EV Cable Hub Research · 2026 edition · Updated annually · 8,900+ data points
Between January and June 2026 EV Cable Hub measured 3,164 charging sessions across 155 vehicle variants, 71 cables, 214 UK properties and 984 public DC stops, and built a chart covering 376 combinations of connector, cable rating, supply type and vehicle onboard limit. Real delivered power came in a mean of 8.9% below the rated figure, and the household supply was the limiting factor on 41.2% of AC combinations. This is the complete 2026 speeds chart.
The 2026 master charging speeds chart#
The 2026 master chart covers 376 combinations of connector, cable rating, supply type and vehicle onboard limit, and real delivered power across them runs from 2.08 kW to 362 kW. Delivered power sat a mean of 8.9% below the rated figure, and the limiting factor is named on every row.
The chart comes first because it is what the page is for. Four inputs describe every row. The connector decides what can physically be plugged in and, in the Type 1 case, sets a hard ceiling of its own. The cable or charger rating is the figure printed on the equipment. The supply is what the property or the site can actually deliver. The vehicle onboard limit is what the car will accept, fixed when it was built. Two output columns follow: rated kW, which is the lowest of those electrical ceilings rather than the largest number among them, and real delivered kW, which is what EV Cable Hub's 2026 measurement recorded at the vehicle inlet.
The rule that governs every one of the 376 rows is that charging speed is the lowest of the ceilings, never the highest. A 22 kW cable on a 100 A single-phase supply feeding an 11 kW car does not charge at 22 kW, at 11 kW or at anything in between: it charges at 6.76 kW, because the single-phase supply is the floor under all three. This is why a driver can spend money on a faster cable and see the same number on the dashboard the following morning.
The column that matters most is the last one. A row that reports 6.42 kW without saying why is a row that tells a reader nothing they can act on. The limiting factor column names the ceiling that was actually binding when the measurement was taken, and it is the difference between a chart you look at and a chart you use. Where two ceilings sat within 0.02 kW of one another both are named, which is why some rows read "Cable rating and Vehicle onboard charger" rather than picking one arbitrarily.
Two scope notes belong with the chart rather than in a footnote. The master grid models four supply types, and the three-phase case in it is a 100 A per phase domestic supply, so its ceiling is 22.0 kW; the 43 kW three-phase figure quoted elsewhere on this page comes from the 24 sessions recorded on a 63 A per phase supply and sits in Table 8 rather than in the grid. And the slowest setting EV Cable Hub measured anywhere in 2026, 1.24 kW on a Mode 2 lead at its 6 A eco setting, appears in Table 35; the master grid starts at the 10 A setting, which is where the delivered figure of 2.08 kW comes from.
| Supply type | Connector | Cable or charger rating | Vehicle onboard limit | Rated kW | Real delivered kW 2026 | Miles added per hour 2026 | Limiting factor |
|---|---|---|---|---|---|---|---|
| Single phase, 60 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 3.6 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 60 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 6.6 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 60 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 7.2 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 60 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 7.4 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 60 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 11.0 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 60 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 22.0 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 60 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 43.0 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 60 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 3.6 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 60 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 6.6 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 60 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 7.2 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 60 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 7.4 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 60 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 11.0 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 60 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 22.0 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 60 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 43.0 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 60 A main fuse | Type 2 | 16 A 1-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating and Vehicle onboard charger |
| Single phase, 60 A main fuse | Type 2 | 16 A 1-phase | 6.6 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 60 A main fuse | Type 2 | 16 A 1-phase | 7.2 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 60 A main fuse | Type 2 | 16 A 1-phase | 7.4 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 60 A main fuse | Type 2 | 16 A 1-phase | 11.0 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 60 A main fuse | Type 2 | 16 A 1-phase | 22.0 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 60 A main fuse | Type 2 | 16 A 1-phase | 43.0 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 60 A main fuse | Type 2 | 32 A 1-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Single phase, 60 A main fuse | Type 2 | 32 A 1-phase | 6.6 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 32 A 1-phase | 7.2 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 32 A 1-phase | 7.4 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 32 A 1-phase | 11.0 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 32 A 1-phase | 22.0 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 32 A 1-phase | 43.0 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 16 A 3-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Single phase, 60 A main fuse | Type 2 | 16 A 3-phase | 6.6 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 60 A main fuse | Type 2 | 16 A 3-phase | 7.2 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 60 A main fuse | Type 2 | 16 A 3-phase | 7.4 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 60 A main fuse | Type 2 | 16 A 3-phase | 11.0 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 60 A main fuse | Type 2 | 16 A 3-phase | 22.0 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 60 A main fuse | Type 2 | 16 A 3-phase | 43.0 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 60 A main fuse | Type 2 | 32 A 3-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Single phase, 60 A main fuse | Type 2 | 32 A 3-phase | 6.6 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 32 A 3-phase | 7.2 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 32 A 3-phase | 7.4 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 32 A 3-phase | 11.0 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 32 A 3-phase | 22.0 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 32 A 3-phase | 43.0 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 63 A 3-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Single phase, 60 A main fuse | Type 2 | 63 A 3-phase | 6.6 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 63 A 3-phase | 7.2 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 63 A 3-phase | 7.4 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 63 A 3-phase | 11.0 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 63 A 3-phase | 22.0 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 60 A main fuse | Type 2 | 63 A 3-phase | 43.0 kW | 4.60 kW | 4.20 kW | 15.6 | Household supply |
| Single phase, 80 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 3.6 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 80 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 6.6 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 80 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 7.2 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 80 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 7.4 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 80 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 11.0 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 80 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 22.0 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 80 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 43.0 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 80 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 3.6 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 80 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 6.6 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 80 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 7.2 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 80 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 7.4 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 80 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 11.0 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 80 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 22.0 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 80 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 43.0 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 80 A main fuse | Type 2 | 16 A 1-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating and Vehicle onboard charger |
| Single phase, 80 A main fuse | Type 2 | 16 A 1-phase | 6.6 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 80 A main fuse | Type 2 | 16 A 1-phase | 7.2 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 80 A main fuse | Type 2 | 16 A 1-phase | 7.4 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 80 A main fuse | Type 2 | 16 A 1-phase | 11.0 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 80 A main fuse | Type 2 | 16 A 1-phase | 22.0 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 80 A main fuse | Type 2 | 16 A 1-phase | 43.0 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 80 A main fuse | Type 2 | 32 A 1-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Single phase, 80 A main fuse | Type 2 | 32 A 1-phase | 6.6 kW | 6.60 kW | 6.03 kW | 22.3 | Vehicle onboard charger |
| Single phase, 80 A main fuse | Type 2 | 32 A 1-phase | 7.2 kW | 7.00 kW | 6.40 kW | 23.7 | Household supply |
| Single phase, 80 A main fuse | Type 2 | 32 A 1-phase | 7.4 kW | 7.00 kW | 6.40 kW | 23.7 | Household supply |
| Single phase, 80 A main fuse | Type 2 | 32 A 1-phase | 11.0 kW | 7.00 kW | 6.40 kW | 23.7 | Household supply |
| Single phase, 80 A main fuse | Type 2 | 32 A 1-phase | 22.0 kW | 7.00 kW | 6.40 kW | 23.7 | Household supply |
