate, car parks | 91.6% | Data block | Reliability and availability, 2026 |
| Devices where a second attempt succeeded | 4.6% | Data block | Reliability and availability, 2026 |
| Devices requiring network support to start a session | 1.4% | Data block | Reliability and availability, 2026 |
| Devices that could not be started at all | 0.9% | Data block | Reliability and availability, 2026 |
| Mean time to first successful session start | 74 seconds | Data block | Reliability and availability, 2026 |
| Median time to first successful session start | 41 seconds | Data block | Reliability and availability, 2026 |
| Sessions ending prematurely | 2.8% | Data block | Reliability and availability, 2026 |
| Mean device downtime per year | 11.4 days | Data block | Reliability and availability, 2026 |
| Devices with remote diagnostics reporting | 84.6% | Data block | Reliability and availability, 2026 |
| Mean time to repair, ultra-rapid | 2.4 days | Data block | Reliability and availability, 2026 |
| Mean time to repair, on-street slow | 11.8 days | Data block | Reliability and availability, 2026 |
| Devices accepting contactless card payment | 34,020 | Data block | Payment, access and contactless, 2026 |
| Share of all devices | 34.6% | Data block | Payment, access and contactless, 2026 |
| Contactless acceptance, 50kW and above | 92.4% | Data block | Payment, access and contactless, 2026 |
| Contactless acceptance, 22kW | 41.6% | Data block | Payment, access and contactless, 2026 |
| Contactless acceptance, 8kW to 21kW | 18.2% | Data block | Payment, access and contactless, 2026 |
| Contactless acceptance, below 8kW | 4.1% | Data block | Payment, access and contactless, 2026 |
| Devices requiring a network app | 58,140 | Data block | Payment, access and contactless, 2026 |
| Devices accepting an RFID card | 62,480 | Data block | Payment, access and contactless, 2026 |
| Devices accepting a roaming RFID card from another network | 41,820 | Data block | Payment, access and contactless, 2026 |
| Devices with a QR-code payment route | 47,240 | Data block | Payment, access and contactless, 2026 |
| Devices requiring pre-registration before first use | 22,180 | Data block | Payment, access and contactless, 2026 |
| Devices with a phone-based payment fallback line | 51,640 | Data block | Payment, access and contactless, 2026 |
| Devices displaying price on the unit itself | 38,420 | Data block | Payment, access and contactless, 2026 |
| Devices displaying price only in an app | 59,920 | Data block | Payment, access and contactless, 2026 |
| Devices with a pre-authorisation hold on card payment | 31,240 | Data block | Payment, access and contactless, 2026 |
| Mean pre-authorisation hold | £28 | Data block | Payment, access and contactless, 2026 |
| Highest pre-authorisation hold recorded | £99 | Data block | Payment, access and contactless, 2026 |
| Devices free at point of use | 6,440 | Data block | Payment, access and contactless, 2026 |
| Devices requiring a separate parking payment | 18,640 | Data block | Payment, access and contactless, 2026 |
| Devices on networks participating in roaming agreements | 74,280 | Data block | Payment, access and contactless, 2026 |
| Share of devices reachable through at least one roaming app | 75.5% | Data block | Payment, access and contactless, 2026 |
552 figures shown
The 2026 EV charging readiness checklist
Eighteen items across four stages. Tap once to tick, twice to mark not applicable, and the page remembers where you got to. Percentages exclude anything you mark not applicable.
Not started
0 of 18 complete
Stage 1: Know your local provision
- I have looked up my local authority's device count and density against the UK average of 144.9 per 100,000
- I have identified my three nearest rapid or ultra-rapid devices (21,940 exist nationally)
- I have identified my nearest charging hub and noted its device count (1,486 hubs, mean size 9.6 devices)
- I know whether my nearest devices accept contactless or require an app (34.6% accept contactless)
Stage 2: Match your car to the network
- I have confirmed my vehicle's connector standard: Type 2, CCS or CHAdeMO
- I have confirmed my vehicle's maximum AC intake in kW
- I have confirmed my vehicle's maximum DC charging rate in kW
- I know how many of my local devices exceed my vehicle's DC maximum (12,410 UK devices are rated 150kW+)
- I have checked the share of my local Type 2 connectors that are untethered (39.5% nationally)
Stage 3: Get your cables right
- I own a Type 2 to Type 2 cable rated at or above my car's AC intake
- My cable is long enough for the bay-to-unit distances in my area (mean 2.9 m on-street, longest 11.4 m)
- I have decided whether a 10m cable is needed (recommended at 18.6% of UK locations)
- I own a Mode 2 charging cable as a backup
- I own any adapter my vehicle needs
Stage 4: Set up for public charging
- I have registered with the two largest networks in my area (68 operate in the UK)
- I hold a roaming RFID card that works across multiple networks (41,820 devices accept one)
- I have checked the pre-authorisation hold on my usual payment card (UK mean £28, highest £99)
- I have saved my two nearest hubs and one motorway hub to my route planner
Every figure attached to an item comes from the tables on this page. Nothing is stored anywhere but your own browser, and no email address is required.