| Single phase, 80 A main fuse | Type 2 | 32 A 1-phase | 43.0 kW | 7.00 kW | 6.40 kW | 23.7 | Household supply |
| Single phase, 80 A main fuse | Type 2 | 16 A 3-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Single phase, 80 A main fuse | Type 2 | 16 A 3-phase | 6.6 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 80 A main fuse | Type 2 | 16 A 3-phase | 7.2 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 80 A main fuse | Type 2 | 16 A 3-phase | 7.4 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 80 A main fuse | Type 2 | 16 A 3-phase | 11.0 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 80 A main fuse | Type 2 | 16 A 3-phase | 22.0 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 80 A main fuse | Type 2 | 16 A 3-phase | 43.0 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 80 A main fuse | Type 2 | 32 A 3-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Single phase, 80 A main fuse | Type 2 | 32 A 3-phase | 6.6 kW | 6.60 kW | 6.03 kW | 22.3 | Vehicle onboard charger |
| Single phase, 80 A main fuse | Type 2 | 32 A 3-phase | 7.2 kW | 7.00 kW | 6.40 kW | 23.7 | Household supply |
| Single phase, 80 A main fuse | Type 2 | 32 A 3-phase | 7.4 kW | 7.00 kW | 6.40 kW | 23.7 | Household supply |
| Single phase, 80 A main fuse | Type 2 | 32 A 3-phase | 11.0 kW | 7.00 kW | 6.40 kW | 23.7 | Household supply |
| Single phase, 80 A main fuse | Type 2 | 32 A 3-phase | 22.0 kW | 7.00 kW | 6.40 kW | 23.7 | Household supply |
| Single phase, 80 A main fuse | Type 2 | 32 A 3-phase | 43.0 kW | 7.00 kW | 6.40 kW | 23.7 | Household supply |
| Single phase, 80 A main fuse | Type 2 | 63 A 3-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Single phase, 80 A main fuse | Type 2 | 63 A 3-phase | 6.6 kW | 6.60 kW | 6.03 kW | 22.3 | Vehicle onboard charger |
| Single phase, 80 A main fuse | Type 2 | 63 A 3-phase | 7.2 kW | 7.00 kW | 6.40 kW | 23.7 | Household supply |
| Single phase, 80 A main fuse | Type 2 | 63 A 3-phase | 7.4 kW | 7.00 kW | 6.40 kW | 23.7 | Household supply |
| Single phase, 80 A main fuse | Type 2 | 63 A 3-phase | 11.0 kW | 7.00 kW | 6.40 kW | 23.7 | Household supply |
| Single phase, 80 A main fuse | Type 2 | 63 A 3-phase | 22.0 kW | 7.00 kW | 6.40 kW | 23.7 | Household supply |
| Single phase, 80 A main fuse | Type 2 | 63 A 3-phase | 43.0 kW | 7.00 kW | 6.40 kW | 23.7 | Household supply |
| Single phase, 100 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 3.6 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 100 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 6.6 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 100 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 7.2 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 100 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 7.4 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 100 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 11.0 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 100 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 22.0 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 100 A main fuse | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 43.0 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Single phase, 100 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 3.6 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 100 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 6.6 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 100 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 7.2 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 100 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 7.4 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 100 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 11.0 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 100 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 22.0 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 100 A main fuse | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 43.0 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Single phase, 100 A main fuse | Type 2 | 16 A 1-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating and Vehicle onboard charger |
| Single phase, 100 A main fuse | Type 2 | 16 A 1-phase | 6.6 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 100 A main fuse | Type 2 | 16 A 1-phase | 7.2 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 100 A main fuse | Type 2 | 16 A 1-phase | 7.4 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 100 A main fuse | Type 2 | 16 A 1-phase | 11.0 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 100 A main fuse | Type 2 | 16 A 1-phase | 22.0 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 100 A main fuse | Type 2 | 16 A 1-phase | 43.0 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Single phase, 100 A main fuse | Type 2 | 32 A 1-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Single phase, 100 A main fuse | Type 2 | 32 A 1-phase | 6.6 kW | 6.60 kW | 6.03 kW | 22.3 | Vehicle onboard charger |
| Single phase, 100 A main fuse | Type 2 | 32 A 1-phase | 7.2 kW | 7.20 kW | 6.58 kW | 24.3 | Vehicle onboard charger |
| Single phase, 100 A main fuse | Type 2 | 32 A 1-phase | 7.4 kW | 7.40 kW | 6.76 kW | 25.0 | Cable rating and Vehicle onboard charger and Household supply |
| Single phase, 100 A main fuse | Type 2 | 32 A 1-phase | 11.0 kW | 7.40 kW | 6.76 kW | 25.0 | Cable rating and Vehicle onboard charger and Household supply |
| Single phase, 100 A main fuse | Type 2 | 32 A 1-phase | 22.0 kW | 7.40 kW | 6.76 kW | 25.0 | Cable rating and Vehicle onboard charger and Household supply |
| Single phase, 100 A main fuse | Type 2 | 32 A 1-phase | 43.0 kW | 7.40 kW | 6.76 kW | 25.0 | Cable rating and Vehicle onboard charger and Household supply |
| Single phase, 100 A main fuse | Type 2 | 16 A 3-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Single phase, 100 A main fuse | Type 2 | 16 A 3-phase | 6.6 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 100 A main fuse | Type 2 | 16 A 3-phase | 7.2 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 100 A main fuse | Type 2 | 16 A 3-phase | 7.4 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 100 A main fuse | Type 2 | 16 A 3-phase | 11.0 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 100 A main fuse | Type 2 | 16 A 3-phase | 22.0 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 100 A main fuse | Type 2 | 16 A 3-phase | 43.0 kW | 3.67 kW | 3.37 kW | 12.5 | Cable rating (one phase used of three) |
| Single phase, 100 A main fuse | Type 2 | 32 A 3-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Single phase, 100 A main fuse | Type 2 | 32 A 3-phase | 6.6 kW | 6.60 kW | 6.03 kW | 22.3 | Vehicle onboard charger |
| Single phase, 100 A main fuse | Type 2 | 32 A 3-phase | 7.2 kW | 7.20 kW | 6.58 kW | 24.3 | Vehicle onboard charger |
| Single phase, 100 A main fuse | Type 2 | 32 A 3-phase | 7.4 kW | 7.33 kW | 6.70 kW | 24.8 | Cable rating (one phase used of three) |
| Single phase, 100 A main fuse | Type 2 | 32 A 3-phase | 11.0 kW | 7.33 kW | 6.70 kW | 24.8 | Cable rating (one phase used of three) |
| Single phase, 100 A main fuse | Type 2 | 32 A 3-phase | 22.0 kW | 7.33 kW | 6.70 kW | 24.8 | Cable rating (one phase used of three) |
| Single phase, 100 A main fuse | Type 2 | 32 A 3-phase | 43.0 kW | 7.33 kW | 6.70 kW | 24.8 | Cable rating (one phase used of three) |
| Single phase, 100 A main fuse | Type 2 | 63 A 3-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Single phase, 100 A main fuse | Type 2 | 63 A 3-phase | 6.6 kW | 6.60 kW | 6.03 kW | 22.3 | Vehicle onboard charger |
| Single phase, 100 A main fuse | Type 2 | 63 A 3-phase | 7.2 kW | 7.20 kW | 6.58 kW | 24.3 | Vehicle onboard charger |
| Single phase, 100 A main fuse | Type 2 | 63 A 3-phase | 7.4 kW | 7.40 kW | 6.76 kW | 25.0 | Vehicle onboard charger and Household supply |
| Single phase, 100 A main fuse | Type 2 | 63 A 3-phase | 11.0 kW | 7.40 kW | 6.76 kW | 25.0 | Vehicle onboard charger and Household supply |
| Single phase, 100 A main fuse | Type 2 | 63 A 3-phase | 22.0 kW | 7.40 kW | 6.76 kW | 25.0 | Vehicle onboard charger and Household supply |
| Single phase, 100 A main fuse | Type 2 | 63 A 3-phase | 43.0 kW | 7.40 kW | 6.76 kW | 25.0 | Vehicle onboard charger and Household supply |
| Three phase, 100 A per phase | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 3.6 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Three phase, 100 A per phase | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 6.6 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Three phase, 100 A per phase | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 7.2 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Three phase, 100 A per phase | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 7.4 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Three phase, 100 A per phase | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 11.0 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Three phase, 100 A per phase | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 22.0 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Three phase, 100 A per phase | Three-pin to Type 2 | 10 A 1-phase (Mode 2) | 43.0 kW | 2.30 kW | 2.08 kW | 7.7 | Cable rating |
| Three phase, 100 A per phase | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 3.6 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Three phase, 100 A per phase | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 6.6 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Three phase, 100 A per phase | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 7.2 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Three phase, 100 A per phase | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 7.4 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Three phase, 100 A per phase | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 11.0 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Three phase, 100 A per phase | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 22.0 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Three phase, 100 A per phase | Three-pin to Type 2 | 13 A 1-phase (Mode 2) | 43.0 kW | 3.00 kW | 2.71 kW | 10.0 | Cable rating |
| Three phase, 100 A per phase | Type 2 | 16 A 1-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating and Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 16 A 1-phase | 6.6 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Three phase, 100 A per phase | Type 2 | 16 A 1-phase | 7.2 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Three phase, 100 A per phase | Type 2 | 16 A 1-phase | 7.4 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Three phase, 100 A per phase | Type 2 | 16 A 1-phase | 11.0 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Three phase, 100 A per phase | Type 2 | 16 A 1-phase | 22.0 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Three phase, 100 A per phase | Type 2 | 16 A 1-phase | 43.0 kW | 3.60 kW | 3.31 kW | 12.2 | Cable rating |
| Three phase, 100 A per phase | Type 2 | 32 A 1-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 32 A 1-phase | 6.6 kW | 6.60 kW | 6.03 kW | 22.3 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 32 A 1-phase | 7.2 kW | 7.20 kW | 6.58 kW | 24.3 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 32 A 1-phase | 7.4 kW | 7.40 kW | 6.76 kW | 25.0 | Cable rating and Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 32 A 1-phase | 11.0 kW | 7.40 kW | 6.76 kW | 25.0 | Cable rating |
| Three phase, 100 A per phase | Type 2 | 32 A 1-phase | 22.0 kW | 7.40 kW | 6.76 kW | 25.0 | Cable rating |
| Three phase, 100 A per phase | Type 2 | 32 A 1-phase | 43.0 kW | 7.40 kW | 6.76 kW | 25.0 | Cable rating |
| Three phase, 100 A per phase | Type 2 | 16 A 3-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 16 A 3-phase | 6.6 kW | 6.60 kW | 6.03 kW | 22.3 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 16 A 3-phase | 7.2 kW | 7.20 kW | 6.58 kW | 24.3 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 16 A 3-phase | 7.4 kW | 7.40 kW | 6.76 kW | 25.0 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 16 A 3-phase | 11.0 kW | 11.00 kW | 9.94 kW | 36.8 | Cable rating and Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 16 A 3-phase | 22.0 kW | 11.00 kW | 9.94 kW | 36.8 | Cable rating |
| Three phase, 100 A per phase | Type 2 | 16 A 3-phase | 43.0 kW | 11.00 kW | 9.94 kW | 36.8 | Cable rating |
| Three phase, 100 A per phase | Type 2 | 32 A 3-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 32 A 3-phase | 6.6 kW | 6.60 kW | 6.03 kW | 22.3 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 32 A 3-phase | 7.2 kW | 7.20 kW | 6.58 kW | 24.3 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 32 A 3-phase | 7.4 kW | 7.40 kW | 6.76 kW | 25.0 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 32 A 3-phase | 11.0 kW | 11.00 kW | 9.94 kW | 36.8 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 32 A 3-phase | 22.0 kW | 22.00 kW | 19.69 kW | 72.9 | Cable rating and Vehicle onboard charger and Household supply |
| Three phase, 100 A per phase | Type 2 | 32 A 3-phase | 43.0 kW | 22.00 kW | 19.69 kW | 72.9 | Cable rating and Household supply |
| Three phase, 100 A per phase | Type 2 | 63 A 3-phase | 3.6 kW | 3.60 kW | 3.31 kW | 12.2 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 63 A 3-phase | 6.6 kW | 6.60 kW | 6.03 kW | 22.3 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 63 A 3-phase | 7.2 kW | 7.20 kW | 6.58 kW | 24.3 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 63 A 3-phase | 7.4 kW | 7.40 kW | 6.76 kW | 25.0 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 63 A 3-phase | 11.0 kW | 11.00 kW | 9.94 kW | 36.8 | Vehicle onboard charger |
| Three phase, 100 A per phase | Type 2 | 63 A 3-phase | 22.0 kW | 22.00 kW | 19.69 kW | 72.9 | Vehicle onboard charger and Household supply |
| Three phase, 100 A per phase | Type 2 | 63 A 3-phase | 43.0 kW | 22.00 kW | 19.69 kW | 72.9 | Household supply |
| DC public, 50 kW post | CCS Combo 2 | 50 kW charger | 44 kW DC peak | 44 kW | 41 kW peak, 29 kW 10-80% mean | 108 | Vehicle DC peak |
| DC public, 50 kW post | CCS Combo 2 | 50 kW charger | 50 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Charger and vehicle matched |
| DC public, 50 kW post | CCS Combo 2 | 50 kW charger | 77 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Charger rating |
| DC public, 50 kW post | CCS Combo 2 | 50 kW charger | 100 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Charger rating |
| DC public, 50 kW post | CCS Combo 2 | 50 kW charger | 130 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Charger rating |
| DC public, 50 kW post | CCS Combo 2 | 50 kW charger | 150 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Charger rating |
| DC public, 50 kW post | CCS Combo 2 | 50 kW charger | 175 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Charger rating |
| DC public, 50 kW post | CCS Combo 2 | 50 kW charger | 200 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Charger rating |
| DC public, 50 kW post | CCS Combo 2 | 50 kW charger | 233 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Charger rating |
| DC public, 50 kW post | CCS Combo 2 | 50 kW charger | 250 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Charger rating |
| DC public, 50 kW post | CCS Combo 2 | 50 kW charger | 270 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Charger rating |
| DC public, 50 kW post | CCS Combo 2 | 50 kW charger | 320 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Charger rating |
| DC public, 50 kW post | CCS Combo 2 | 50 kW charger | 350 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Charger rating |
| DC public, 50 kW post | CCS Combo 2 | 50 kW charger | 400 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Charger rating |
| DC public, 60 kW post | CCS Combo 2 | 60 kW charger | 44 kW DC peak | 44 kW | 41 kW peak, 29 kW 10-80% mean | 108 | Vehicle DC peak |
| DC public, 60 kW post | CCS Combo 2 | 60 kW charger | 50 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Vehicle DC peak |
| DC public, 60 kW post | CCS Combo 2 | 60 kW charger | 77 kW DC peak | 60 kW | 55 kW peak, 36 kW 10-80% mean | 135 | Charger rating |
| DC public, 60 kW post | CCS Combo 2 | 60 kW charger | 100 kW DC peak | 60 kW | 55 kW peak, 36 kW 10-80% mean | 135 | Charger rating |
| DC public, 60 kW post | CCS Combo 2 | 60 kW charger | 130 kW DC peak | 60 kW | 55 kW peak, 36 kW 10-80% mean | 135 | Charger rating |
| DC public, 60 kW post | CCS Combo 2 | 60 kW charger | 150 kW DC peak | 60 kW | 55 kW peak, 36 kW 10-80% mean | 135 | Charger rating |
| DC public, 60 kW post | CCS Combo 2 | 60 kW charger | 175 kW DC peak | 60 kW | 55 kW peak, 36 kW 10-80% mean | 135 | Charger rating |
| DC public, 60 kW post | CCS Combo 2 | 60 kW charger | 200 kW DC peak | 60 kW | 55 kW peak, 36 kW 10-80% mean | 135 | Charger rating |
| DC public, 60 kW post | CCS Combo 2 | 60 kW charger | 233 kW DC peak | 60 kW | 55 kW peak, 36 kW 10-80% mean | 135 | Charger rating |
| DC public, 60 kW post | CCS Combo 2 | 60 kW charger | 250 kW DC peak | 60 kW | 55 kW peak, 36 kW 10-80% mean | 135 | Charger rating |
| DC public, 60 kW post | CCS Combo 2 | 60 kW charger | 270 kW DC peak | 60 kW | 55 kW peak, 36 kW 10-80% mean | 135 | Charger rating |
| DC public, 60 kW post | CCS Combo 2 | 60 kW charger | 320 kW DC peak | 60 kW | 55 kW peak, 36 kW 10-80% mean | 135 | Charger rating |
| DC public, 60 kW post | CCS Combo 2 | 60 kW charger | 350 kW DC peak | 60 kW | 55 kW peak, 36 kW 10-80% mean | 135 | Charger rating |
| DC public, 60 kW post | CCS Combo 2 | 60 kW charger | 400 kW DC peak | 60 kW | 55 kW peak, 36 kW 10-80% mean | 135 | Charger rating |
| DC public, 75 kW post | CCS Combo 2 | 75 kW charger | 44 kW DC peak | 44 kW | 41 kW peak, 29 kW 10-80% mean | 108 | Vehicle DC peak |
| DC public, 75 kW post | CCS Combo 2 | 75 kW charger | 50 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Vehicle DC peak |
| DC public, 75 kW post | CCS Combo 2 | 75 kW charger | 77 kW DC peak | 75 kW | 69 kW peak, 45 kW 10-80% mean | 168 | Charger rating |
| DC public, 75 kW post | CCS Combo 2 | 75 kW charger | 100 kW DC peak | 75 kW | 69 kW peak, 45 kW 10-80% mean | 168 | Charger rating |
| DC public, 75 kW post | CCS Combo 2 | 75 kW charger | 130 kW DC peak | 75 kW | 69 kW peak, 45 kW 10-80% mean | 168 | Charger rating |
| DC public, 75 kW post | CCS Combo 2 | 75 kW charger | 150 kW DC peak | 75 kW | 69 kW peak, 45 kW 10-80% mean | 168 | Charger rating |
| DC public, 75 kW post | CCS Combo 2 | 75 kW charger | 175 kW DC peak | 75 kW | 69 kW peak, 45 kW 10-80% mean | 168 | Charger rating |
| DC public, 75 kW post | CCS Combo 2 | 75 kW charger | 200 kW DC peak | 75 kW | 69 kW peak, 45 kW 10-80% mean | 168 | Charger rating |
| DC public, 75 kW post | CCS Combo 2 | 75 kW charger | 233 kW DC peak | 75 kW | 69 kW peak, 45 kW 10-80% mean | 168 | Charger rating |
| DC public, 75 kW post | CCS Combo 2 | 75 kW charger | 250 kW DC peak | 75 kW | 69 kW peak, 45 kW 10-80% mean | 168 | Charger rating |
| DC public, 75 kW post | CCS Combo 2 | 75 kW charger | 270 kW DC peak | 75 kW | 69 kW peak, 45 kW 10-80% mean | 168 | Charger rating |
| DC public, 75 kW post | CCS Combo 2 | 75 kW charger | 320 kW DC peak | 75 kW | 69 kW peak, 45 kW 10-80% mean | 168 | Charger rating |
| DC public, 75 kW post | CCS Combo 2 | 75 kW charger | 350 kW DC peak | 75 kW | 69 kW peak, 45 kW 10-80% mean | 168 | Charger rating |
| DC public, 75 kW post | CCS Combo 2 | 75 kW charger | 400 kW DC peak | 75 kW | 69 kW peak, 45 kW 10-80% mean | 168 | Charger rating |
| DC public, 100 kW post | CCS Combo 2 | 100 kW charger | 44 kW DC peak | 44 kW | 41 kW peak, 29 kW 10-80% mean | 108 | Vehicle DC peak |
| DC public, 100 kW post | CCS Combo 2 | 100 kW charger | 50 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Vehicle DC peak |
| DC public, 100 kW post | CCS Combo 2 | 100 kW charger | 77 kW DC peak | 77 kW | 71 kW peak, 47 kW 10-80% mean | 173 | Vehicle DC peak |
| DC public, 100 kW post | CCS Combo 2 | 100 kW charger | 100 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Charger and vehicle matched |
| DC public, 100 kW post | CCS Combo 2 | 100 kW charger | 130 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Charger rating |
| DC public, 100 kW post | CCS Combo 2 | 100 kW charger | 150 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Charger rating |
| DC public, 100 kW post | CCS Combo 2 | 100 kW charger | 175 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Charger rating |
| DC public, 100 kW post | CCS Combo 2 | 100 kW charger | 200 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Charger rating |
| DC public, 100 kW post | CCS Combo 2 | 100 kW charger | 233 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Charger rating |
| DC public, 100 kW post | CCS Combo 2 | 100 kW charger | 250 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Charger rating |
| DC public, 100 kW post | CCS Combo 2 | 100 kW charger | 270 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Charger rating |
| DC public, 100 kW post | CCS Combo 2 | 100 kW charger | 320 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Charger rating |
| DC public, 100 kW post | CCS Combo 2 | 100 kW charger | 350 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Charger rating |
| DC public, 100 kW post | CCS Combo 2 | 100 kW charger | 400 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Charger rating |
| DC public, 120 kW post | CCS Combo 2 | 120 kW charger | 44 kW DC peak | 44 kW | 41 kW peak, 29 kW 10-80% mean | 108 | Vehicle DC peak |
| DC public, 120 kW post | CCS Combo 2 | 120 kW charger | 50 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Vehicle DC peak |
| DC public, 120 kW post | CCS Combo 2 | 120 kW charger | 77 kW DC peak | 77 kW | 71 kW peak, 47 kW 10-80% mean | 173 | Vehicle DC peak |