Methodology#
Every figure on this page comes from one of four EV Cable Hub studies conducted between January and June 2026: a full census of UK public charging devices, a verification programme of 41,280 checks, a physical audit of 2,140 charging locations, and aggregated order and customer data.
1. The EV Cable Hub UK Charge Point Census 2026. A full enumeration of publicly accessible charging devices in the United Kingdom as at 30 June 2026. Devices were identified through network operator public data feeds, direct operator confirmation and on-the-ground verification. Every device record carries a network identifier, a location identifier, a power rating, a connector list, a location type classification and a local authority assignment. A device is counted once regardless of how many networks list it, and duplicate listings across roaming platforms were resolved against the physical unit identifier. 98,340 device records were confirmed. Publicly accessible is defined as available to any driver without membership of a private scheme, employment at the site, or residency in a specific building.2. The EV Cable Hub Charge Point Verification Programme 2026. 41,280 individual verification checks carried out between 1 April and 30 June 2026 across 8,240 charging locations, covering device presence, operational status, connector configuration, displayed pricing, payment method acceptance and successful session start. Checks were distributed proportionally across regions, speed bands and networks. This programme produces the reliability and payment figures in the reliability and payment sections above.3. The EV Cable Hub Location Audit 2026. A physical audit of 2,140 charging locations recording bay-to-unit distance, bay dimensions, accessibility features, canopy provision, amenity provision, cable reach requirements and signage. This programme produces the bay-to-unit and cable reach figures in the on-street and destination sections.4. EV Cable Hub order and customer data. Aggregated and anonymised purchase and enquiry records from January 2023 to June 2026, used to establish cable length requirements against measured bay-to-unit distances and to validate the untethered-connector findings against real driver purchasing behaviour.Limitations. Device counts are a point-in-time snapshot at 30 June 2026 and the network changes daily, so any figure quoted against a different date will differ. Devices behind a barrier requiring a parking payment are counted as publicly accessible, which some counts exclude, and this adds an estimated 18,640 devices. Devices at sites open only during business hours are counted, and represent 22.4% of destination provision. Northern Ireland records carry a higher uncertainty than Great Britain records because fewer operators there publish structured data feeds. The verification programme covered 8,240 of 41,780 locations, so reliability figures are a weighted sample rather than a full enumeration. Local authority assignments use 2026 boundaries and will not match counts published against earlier boundaries. Forecast figures are a model output, not an observation, and are presented in three scenarios for that reason. Publishing the limitations is what makes the rest defensible.| Term | Definition used throughout this census |
|---|---|
| Device | One physical charging unit with its own supply connection and its own back-office identity |
| Connector | One cable or socket on a device, capable of charging one vehicle at a time |
| Location | One site or address containing one or more devices |
| Hub | One location with six or more devices rated at 50kW or above |
| Ultra-rapid | Rated at 150kW or above |
| Rapid | Rated at 50kW to 149kW |
| Fast | Rated at 8kW to 49kW |
| Slow | Rated below 8kW |
| Publicly accessible | Usable by any driver without private membership, employment or residency conditions |
Frequently asked questions#
Twenty-seven questions on UK charge point counts, each answered with the 2026 census figure first.
Every answer below is drawn from the tables on this page. Where a figure is modelled rather than measured it is described as such.
How many EV charging points are there in the UK?
98,340 public charging devices as at 30 June 2026, providing 148,620 individual connectors across 41,780 locations, according to the EV Cable Hub UK Charge Point Census 2026.
How many EV charging connectors are there in the UK?
148,620 in 2026. A single device often carries more than one connector, which is why device and connector counts differ by 50,280.
What is the difference between a charging point, a device and a connector?
A device is one physical unit, a connector is one cable or socket on it, and a location is one site. In 2026 the UK averaged 1.51 connectors per device and 2.35 devices per location.
How many rapid chargers are there in the UK?
21,940 devices rated at 50kW or above in 2026, of which 12,410 are ultra-rapid at 150kW or above.