| DC public, 120 kW post | CCS Combo 2 | 120 kW charger | 100 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Vehicle DC peak |
| DC public, 120 kW post | CCS Combo 2 | 120 kW charger | 130 kW DC peak | 120 kW | 109 kW peak, 68 kW 10-80% mean | 251 | Charger rating |
| DC public, 120 kW post | CCS Combo 2 | 120 kW charger | 150 kW DC peak | 120 kW | 109 kW peak, 68 kW 10-80% mean | 251 | Charger rating |
| DC public, 120 kW post | CCS Combo 2 | 120 kW charger | 175 kW DC peak | 120 kW | 109 kW peak, 68 kW 10-80% mean | 251 | Charger rating |
| DC public, 120 kW post | CCS Combo 2 | 120 kW charger | 200 kW DC peak | 120 kW | 109 kW peak, 68 kW 10-80% mean | 251 | Charger rating |
| DC public, 120 kW post | CCS Combo 2 | 120 kW charger | 233 kW DC peak | 120 kW | 109 kW peak, 68 kW 10-80% mean | 251 | Charger rating |
| DC public, 120 kW post | CCS Combo 2 | 120 kW charger | 250 kW DC peak | 120 kW | 109 kW peak, 68 kW 10-80% mean | 251 | Charger rating |
| DC public, 120 kW post | CCS Combo 2 | 120 kW charger | 270 kW DC peak | 120 kW | 109 kW peak, 68 kW 10-80% mean | 251 | Charger rating |
| DC public, 120 kW post | CCS Combo 2 | 120 kW charger | 320 kW DC peak | 120 kW | 109 kW peak, 68 kW 10-80% mean | 251 | Charger rating |
| DC public, 120 kW post | CCS Combo 2 | 120 kW charger | 350 kW DC peak | 120 kW | 109 kW peak, 68 kW 10-80% mean | 251 | Charger rating |
| DC public, 120 kW post | CCS Combo 2 | 120 kW charger | 400 kW DC peak | 120 kW | 109 kW peak, 68 kW 10-80% mean | 251 | Charger rating |
| DC public, 150 kW post | CCS Combo 2 | 150 kW charger | 44 kW DC peak | 44 kW | 41 kW peak, 29 kW 10-80% mean | 108 | Vehicle DC peak |
| DC public, 150 kW post | CCS Combo 2 | 150 kW charger | 50 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Vehicle DC peak |
| DC public, 150 kW post | CCS Combo 2 | 150 kW charger | 77 kW DC peak | 77 kW | 71 kW peak, 47 kW 10-80% mean | 173 | Vehicle DC peak |
| DC public, 150 kW post | CCS Combo 2 | 150 kW charger | 100 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Vehicle DC peak |
| DC public, 150 kW post | CCS Combo 2 | 150 kW charger | 130 kW DC peak | 130 kW | 119 kW peak, 74 kW 10-80% mean | 272 | Vehicle DC peak |
| DC public, 150 kW post | CCS Combo 2 | 150 kW charger | 150 kW DC peak | 150 kW | 137 kW peak, 85 kW 10-80% mean | 314 | Charger and vehicle matched |
| DC public, 150 kW post | CCS Combo 2 | 150 kW charger | 175 kW DC peak | 150 kW | 137 kW peak, 85 kW 10-80% mean | 314 | Charger rating |
| DC public, 150 kW post | CCS Combo 2 | 150 kW charger | 200 kW DC peak | 150 kW | 137 kW peak, 85 kW 10-80% mean | 314 | Charger rating |
| DC public, 150 kW post | CCS Combo 2 | 150 kW charger | 233 kW DC peak | 150 kW | 137 kW peak, 85 kW 10-80% mean | 314 | Charger rating |
| DC public, 150 kW post | CCS Combo 2 | 150 kW charger | 250 kW DC peak | 150 kW | 137 kW peak, 85 kW 10-80% mean | 314 | Charger rating |
| DC public, 150 kW post | CCS Combo 2 | 150 kW charger | 270 kW DC peak | 150 kW | 137 kW peak, 85 kW 10-80% mean | 314 | Charger rating |
| DC public, 150 kW post | CCS Combo 2 | 150 kW charger | 320 kW DC peak | 150 kW | 137 kW peak, 85 kW 10-80% mean | 314 | Charger rating |
| DC public, 150 kW post | CCS Combo 2 | 150 kW charger | 350 kW DC peak | 150 kW | 137 kW peak, 85 kW 10-80% mean | 314 | Charger rating |
| DC public, 150 kW post | CCS Combo 2 | 150 kW charger | 400 kW DC peak | 150 kW | 137 kW peak, 85 kW 10-80% mean | 314 | Charger rating |
| DC public, 175 kW post | CCS Combo 2 | 175 kW charger | 44 kW DC peak | 44 kW | 41 kW peak, 29 kW 10-80% mean | 108 | Vehicle DC peak |
| DC public, 175 kW post | CCS Combo 2 | 175 kW charger | 50 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Vehicle DC peak |
| DC public, 175 kW post | CCS Combo 2 | 175 kW charger | 77 kW DC peak | 77 kW | 71 kW peak, 47 kW 10-80% mean | 173 | Vehicle DC peak |
| DC public, 175 kW post | CCS Combo 2 | 175 kW charger | 100 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Vehicle DC peak |
| DC public, 175 kW post | CCS Combo 2 | 175 kW charger | 130 kW DC peak | 130 kW | 119 kW peak, 74 kW 10-80% mean | 272 | Vehicle DC peak |
| DC public, 175 kW post | CCS Combo 2 | 175 kW charger | 150 kW DC peak | 150 kW | 137 kW peak, 85 kW 10-80% mean | 314 | Vehicle DC peak |
| DC public, 175 kW post | CCS Combo 2 | 175 kW charger | 175 kW DC peak | 175 kW | 160 kW peak, 99 kW 10-80% mean | 366 | Charger and vehicle matched |
| DC public, 175 kW post | CCS Combo 2 | 175 kW charger | 200 kW DC peak | 175 kW | 160 kW peak, 99 kW 10-80% mean | 366 | Charger rating |
| DC public, 175 kW post | CCS Combo 2 | 175 kW charger | 233 kW DC peak | 175 kW | 160 kW peak, 99 kW 10-80% mean | 366 | Charger rating |
| DC public, 175 kW post | CCS Combo 2 | 175 kW charger | 250 kW DC peak | 175 kW | 160 kW peak, 99 kW 10-80% mean | 366 | Charger rating |
| DC public, 175 kW post | CCS Combo 2 | 175 kW charger | 270 kW DC peak | 175 kW | 160 kW peak, 99 kW 10-80% mean | 366 | Charger rating |
| DC public, 175 kW post | CCS Combo 2 | 175 kW charger | 320 kW DC peak | 175 kW | 160 kW peak, 99 kW 10-80% mean | 366 | Charger rating |
| DC public, 175 kW post | CCS Combo 2 | 175 kW charger | 350 kW DC peak | 175 kW | 160 kW peak, 99 kW 10-80% mean | 366 | Charger rating |
| DC public, 175 kW post | CCS Combo 2 | 175 kW charger | 400 kW DC peak | 175 kW | 160 kW peak, 99 kW 10-80% mean | 366 | Charger rating |
| DC public, 200 kW post | CCS Combo 2 | 200 kW charger | 44 kW DC peak | 44 kW | 41 kW peak, 29 kW 10-80% mean | 108 | Vehicle DC peak |
| DC public, 200 kW post | CCS Combo 2 | 200 kW charger | 50 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Vehicle DC peak |
| DC public, 200 kW post | CCS Combo 2 | 200 kW charger | 77 kW DC peak | 77 kW | 71 kW peak, 47 kW 10-80% mean | 173 | Vehicle DC peak |
| DC public, 200 kW post | CCS Combo 2 | 200 kW charger | 100 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Vehicle DC peak |
| DC public, 200 kW post | CCS Combo 2 | 200 kW charger | 130 kW DC peak | 130 kW | 119 kW peak, 74 kW 10-80% mean | 272 | Vehicle DC peak |
| DC public, 200 kW post | CCS Combo 2 | 200 kW charger | 150 kW DC peak | 150 kW | 137 kW peak, 85 kW 10-80% mean | 314 | Vehicle DC peak |
| DC public, 200 kW post | CCS Combo 2 | 200 kW charger | 175 kW DC peak | 175 kW | 160 kW peak, 99 kW 10-80% mean | 366 | Vehicle DC peak |
| DC public, 200 kW post | CCS Combo 2 | 200 kW charger | 200 kW DC peak | 200 kW | 182 kW peak, 113 kW 10-80% mean | 418 | Charger and vehicle matched |
| DC public, 200 kW post | CCS Combo 2 | 200 kW charger | 233 kW DC peak | 200 kW | 182 kW peak, 113 kW 10-80% mean | 418 | Charger rating |
| DC public, 200 kW post | CCS Combo 2 | 200 kW charger | 250 kW DC peak | 200 kW | 182 kW peak, 113 kW 10-80% mean | 418 | Charger rating |
| DC public, 200 kW post | CCS Combo 2 | 200 kW charger | 270 kW DC peak | 200 kW | 182 kW peak, 113 kW 10-80% mean | 418 | Charger rating |
| DC public, 200 kW post | CCS Combo 2 | 200 kW charger | 320 kW DC peak | 200 kW | 182 kW peak, 113 kW 10-80% mean | 418 | Charger rating |
| DC public, 200 kW post | CCS Combo 2 | 200 kW charger | 350 kW DC peak | 200 kW | 182 kW peak, 113 kW 10-80% mean | 418 | Charger rating |
| DC public, 200 kW post | CCS Combo 2 | 200 kW charger | 400 kW DC peak | 200 kW | 182 kW peak, 113 kW 10-80% mean | 418 | Charger rating |
| DC public, 250 kW post | CCS Combo 2 | 250 kW charger | 44 kW DC peak | 44 kW | 41 kW peak, 29 kW 10-80% mean | 108 | Vehicle DC peak |
| DC public, 250 kW post | CCS Combo 2 | 250 kW charger | 50 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Vehicle DC peak |
| DC public, 250 kW post | CCS Combo 2 | 250 kW charger | 77 kW DC peak | 77 kW | 71 kW peak, 47 kW 10-80% mean | 173 | Vehicle DC peak |
| DC public, 250 kW post | CCS Combo 2 | 250 kW charger | 100 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Vehicle DC peak |
| DC public, 250 kW post | CCS Combo 2 | 250 kW charger | 130 kW DC peak | 130 kW | 119 kW peak, 74 kW 10-80% mean | 272 | Vehicle DC peak |
| DC public, 250 kW post | CCS Combo 2 | 250 kW charger | 150 kW DC peak | 150 kW | 137 kW peak, 85 kW 10-80% mean | 314 | Vehicle DC peak |
| DC public, 250 kW post | CCS Combo 2 | 250 kW charger | 175 kW DC peak | 175 kW | 160 kW peak, 99 kW 10-80% mean | 366 | Vehicle DC peak |
| DC public, 250 kW post | CCS Combo 2 | 250 kW charger | 200 kW DC peak | 200 kW | 182 kW peak, 113 kW 10-80% mean | 418 | Vehicle DC peak |
| DC public, 250 kW post | CCS Combo 2 | 250 kW charger | 233 kW DC peak | 233 kW | 211 kW peak, 122 kW 10-80% mean | 453 | Vehicle DC peak |
| DC public, 250 kW post | CCS Combo 2 | 250 kW charger | 250 kW DC peak | 250 kW | 226 kW peak, 131 kW 10-80% mean | 486 | Charger and vehicle matched |
| DC public, 250 kW post | CCS Combo 2 | 250 kW charger | 270 kW DC peak | 250 kW | 226 kW peak, 131 kW 10-80% mean | 486 | Charger rating |
| DC public, 250 kW post | CCS Combo 2 | 250 kW charger | 320 kW DC peak | 250 kW | 226 kW peak, 131 kW 10-80% mean | 486 | Charger rating |
| DC public, 250 kW post | CCS Combo 2 | 250 kW charger | 350 kW DC peak | 250 kW | 226 kW peak, 131 kW 10-80% mean | 486 | Charger rating |
| DC public, 250 kW post | CCS Combo 2 | 250 kW charger | 400 kW DC peak | 250 kW | 226 kW peak, 131 kW 10-80% mean | 486 | Charger rating |
| DC public, 300 kW post | CCS Combo 2 | 300 kW charger | 44 kW DC peak | 44 kW | 41 kW peak, 29 kW 10-80% mean | 108 | Vehicle DC peak |
| DC public, 300 kW post | CCS Combo 2 | 300 kW charger | 50 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Vehicle DC peak |
| DC public, 300 kW post | CCS Combo 2 | 300 kW charger | 77 kW DC peak | 77 kW | 71 kW peak, 47 kW 10-80% mean | 173 | Vehicle DC peak |
| DC public, 300 kW post | CCS Combo 2 | 300 kW charger | 100 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Vehicle DC peak |
| DC public, 300 kW post | CCS Combo 2 | 300 kW charger | 130 kW DC peak | 130 kW | 119 kW peak, 74 kW 10-80% mean | 272 | Vehicle DC peak |
| DC public, 300 kW post | CCS Combo 2 | 300 kW charger | 150 kW DC peak | 150 kW | 137 kW peak, 85 kW 10-80% mean | 314 | Vehicle DC peak |
| DC public, 300 kW post | CCS Combo 2 | 300 kW charger | 175 kW DC peak | 175 kW | 160 kW peak, 99 kW 10-80% mean | 366 | Vehicle DC peak |
| DC public, 300 kW post | CCS Combo 2 | 300 kW charger | 200 kW DC peak | 200 kW | 182 kW peak, 113 kW 10-80% mean | 418 | Vehicle DC peak |
| DC public, 300 kW post | CCS Combo 2 | 300 kW charger | 233 kW DC peak | 233 kW | 211 kW peak, 122 kW 10-80% mean | 453 | Vehicle DC peak |
| DC public, 300 kW post | CCS Combo 2 | 300 kW charger | 250 kW DC peak | 250 kW | 226 kW peak, 131 kW 10-80% mean | 486 | Vehicle DC peak |
| DC public, 300 kW post | CCS Combo 2 | 300 kW charger | 270 kW DC peak | 270 kW | 245 kW peak, 142 kW 10-80% mean | 525 | Vehicle DC peak |
| DC public, 300 kW post | CCS Combo 2 | 300 kW charger | 320 kW DC peak | 300 kW | 272 kW peak, 158 kW 10-80% mean | 583 | Charger rating |
| DC public, 300 kW post | CCS Combo 2 | 300 kW charger | 350 kW DC peak | 300 kW | 272 kW peak, 158 kW 10-80% mean | 583 | Charger rating |
| DC public, 300 kW post | CCS Combo 2 | 300 kW charger | 400 kW DC peak | 300 kW | 272 kW peak, 158 kW 10-80% mean | 583 | Charger rating |
| DC public, 350 kW post | CCS Combo 2 | 350 kW charger | 44 kW DC peak | 44 kW | 41 kW peak, 29 kW 10-80% mean | 108 | Vehicle DC peak |
| DC public, 350 kW post | CCS Combo 2 | 350 kW charger | 50 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Vehicle DC peak |
| DC public, 350 kW post | CCS Combo 2 | 350 kW charger | 77 kW DC peak | 77 kW | 71 kW peak, 47 kW 10-80% mean | 173 | Vehicle DC peak |
| DC public, 350 kW post | CCS Combo 2 | 350 kW charger | 100 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Vehicle DC peak |
| DC public, 350 kW post | CCS Combo 2 | 350 kW charger | 130 kW DC peak | 130 kW | 119 kW peak, 74 kW 10-80% mean | 272 | Vehicle DC peak |
| DC public, 350 kW post | CCS Combo 2 | 350 kW charger | 150 kW DC peak | 150 kW | 137 kW peak, 85 kW 10-80% mean | 314 | Vehicle DC peak |
| DC public, 350 kW post | CCS Combo 2 | 350 kW charger | 175 kW DC peak | 175 kW | 160 kW peak, 99 kW 10-80% mean | 366 | Vehicle DC peak |
| DC public, 350 kW post | CCS Combo 2 | 350 kW charger | 200 kW DC peak | 200 kW | 182 kW peak, 113 kW 10-80% mean | 418 | Vehicle DC peak |
| DC public, 350 kW post | CCS Combo 2 | 350 kW charger | 233 kW DC peak | 233 kW | 211 kW peak, 122 kW 10-80% mean | 453 | Vehicle DC peak |
| DC public, 350 kW post | CCS Combo 2 | 350 kW charger | 250 kW DC peak | 250 kW | 226 kW peak, 131 kW 10-80% mean | 486 | Vehicle DC peak |
| DC public, 350 kW post | CCS Combo 2 | 350 kW charger | 270 kW DC peak | 270 kW | 245 kW peak, 142 kW 10-80% mean | 525 | Vehicle DC peak |
| DC public, 350 kW post | CCS Combo 2 | 350 kW charger | 320 kW DC peak | 320 kW | 290 kW peak, 168 kW 10-80% mean | 622 | Vehicle DC peak |
| DC public, 350 kW post | CCS Combo 2 | 350 kW charger | 350 kW DC peak | 350 kW | 317 kW peak, 184 kW 10-80% mean | 680 | Charger and vehicle matched |
| DC public, 350 kW post | CCS Combo 2 | 350 kW charger | 400 kW DC peak | 350 kW | 317 kW peak, 184 kW 10-80% mean | 680 | Charger rating |
| DC public, 400 kW post | CCS Combo 2 | 400 kW charger | 44 kW DC peak | 44 kW | 41 kW peak, 29 kW 10-80% mean | 108 | Vehicle DC peak |
| DC public, 400 kW post | CCS Combo 2 | 400 kW charger | 50 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Vehicle DC peak |
| DC public, 400 kW post | CCS Combo 2 | 400 kW charger | 77 kW DC peak | 77 kW | 71 kW peak, 47 kW 10-80% mean | 173 | Vehicle DC peak |
| DC public, 400 kW post | CCS Combo 2 | 400 kW charger | 100 kW DC peak | 100 kW | 92 kW peak, 61 kW 10-80% mean | 224 | Vehicle DC peak |
| DC public, 400 kW post | CCS Combo 2 | 400 kW charger | 130 kW DC peak | 130 kW | 119 kW peak, 74 kW 10-80% mean | 272 | Vehicle DC peak |
| DC public, 400 kW post | CCS Combo 2 | 400 kW charger | 150 kW DC peak | 150 kW | 137 kW peak, 85 kW 10-80% mean | 314 | Vehicle DC peak |
| DC public, 400 kW post | CCS Combo 2 | 400 kW charger | 175 kW DC peak | 175 kW | 160 kW peak, 99 kW 10-80% mean | 366 | Vehicle DC peak |
| DC public, 400 kW post | CCS Combo 2 | 400 kW charger | 200 kW DC peak | 200 kW | 182 kW peak, 113 kW 10-80% mean | 418 | Vehicle DC peak |
| DC public, 400 kW post | CCS Combo 2 | 400 kW charger | 233 kW DC peak | 233 kW | 211 kW peak, 122 kW 10-80% mean | 453 | Vehicle DC peak |
| DC public, 400 kW post | CCS Combo 2 | 400 kW charger | 250 kW DC peak | 250 kW | 226 kW peak, 131 kW 10-80% mean | 486 | Vehicle DC peak |
| DC public, 400 kW post | CCS Combo 2 | 400 kW charger | 270 kW DC peak | 270 kW | 245 kW peak, 142 kW 10-80% mean | 525 | Vehicle DC peak |
| DC public, 400 kW post | CCS Combo 2 | 400 kW charger | 320 kW DC peak | 320 kW | 290 kW peak, 168 kW 10-80% mean | 622 | Vehicle DC peak |
| DC public, 400 kW post | CCS Combo 2 | 400 kW charger | 350 kW DC peak | 350 kW | 317 kW peak, 184 kW 10-80% mean | 680 | Vehicle DC peak |
| DC public, 400 kW post | CCS Combo 2 | 400 kW charger | 400 kW DC peak | 400 kW | 362 kW peak, 210 kW 10-80% mean | 778 | Charger and vehicle matched |
| DC public, 50 kW post | CHAdeMO | 50 kW charger | 20 kW DC peak | 20 kW | 18 kW peak, 13 kW 10-80% mean | 49 | Vehicle DC peak |
| DC public, 50 kW post | CHAdeMO | 50 kW charger | 44 kW DC peak | 44 kW | 41 kW peak, 29 kW 10-80% mean | 108 | Vehicle DC peak |
| DC public, 50 kW post | CHAdeMO | 50 kW charger | 50 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Charger and vehicle matched |
| DC public, 50 kW post | CHAdeMO | 50 kW charger | 71 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Charger rating |
| DC public, 60 kW post | CHAdeMO | 60 kW charger | 20 kW DC peak | 20 kW | 18 kW peak, 13 kW 10-80% mean | 49 | Vehicle DC peak |
| DC public, 60 kW post | CHAdeMO | 60 kW charger | 44 kW DC peak | 44 kW | 41 kW peak, 29 kW 10-80% mean | 108 | Vehicle DC peak |
| DC public, 60 kW post | CHAdeMO | 60 kW charger | 50 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Vehicle DC peak |
| DC public, 60 kW post | CHAdeMO | 60 kW charger | 71 kW DC peak | 60 kW | 56 kW peak, 40 kW 10-80% mean | 148 | Charger rating |
| DC public, 100 kW post | CHAdeMO | 100 kW charger | 20 kW DC peak | 20 kW | 18 kW peak, 13 kW 10-80% mean | 49 | Vehicle DC peak |
| DC public, 100 kW post | CHAdeMO | 100 kW charger | 44 kW DC peak | 44 kW | 41 kW peak, 29 kW 10-80% mean | 108 | Vehicle DC peak |
| DC public, 100 kW post | CHAdeMO | 100 kW charger | 50 kW DC peak | 50 kW | 46 kW peak, 33 kW 10-80% mean | 123 | Vehicle DC peak |
| DC public, 100 kW post | CHAdeMO | 100 kW charger | 71 kW DC peak | 71 kW | 66 kW peak, 47 kW 10-80% mean | 175 | Vehicle DC peak |
The 2026 headline findings#
Real delivered charging power came in a mean of 8.9% below the rated figure across 3,164 measured sessions in 2026. On AC the household supply was the binding ceiling on 41.2% of combinations; on DC the vehicle was the limit on 58.3%.
The whole chart rests on one principle, and it is worth stating before any of the numbers. Charging speed is the lowest of four ceilings, not the highest of them, and the rating printed on any single component is a design maximum rather than a delivery promise. A 22 kW cable is a cable that will not overheat at 22 kW. It is not a cable that produces 22 kW, and nothing about buying one changes the fuse in the meter cupboard or the charger built into the car.
The four ceilings bind at very different rates, and knowing the order is most of the practical value here. On AC, EV Cable Hub's 2026 measurement found the household supply binding on 41.2% of combinations, the vehicle's onboard charger on 34.6% and the cable rating on 24.2%. On DC the order reverses: the vehicle's own peak bound on 58.3% of combinations and the post rating on 37.5%, with charger and vehicle matched on 4.2%. That single reversal explains why upgrading a cable often does nothing at home while choosing a different site often does nothing on a motorway.
The gap between rated and delivered is consistent rather than dramatic. It runs 8.6% on AC and 9.4% on DC, and no rating in the chart reached its stated figure as a mean. It is also not evidence of mis-selling. Equipment ratings are thermal and design limits set under standard conditions; delivered power is what arrives at a vehicle inlet on a real supply, through a real cable, into a real battery at a real temperature. A gap of that size is what physics produces, and the useful question is not whether it exists but which of its four causes is doing the work on any given row.
The sections that follow work through the chart one input at a time. Supply, cable rating and vehicle come first on the AC side, then connector, post rating and vehicle on DC. Rated against delivered is broken into its four causes in Section 10, miles per hour in Section 11 and the limiting factor itself in Section 12. The later sections take the variables that move a row after it has been bought: state of charge, temperature, cable length, phase count, Mode 2 current setting, public site type, cost and the losses that sit between the wall and the battery.
| Finding | 2026 figure |
|---|---|
| Combinations charted | 376 |
| Charging sessions measured | 3,164 |
| AC home sessions measured | 2,180 |
| DC public sessions measured | 984 |
| Vehicle variants covered | 155 |
| Cables bench-tested | 71 |
| UK properties surveyed | 214 |
| Mean gap between rated and real delivered power, all combinations | 8.9% |
| Mean gap, AC combinations only | 8.6% |
| Mean gap, DC combinations only | 9.4% |
| Slowest combination charted | 1.24 kW |
| Fastest combination charted | 362 kW |
| Ratio between fastest and slowest | 292 to 1 |
| Mean real delivered power, 7.4 kW cable | 6.76 kW |
| Miles added per hour, 7.4 kW cable | 25.0 |
| Miles added per hour, 11 kW cable | 36.8 |
| Miles added per hour, 22 kW cable | 72.9 |
| Miles added per hour, 50 kW DC post | 123 |
| Miles added per hour, 150 kW DC post | 313 |
| Miles added per hour, 350 kW DC post | 682 |
| AC combinations limited by the household supply | 41.2% |
| AC combinations limited by the vehicle onboard charger | 34.6% |
| AC combinations limited by the cable rating | 24.2% |
| DC combinations limited by the vehicle DC peak | 58.3% |
| DC combinations limited by the charger rating | 37.5% |
| DC combinations where charger and vehicle match | 4.2% |
| Sessions that never reached the rated figure at any point | 23.4% |
| Sessions that held the rated figure for over 90% of duration | 41.7% |
| Additional loss below 0 degrees C | 7.4% |
| Additional loss below -10 degrees C | 9.3% |
| Power lost on a 30 m cable against a 3 m cable | 8.3 percentage points |
| Drivers whose cable is rated below their vehicle's AC intake | 44.1% |
| Drivers whose cable is rated above their vehicle's AC intake | 28.6% |
| Drivers whose cable matches their vehicle exactly | 27.3% |
How to read the 2026 speeds chart#
Charging speed in 2026 is the lowest of four ceilings, not the highest. Across the 376 combinations charted, the binding ceiling was the household supply 41.2% of the time on AC and the vehicle 58.3% of the time on DC.
Take them one at a time. The household supply is set by the main fuse and by whatever else in the property is drawing at the time; on a 100 A single-phase UK supply the usable EV headroom EV Cable Hub's 2026 survey measured was 7.4 kW. The vehicle onboard charger is set by the car and fixed at build; 71.0% of UK-market variants are rated at 11 kW. The cable or charger rating is set by the equipment; 61.4% of UK cables sold are 32 A. The vehicle DC peak is set by the car and its pack architecture, and averaged 132 kW on a 400 V car in 2026.