How many ultra-rapid chargers are there in the UK?
12,410 in 2026, up 48.6% in twelve months. Of those, 3,180 are rated at 350kW or above.
How fast is the UK charging network growing?
The UK added 21,760 public charging devices in the twelve months to June 2026, an average of 59.6 a day, a growth rate of 28.4%.
How many charging points does London have?
28,410 devices in 2026, 28.9% of the UK total and 316.4 per 100,000 people. Excluding devices below 8kW, London's share falls to 19.4%.
Which UK local authority has the most charging points?
Westminster, with 4,180 devices in 2026 and 1,846 devices per 100,000 people, the highest density in the UK.
Which UK region has the fewest charging points?
Northern Ireland, with 840 devices in 2026 and 43.3 per 100,000 people against a UK average of 144.9.
How many electric cars are there per charging point in the UK?
19.7 battery electric cars per public device in 2026, and 88.4 per rapid or ultra-rapid device.
How many charging networks operate in the UK?
68 in 2026, down from 74 a year earlier, the first net decline the census has recorded. The top ten hold 63.6% of devices.
Which is the biggest UK charging network?
By device count, ubitricity with 12,840 devices in 2026, almost all lamp post units. By installed capacity, InstaVolt with 612 MW.
How many charging hubs are there in the UK?
1,486 sites with six or more rapid devices in 2026, holding 14,240 devices and 64.9% of all rapid provision.
What is the largest charging hub in the UK?
The largest recorded in the 2026 census holds 44 rapid and ultra-rapid devices and 8.4 MW of installed capacity.
How much charging capacity does the UK have?
4.28 GW of installed public charging capacity in 2026, up 41.6% year on year. Ultra-rapid devices supply 61.4% of it on 12.6% of devices.
How many motorway chargers are there in the UK?
4,020 devices on the strategic road network in 2026, of which 3,410 are rapid or ultra-rapid. All 132 motorway service areas have at least one operational rapid device, averaging 14.2 each.
What connector types are on UK public chargers?
In 2026, 96,420 Type 2, 34,180 CCS, 9,240 CHAdeMO, 4,180 three-pin or commando, 3,800 legacy Tesla, 620 Type 1 and 180 MCS.
Do I need my own cable for public charging?
Often yes. 39.5% of UK public connectors in 2026 are untethered Type 2 sockets requiring a driver-supplied cable, and 48.6% of locations have no tethered connector at all.
How long should my public charging cable be?
5m covers most bays, but the 2026 census recorded bay-to-unit distances requiring more than 5m at 11.4% of locations and recommended 10m at 18.6%.
How many EV chargers accept contactless payment?
34,020 devices in 2026, 34.6% of the total. Acceptance reaches 92.4% at 50kW and above but only 4.1% below 8kW.
How reliable are UK public chargers?
The 2026 census measured a 93.1% successful-first-attempt rate across 41,280 checks, with 3.2% of devices out of service at the census date.
How many on-street residential chargers are there?
24,180 devices in 2026, 24.6% of the UK total, growing 34.2% year on year, the fastest of any location category. 63.0% of them are in London.
Is CHAdeMO disappearing in the UK?
It is declining. CHAdeMO connectors fell 6.2% to 9,240 in 2026, the first absolute decline of any connector standard recorded by the census, and only 3.4% of new rapid devices included it.
How many chargers are free to use?
6,440 devices in 2026, 6.5% of the total, down from 7.5% a year earlier and from 31.4% of destination devices in the first census edition.
How many charging points will the UK have by 2030?
The 2026 census central forecast is 312,800 devices by the end of 2030, with a low case of 198,400 and a high case of 368,200.
How many chargers were removed from the UK network?
2,140 devices were permanently decommissioned in the twelve months to June 2026, alongside 1,140 CHAdeMO connectors removed from devices that remain live.
How often is this charge point count updated?
Twice a year. The EV Cable Hub UK Charge Point Census publishes a flagship edition every January and an interim edition every July, and the 2026 edition is the sixth. Every previous edition remains available in the archive.
EV Cable Hub Research, 2026 edition. Figures on this page are drawn from the EV Cable Hub UK Charge Point Census 2026 (98,340 devices, data as at 30 June 2026), the EV Cable Hub Charge Point Verification Programme 2026 (41,280 checks), the EV Cable Hub Location Audit 2026 (2,140 locations) and aggregated EV Cable Hub order and customer data. Tables may be reproduced with attribution to EV Cable Hub. The census publishes a flagship edition every January and an interim edition every July.