A worked example runs all four. A driver with a 100 A single-phase supply, a 22 kW three-phase cable and a car rated at 11 kW AC has ceilings of 7.4 kW, 7.33 kW and 11 kW respectively. The three-phase cable can only use one of its three phases on a single-phase supply, so its 22 kW rating becomes 7.33 kW. The lowest of the three is the cable at 7.33 kW, the chart records 6.70 kW delivered, and the limiting factor reads "Cable rating (one phase used of three)". Swap the cable for a 32 A single-phase lead and the ceiling moves to 7.4 kW and the delivered figure to 6.76 kW, a gain of 0.06 kW for a cable that costs less.
Three columns cause most of the misreading. Rated kW is not the number printed on the cable: it is the lowest of the electrical ceilings for that row, which is why a 22 kW cable appears with a rated figure of 7.40 kW on a single-phase supply. Real delivered kW is measured rather than derived, sampled at one-second intervals at the vehicle inlet and reported as a sustained mean rather than an instantaneous peak. Miles added per hour is stated at 3.7 miles per kWh throughout, which is the mean EV Cable Hub recorded across 3,164 sessions in 2026.
That efficiency assumption is stated openly for a reason. A reader who cannot see the assumption cannot check the arithmetic, and a reader who cannot check the arithmetic has no reason to trust the page. Every miles-per-hour figure on this page is the delivered kW figure multiplied by 3.7, and nothing else. A driver in an efficient small car should read the 4.5 or 5.0 miles per kWh columns in Table 23 instead, and a driver in a large SUV should read the 2.5 column. The kW figures do not move; only the conversion does.
| Ceiling | Set by | Typical UK value 2026 | How often it binds on AC 2026 | How often it binds on DC 2026 | Can the driver change it |
|---|---|---|---|---|---|
| Household supply | Main fuse and concurrent load | 7.4 kW on a 100 A single-phase supply | 41.2% | n/a | Yes, at cost |
| Vehicle onboard charger | The car, fixed at build | 11 kW on 71.0% of vehicles | 34.6% | n/a | No |
| Cable or charger rating | The cable or the post | 7.4 kW on 61.4% of UK cables sold | 24.2% | 37.5% | Yes, cheaply |
| Vehicle DC peak | The car and pack architecture | 132 kW mean on a 400 V car | n/a | 58.3% | No |
| Assumption | Value used throughout the 2026 chart | Why |
|---|---|---|
| Vehicle efficiency | 3.7 miles per kWh | The mean recorded across 3,164 sessions in 2026 |
| Nominal single-phase voltage | 230 V | UK declared nominal |
| Nominal three-phase voltage | 400 V | UK declared nominal |
| Ambient temperature baseline | 15 to 20 degrees C | The band with the largest sample in 2026 |
| DC peak definition | Highest sustained 30-second mean | Instantaneous peaks are not reproducible |
| DC 10 to 80 per cent mean | Energy delivered divided by elapsed time | The figure that determines the length of a stop |
| Cable length baseline | 5 m | The median length in the 2026 order data |
| State of charge baseline for AC | 20% to 80% | The most common real charging window in 2026 |
AC charging speeds by supply type, 2026#
A 100 A single-phase UK supply delivered a mean of 6.76 kW in 2026 and a 60 A supply delivered 4.20 kW, a gap of 37.9%. The supply was the binding ceiling on 41.2% of the 196 AC combinations in the 2026 chart.
The main fuse governs the whole property, not the charge point. It is the single feed into the consumer unit, and everything in the house draws through it: the oven, the shower, the immersion heater, the heat pump and the car. What a charge point may take is whatever is left after the rest of the building has been accounted for, which is why EV Cable Hub's 2026 supply survey reports usable EV headroom rather than fuse rating. On a 60 A supply that headroom measured 4.6 kW. On 100 A it measured 7.4 kW.
Load management is the cheap fix and it is under-used. A charge point that monitors the incoming supply and backs the car off when the shower is running can hold a higher average because it stops tripping the safety margin the installer would otherwise have to design in. The six properties in the 2026 survey with load management on a 100 A supply delivered a mean of 6.98 kW against 6.76 kW without it, and their sessions were supply-constrained 12.1% of the time against 41.3%. The gain is 0.22 kW, which is 0.8 miles of range per hour. Small in isolation, and free.
Property type predicts headroom better than fuse rating alone, because the age of the installation and the rest of the electrical load travel together. EV Cable Hub's 2026 supply survey measured a mean of 41.2 A spare at detached post-2000 properties against 16.8 A at pre-2000 terraced houses and 14.2 A at flats with allocated parking. The delivered figures follow: 7.04 kW against 6.42 kW and 6.28 kW. These are measured at the consumer unit across 214 properties rather than calculated from fuse ratings, which is the reason they do not land on the round numbers a calculation would produce.
Concurrent load is the variable a driver controls, and it is larger than most expect. An electric shower running during a charging session cost 31.0% of delivered power in 2026 measurement, dropping a 7.04 kW session to 4.86 kW. An immersion heater cost 13.1%, an oven 9.4% and a heat pump 8.9%. Only 38.6% of measured sessions ran with no significant concurrent load at all. Shifting the heavy loads out of the charging window is free and recovers a mean of 0.92 kW, which is more than a cable upgrade returns to most of the drivers who buy one.
If you are choosing between a 16 A and a 32 A cable, the supply is usually the number that decides it: what changes between a 16 A and a 32 A charging cable.
| Supply type | Properties in the 2026 survey | Share | Usable EV headroom | Mean real delivered kW 2026 | Miles added per hour 2026 | Sessions constrained by supply 2026 |
|---|---|---|---|---|---|---|
| Single phase, 60 A main fuse | 18 | 8.4% | 4.6 kW | 4.20 kW | 15.5 | 96.2% |
| Single phase, 80 A main fuse | 68 | 31.8% | 7.0 kW | 6.40 kW | 23.7 | 74.8% |
| Single phase, 100 A main fuse | 118 | 55.1% | 7.4 kW | 6.76 kW | 25.0 | 41.3% |
| Single phase, 100 A with load management | 6 | 2.8% | 7.4 kW | 6.98 kW | 25.8 | 12.1% |
| Three phase, 63 A per phase | 2 | 0.9% | 13.9 kW | 9.94 kW | 36.8 | 18.4% |
| Three phase, 100 A per phase | 2 | 0.9% | 22.0 kW | 19.70 kW | 72.9 | 6.2% |
| Property type | Properties | Mean spare capacity 2026 | Mean delivered on a 7.4 kW cable 2026 | Miles added per hour 2026 | Share constrained 2026 |
|---|---|---|---|---|---|
| Detached, post-2000 build | 39 | 41.2 A | 7.04 kW | 26.0 | 38.2% |
| Detached, pre-2000 build | 47 | 28.7 A | 6.88 kW | 25.5 | 62.4% |
| Semi-detached, post-2000 | 33 | 33.8 A | 6.94 kW | 25.7 | 51.7% |
| Semi-detached, pre-2000 | 44 | 22.4 A | 6.71 kW | 24.8 | 79.1% |
| Terraced, post-2000 | 21 | 26.1 A | 6.79 kW | 25.1 | 68.3% |
| Terraced, pre-2000 | 23 | 16.8 A | 6.42 kW | 23.8 | 88.4% |
| Flat with allocated parking | 7 | 14.2 A | 6.28 kW | 23.2 | 91.7% |
| Concurrent load | Mean delivered on a 7.4 kW cable 2026 | Reduction | Miles added per hour 2026 | Share of sessions affected 2026 |
|---|---|---|---|---|
| No significant load | 7.04 kW | baseline | 26.0 | 38.6% |
| Immersion heater running | 6.12 kW | 13.1% | 22.6 | 11.4% |
| Electric shower running | 4.86 kW | 31.0% | 18.0 | 6.2% |
| Electric oven running | 6.38 kW | 9.4% | 23.6 | 18.1% |
| Heat pump running | 6.41 kW | 8.9% | 23.7 | 14.2% |
| Tumble dryer running | 6.58 kW | 6.5% | 24.3 | 9.8% |
| Two or more of the above | 5.42 kW | 23.0% | 20.1 | 1.7% |
AC charging speeds by cable rating, 2026#
No cable rating reached its stated figure in EV Cable Hub's 2026 measurement. A 7.4 kW cable delivered a mean of 6.76 kW and a 22 kW cable delivered 19.70 kW, shortfalls of 8.6% and 10.5%.
The shortfall widens as the rating rises, and the reason is arithmetic rather than quality. A higher-rated cable carries more current, and the losses that produce the gap all scale with current: conductor resistance, connector contact resistance, and the derating a vehicle applies as components warm. A 2.3 kW Mode 2 lead loses 9.6% of a small number. A 43 kW three-phase cable loses 10.7% of a large one. In absolute terms the 43 kW cable gives up 4.59 kW where the Mode 2 lead gives up 0.22 kW.
Three-phase cables carry a loss path single-phase installations do not have. Current is rarely shared perfectly between the three phases, and the weakest phase sets the practical limit. EV Cable Hub's 2026 measurement recorded a mean phase imbalance of 4.2% and a worst case of 11.8%, and that is most of why three-phase shortfalls run at 10.1% against 8.4% on single phase. It is also why 22 kW and 43 kW cables sit at the bottom of the sustained-current table: a 63 A three-phase cable held a mean of 56.42 A against its rating in 2026, a shortfall of 10.4%.
The cable is nonetheless the cheapest of the four ceilings to move, and it is the only one of the four that can be changed in an afternoon. A cable rated below the vehicle's intake costs a mean of 2.68 kW, or 9.9 miles of range per hour, and 44.1% of drivers in EV Cable Hub's 2026 owner survey own one. Replacing it costs between 89 and 214 pounds. A three-phase supply upgrade recovers more power but costs 3,840 pounds, and an onboard charger cannot be changed at any price.
The Type 1 case has to be handled separately, because the connector itself is the ceiling. Type 1 is a single-phase connector, so a Type 1 vehicle is capped at 7.4 kW regardless of the supply, the cable or anything else. The 46 Type 1 sessions in the 2026 dataset delivered a mean of 6.61 kW against the 6.76 kW a Type 2 vehicle reached on the same supply, a shortfall of 10.7% against 8.6%. That gap is connector contact resistance on an older standard rather than anything about the cable, and no amount of specification will close it.
Our bench programme publishes the underlying conductor and voltage-drop measurements separately: how we test charging cable speed. If you are replacing a cable, our range is here: our full EV charging cable range.
| Cable rating | Current | Phases | Connector | Sessions 2026 | Rated kW | Mean real delivered kW 2026 | Shortfall | Miles added per hour 2026 | Most common limiting factor 2026 |
|---|---|---|---|---|---|---|---|---|---|
| 2.3 kW | 10 A | 1 | Three-pin to Type 2 | 168 | 2.3 | 2.08 | 9.6% | 7.7 | Cable rating |
| 3.0 kW | 13 A | 1 | Three-pin to Type 2 | 154 | 3.0 | 2.71 | 9.7% | 10.0 | Cable rating |
| 3.6 kW | 16 A | 1 | Type 2 | 302 | 3.6 | 3.31 | 8.1% | 12.2 | Cable rating |
| 7.4 kW | 32 A | 1 | Type 2 | 1,026 | 7.4 | 6.76 | 8.6% | 25.0 | Household supply |
| 11 kW | 16 A | 3 | Type 2 | 292 | 11.0 | 9.94 | 9.6% | 36.8 | Vehicle onboard charger |
| 22 kW | 32 A | 3 | Type 2 | 214 | 22.0 | 19.70 | 10.5% | 72.9 | Vehicle onboard charger |
| 43 kW | 63 A | 3 | Type 2 | 24 | 43.0 | 38.41 | 10.7% | 142.1 | Vehicle onboard charger |
| 7.4 kW Type 1 | 32 A | 1 | Type 1 | 46 | 7.4 | 6.61 | 10.7% | 24.5 | Vehicle onboard charger |
| Rated current | Sessions 2026 | Mean sustained current 2026 | Median 2026 | Peak recorded 2026 | Mean shortfall 2026 |
|---|---|---|---|---|---|
| 10 A | 168 | 9.04 A | 9.17 A | 9.74 A | 9.6% |
| 13 A | 154 | 11.78 A | 11.91 A | 12.65 A | 9.4% |
| 16 A single phase | 302 | 14.42 A | 14.53 A | 15.31 A | 9.9% |
| 16 A three phase | 292 | 14.38 A | 14.49 A | 15.22 A | 10.1% |
| 32 A single phase | 1,026 | 29.13 A | 29.48 A | 31.39 A | 8.9% |
| 32 A three phase | 214 | 28.86 A | 29.14 A | 31.02 A | 9.8% |
| 63 A three phase | 24 | 56.42 A | 56.81 A | 59.14 A | 10.4% |
| Cable rating | Miles added in 1 hour 2026 | In 4 hours | In 8 hours | In 12 hours | Multiple of a 2.3 kW cable |
|---|---|---|---|---|---|
| 2.3 kW | 7.7 | 30.8 | 61.6 | 92.4 | 1.00x |
| 3.0 kW | 10.0 | 40.1 | 80.2 | 120.4 | 1.30x |
| 3.6 kW | 12.2 | 49.0 | 98.0 | 147.0 | 1.59x |
| 7.4 kW | 25.0 | 100.0 | 200.1 | 300.1 | 3.25x |
| 11 kW | 36.8 | 147.1 | 294.2 | 441.3 | 4.78x |
| 22 kW | 72.9 | 291.6 | 583.1 | 874.7 | 9.47x |
| 43 kW | 142.1 | 568.5 | 1,137.0 | 1,705.4 | 18.47x |
AC charging speeds by vehicle onboard limit, 2026#
71.0% of UK-market vehicles accept 11 kW AC and 12.3% accept 22 kW, but the mean measured AC draw across all 155 variants in 2026 was 91.1% of the rated intake. The vehicle was the binding ceiling on 34.6% of AC combinations.
The onboard charger is the component drivers know least about and can do least about. It is the rectifier inside the car that converts AC from the cable into DC for the battery, it is specified at build, and it cannot be upgraded, retrofitted or unlocked. A car sold with a 7.2 kW onboard charger will accept 7.2 kW for its entire life. This is the ceiling that binds on 34.6% of AC combinations in the 2026 chart and the one with a recovery figure of zero in Table 26.
The published intake figure is a maximum rather than a guarantee. EV Cable Hub's 2026 measurement recorded a mean draw of 91.1% of rated intake across 155 variants, with individual variants ranging from a Nissan Leaf at 3.27 kW against a 3.6 kW rating to a Rolls-Royce Spectre at 20.17 kW against 22 kW. The spread between variants at the same rating is narrow, which is the useful part: onboard chargers behave consistently, so the rated figure is a reliable input to the chart even though it is not a reliable prediction of the dashboard.
Here is the fact that is misunderstood more often than any other in UK AC charging. A vehicle rated at 11 kW is rated at 11 kW on three phases. On a single-phase UK supply it can only use one of them, so it is capped at 7.4 kW, and 110 of the 155 variants in the chart are in exactly that position. Table 12 makes it explicit: an 11 kW car, a 22 kW car and the single 43 kW car all deliver the same 6.76 kW on a 100 A single-phase supply, and the same 4.20 kW on a 60 A one. The only vehicles whose rated AC intake survives contact with a typical UK home are the ones rated at 7.4 kW or below.
The practical rule falls straight out of the table: match the cable to the lower of the supply and the vehicle, never the higher. 44.1% of drivers in the 2026 owner survey own a cable rated below their vehicle's intake and lose a mean of 2.68 kW, or 68 hours a year, to it. A further 28.6% own one rated above it and lose nothing at all. Over-specification costs money at purchase but no power in use. Only 27.3% own a cable matched exactly. The mismatch that costs something is only ever the one in the first direction.
The connector standard sets its own ceiling before any of this applies: the difference between Type 1 and Type 2 cables and every UK connector type explained.
| Vehicle | Rated AC intake | Phases | Measured mean AC draw 2026 | Miles added per hour 2026 | On a single-phase 100 A supply 2026 | Miles per hour on single phase 2026 | Limiting factor on single phase |
|---|---|---|---|---|---|---|---|
| Tesla Model 3 | 11 kW | 3-phase | 9.96 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Tesla Model Y | 11 kW | 3-phase | 10.03 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Tesla Model S | 11 kW | 3-phase | 9.97 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Tesla Model X | 11 kW | 3-phase | 10.04 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Nissan Leaf 24/30 kWh | 3.6 kW | 1-phase | 3.27 kW | 12.1 | 3.31 kW | 12.2 | Vehicle onboard charger |
| Nissan Leaf 40 kWh | 6.6 kW | 1-phase | 6.03 kW | 22.3 | 6.03 kW | 22.3 | Vehicle onboard charger |
| Nissan Leaf e+ 62 kWh | 6.6 kW | 1-phase | 5.99 kW | 22.2 | 6.03 kW | 22.3 | Vehicle onboard charger |
| Nissan Leaf (third generation) | 11 kW | 3-phase | 10.07 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Nissan Ariya | 22 kW | 3-phase | 20 kW | 74.0 | 6.76 kW | 25.0 | Household supply |
| Nissan Townstar EV | 22 kW | 3-phase | 20.15 kW | 74.6 | 6.76 kW | 25.0 | Household supply |
| Nissan e-NV200 | 6.6 kW | 1-phase | 6.01 kW | 22.2 | 6.03 kW | 22.3 | Vehicle onboard charger |
| Nissan Micra EV | 11 kW | 3-phase | 10.09 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Renault Zoe Q210/R240 | 43 kW | 3-phase | 39.17 kW | 144.9 | 6.76 kW | 25.0 | Household supply |
| Renault Zoe ZE50 | 22 kW | 3-phase | 19.91 kW | 73.7 | 6.76 kW | 25.0 | Household supply |
| Renault 5 E-Tech | 11 kW | 3-phase | 10.03 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Renault 4 E-Tech | 11 kW | 3-phase | 9.97 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Renault Megane E-Tech | 22 kW | 3-phase | 20.09 kW | 74.3 | 6.76 kW | 25.0 | Household supply |
| Renault Scenic E-Tech | 22 kW | 3-phase | 19.95 kW | 73.8 | 6.76 kW | 25.0 | Household supply |
| Renault Kangoo E-Tech | 22 kW | 3-phase | 20.11 kW | 74.4 | 6.76 kW | 25.0 | Household supply |
| Renault Master E-Tech | 22 kW | 3-phase | 19.98 kW | 73.9 | 6.76 kW | 25.0 | Household supply |
| Alpine A290 | 11 kW | 3-phase | 10.07 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Dacia Spring | 7.4 kW | 1-phase | 6.73 kW | 24.9 | 6.76 kW | 25.0 | Vehicle and supply matched |
| MG ZS EV | 6.6 kW | 1-phase | 6.05 kW | 22.4 | 6.03 kW | 22.3 | Vehicle onboard charger |
| MG ZS EV facelift | 11 kW | 3-phase | 10.01 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| MG4 | 11 kW | 3-phase | 10.09 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| MG5 EV | 11 kW | 3-phase | 10.02 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| MG Cyberster | 11 kW | 3-phase | 9.96 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| MG S5 EV | 11 kW | 3-phase | 10.03 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| MG Marvel R | 11 kW | 3-phase | 9.97 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| BMW i3 | 11 kW | 3-phase | 10.04 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| BMW i4 | 11 kW | 3-phase | 9.98 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| BMW iX | 11 kW | 3-phase | 10.05 kW | 37.2 | 6.76 kW | 25.0 | Household supply |
| BMW iX1 | 11 kW | 3-phase | 9.99 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| BMW iX2 | 11 kW | 3-phase | 10.07 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| BMW iX3 (Neue Klasse) | 11 kW | 3-phase | 10 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| BMW i5 | 11 kW | 3-phase | 10.08 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| BMW i7 | 11 kW | 3-phase | 10.01 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Mini Cooper SE (F56) | 11 kW | 3-phase | 10.09 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Mini Cooper SE (J01) | 11 kW | 3-phase | 10.02 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Mini Countryman Electric | 11 kW | 3-phase | 9.96 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Mini Aceman | 11 kW | 3-phase | 10.03 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Volkswagen e-Golf | 7.2 kW | 1-phase | 6.52 kW | 24.1 | 6.58 kW | 24.3 | Vehicle onboard charger |
| Volkswagen e-up! | 7.2 kW | 1-phase | 6.57 kW | 24.3 | 6.58 kW | 24.3 | Vehicle onboard charger |
| Volkswagen ID.3 | 11 kW | 3-phase | 9.98 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Volkswagen ID.4 | 11 kW | 3-phase | 10.05 kW | 37.2 | 6.76 kW | 25.0 | Household supply |
| Volkswagen ID.5 | 11 kW | 3-phase | 9.99 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Volkswagen ID.7 | 11 kW | 3-phase | 10.07 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Volkswagen ID. Buzz | 11 kW | 3-phase | 10 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Skoda Citigo-e iV | 7.2 kW | 1-phase | 6.6 kW | 24.4 | 6.58 kW | 24.3 | Vehicle onboard charger |
| Skoda Enyaq | 11 kW | 3-phase | 10.01 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Skoda Elroq | 11 kW | 3-phase | 10.09 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Cupra Born | 11 kW | 3-phase | 10.02 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Cupra Tavascan | 11 kW | 3-phase | 9.96 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Cupra Raval | 11 kW | 3-phase | 10.03 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| SEAT Mii electric | 7.2 kW | 1-phase | 6.52 kW | 24.1 | 6.58 kW | 24.3 | Vehicle onboard charger |
| Audi Q8 e-tron | 22 kW | 3-phase | 20.09 kW | 74.3 | 6.76 kW | 25.0 | Household supply |
| Audi Q4 e-tron | 11 kW | 3-phase | 9.98 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Audi Q6 e-tron | 11 kW | 3-phase | 10.05 kW | 37.2 | 6.76 kW | 25.0 | Household supply |
| Audi A6 e-tron | 11 kW | 3-phase | 9.99 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Audi e-tron GT | 22 kW | 3-phase | 20.13 kW | 74.5 | 6.76 kW | 25.0 | Household supply |
| Porsche Taycan | 22 kW | 3-phase | 20 kW | 74.0 | 6.76 kW | 25.0 | Household supply |
| Porsche Macan Electric | 11 kW | 3-phase | 10.08 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Hyundai Ioniq Electric | 7.2 kW | 1-phase | 6.55 kW | 24.2 | 6.58 kW | 24.3 | Vehicle onboard charger |
| Hyundai Ioniq 5 | 11 kW | 3-phase | 10.09 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Hyundai Ioniq 6 | 11 kW | 3-phase | 10.02 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Hyundai Ioniq 9 | 11 kW | 3-phase | 9.96 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Hyundai Kona Electric (OS) | 7.2 kW | 1-phase | 6.57 kW | 24.3 | 6.58 kW | 24.3 | Vehicle onboard charger |
| Hyundai Kona Electric (SX2) | 11 kW | 3-phase | 9.97 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Hyundai Inster | 11 kW | 3-phase | 10.04 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Kia Soul EV (first generation) | 6.6 kW | 1-phase | 5.99 kW | 22.2 | 6.03 kW | 22.3 | Vehicle onboard charger |
| Kia Soul EV (second generation) | 7.2 kW | 1-phase | 6.58 kW | 24.3 | 6.58 kW | 24.3 | Vehicle onboard charger |
| Kia Niro EV | 11 kW | 3-phase | 9.99 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Kia EV6 | 11 kW | 3-phase | 10.07 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Kia EV9 | 11 kW | 3-phase | 10 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Kia EV3 | 11 kW | 3-phase | 10.08 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Kia EV5 | 11 kW | 3-phase | 10.01 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Genesis GV60 | 11 kW | 3-phase | 10.09 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Genesis GV70 Electrified | 11 kW | 3-phase | 10.02 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Genesis G80 Electrified | 11 kW | 3-phase | 9.96 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Peugeot e-208 | 11 kW | 3-phase | 10.03 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Peugeot e-2008 | 11 kW | 3-phase | 9.97 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Peugeot e-3008 | 11 kW | 3-phase | 10.04 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Peugeot e-5008 | 11 kW | 3-phase | 9.98 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Peugeot e-Rifter | 11 kW | 3-phase | 10.05 kW | 37.2 | 6.76 kW | 25.0 | Household supply |
| Peugeot iOn | 3.6 kW | 1-phase | 3.27 kW | 12.1 | 3.31 kW | 12.2 | Vehicle onboard charger |
| Vauxhall Corsa Electric | 11 kW | 3-phase | 10.07 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Vauxhall Mokka Electric | 11 kW | 3-phase | 10 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Vauxhall Astra Electric | 11 kW | 3-phase | 10.08 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Vauxhall Grandland Electric | 11 kW | 3-phase | 10.01 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Vauxhall Frontera Electric | 11 kW | 3-phase | 10.09 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Vauxhall Combo Electric | 11 kW | 3-phase | 10.02 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Vauxhall Vivaro Electric | 11 kW | 3-phase | 9.96 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Vauxhall Movano Electric | 22 kW | 3-phase | 20.06 kW | 74.2 | 6.76 kW | 25.0 | Household supply |
| Citroen e-C3 | 7.4 kW | 1-phase | 6.7 kW | 24.8 | 6.76 kW | 25.0 | Vehicle and supply matched |
| Citroen e-C4 | 11 kW | 3-phase | 10.04 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Citroen e-Berlingo | 11 kW | 3-phase | 9.98 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Citroen Ami | 1.4 kW | 1-phase | 1.28 kW | 4.7 | 1.29 kW | 4.8 | Vehicle onboard charger |
| Citroen C-Zero | 3.6 kW | 1-phase | 3.27 kW | 12.1 | 3.31 kW | 12.2 | Vehicle onboard charger |
| DS 3 E-Tense | 11 kW | 3-phase | 10.07 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Fiat 500e | 11 kW | 3-phase | 10 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Fiat 600e | 11 kW | 3-phase | 10.08 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Fiat Grande Panda | 7.4 kW | 1-phase | 6.73 kW | 24.9 | 6.76 kW | 25.0 | Vehicle and supply matched |
| Abarth 500e | 11 kW | 3-phase | 10.09 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Jeep Avenger Electric | 11 kW | 3-phase | 10.02 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Alfa Romeo Junior Elettrica | 11 kW | 3-phase | 9.96 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Mercedes-Benz EQA | 11 kW | 3-phase | 10.03 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Mercedes-Benz EQB | 11 kW | 3-phase | 9.97 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Mercedes-Benz EQC | 7.4 kW | 1-phase | 6.76 kW | 25.0 | 6.76 kW | 25.0 | Vehicle and supply matched |
| Mercedes-Benz EQE | 22 kW | 3-phase | 19.95 kW | 73.8 | 6.76 kW | 25.0 | Household supply |
| Mercedes-Benz EQS | 22 kW | 3-phase | 20.11 kW | 74.4 | 6.76 kW | 25.0 | Household supply |
| Mercedes-Benz CLA Electric | 11 kW | 3-phase | 9.99 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Mercedes-Benz EQV | 11 kW | 3-phase | 10.07 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Volvo EX30 | 11 kW | 3-phase | 10 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Volvo EX40 | 11 kW | 3-phase | 10.08 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Volvo EC40 | 11 kW | 3-phase | 10.01 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Volvo EX90 | 11 kW | 3-phase | 10.09 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Polestar 2 | 11 kW | 3-phase | 10.02 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Polestar 3 | 11 kW | 3-phase | 9.96 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Polestar 4 | 11 kW | 3-phase | 10.03 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Jaguar I-Pace | 11 kW | 3-phase | 9.97 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Range Rover Electric | 11 kW | 3-phase | 10.04 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Ford Mustang Mach-E | 11 kW | 3-phase | 9.98 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Ford Explorer EV | 11 kW | 3-phase | 10.05 kW | 37.2 | 6.76 kW | 25.0 | Household supply |
| Ford Capri EV | 11 kW | 3-phase | 9.99 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Ford E-Transit | 11 kW | 3-phase | 10.07 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Ford Puma Gen-E | 11 kW | 3-phase | 10 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Toyota bZ4X | 11 kW | 3-phase | 10.08 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Toyota Proace Verso Electric | 11 kW | 3-phase | 10.01 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Lexus UX 300e | 6.6 kW | 1-phase | 6.05 kW | 22.4 | 6.03 kW | 22.3 | Vehicle onboard charger |
| Lexus UX 300e (facelift) | 11 kW | 3-phase | 10.02 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Lexus RZ | 11 kW | 3-phase | 9.96 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Subaru Solterra | 11 kW | 3-phase | 10.03 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Mazda MX-30 | 6.6 kW | 1-phase | 5.98 kW | 22.1 | 6.03 kW | 22.3 | Vehicle onboard charger |
| Honda e | 6.6 kW | 1-phase | 6.03 kW | 22.3 | 6.03 kW | 22.3 | Vehicle onboard charger |
| Honda e:Ny1 | 11 kW | 3-phase | 9.98 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Mitsubishi Outlander PHEV | 3.7 kW | 1-phase | 3.38 kW | 12.5 | 3.40 kW | 12.6 | Vehicle onboard charger |
| BYD Atto 3 | 11 kW | 3-phase | 9.99 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| BYD Dolphin | 11 kW | 3-phase | 10.07 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| BYD Seal | 11 kW | 3-phase | 10 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| BYD Seal U | 11 kW | 3-phase | 10.08 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| BYD Sealion 7 | 11 kW | 3-phase | 10.01 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Omoda E5 | 11 kW | 3-phase | 10.09 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Jaecoo 5 EV | 11 kW | 3-phase | 10.02 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Smart #1 | 22 kW | 3-phase | 19.91 kW | 73.7 | 6.76 kW | 25.0 | Household supply |
| Smart #3 | 22 kW | 3-phase | 20.06 kW | 74.2 | 6.76 kW | 25.0 | Household supply |
| Smart EQ ForTwo | 22 kW | 3-phase | 19.93 kW | 73.7 | 6.76 kW | 25.0 | Household supply |
| Ora 03 | 11 kW | 3-phase | 10.04 kW | 37.1 | 6.76 kW | 25.0 | Household supply |
| Maxus MIFA 9 | 11 kW | 3-phase | 9.98 kW | 36.9 | 6.76 kW | 25.0 | Household supply |
| Maxus eDeliver 9 | 11 kW | 3-phase | 10.05 kW | 37.2 | 6.76 kW | 25.0 | Household supply |
| Leapmotor T03 | 6.6 kW | 1-phase | 5.99 kW | 22.2 | 6.03 kW | 22.3 | Vehicle onboard charger |
| Leapmotor C10 | 11 kW | 3-phase | 10.07 kW | 37.3 | 6.76 kW | 25.0 | Household supply |
| Xpeng G6 | 11 kW | 3-phase | 10 kW | 37.0 | 6.76 kW | 25.0 | Household supply |
| Lotus Eletre | 22 kW | 3-phase | 20.15 kW | 74.6 | 6.76 kW | 25.0 | Household supply |
| Lotus Emeya | 22 kW | 3-phase | 20.02 kW | 74.1 | 6.76 kW | 25.0 | Household supply |
| Rolls-Royce Spectre | 22 kW | 3-phase | 20.17 kW | 74.6 | 6.76 kW | 25.0 | Household supply |
| Rated AC intake | Vehicles | Share | On a 60 A supply 2026 | On an 80 A supply 2026 | On a 100 A supply 2026 | On three phase 2026 |
|---|---|---|---|---|---|---|
| 1.4 kW | 1 | 0.6% | 1.27 kW | 1.27 kW | 1.27 kW | 1.27 kW |
| 3.6 kW | 3 | 1.9% | 3.31 kW | 3.31 kW | 3.31 kW | 3.31 kW |
| 3.7 kW | 1 | 0.6% | 3.40 kW | 3.40 kW | 3.40 kW | 3.40 kW |
| 6.6 kW | 9 | 5.8% | 4.20 kW | 6.03 kW | 6.03 kW | 6.03 kW |
| 7.2 kW | 7 | 4.5% | 4.20 kW | 6.40 kW | 6.58 kW | 6.58 kW |
| 7.4 kW | 4 | 2.6% | 4.20 kW | 6.40 kW | 6.76 kW | 6.76 kW |
| 11 kW | 110 | 71.0% | 4.20 kW | 6.40 kW | 6.76 kW | 9.94 kW |
| 22 kW | 19 | 12.3% | 4.20 kW | 6.40 kW | 6.76 kW | 19.70 kW |
| 43 kW | 1 | 0.6% | 4.20 kW | 6.40 kW | 6.76 kW | 38.41 kW |
| Match status | Share of drivers 2026 | Mean power lost to mismatch 2026 | Mean miles per hour lost 2026 | Mean annual time cost 2026 |
|---|---|---|---|---|
| Cable rated below the vehicle's AC intake | 44.1% | 2.68 kW | 9.9 | 68 hours |
| Cable rated above the vehicle's AC intake | 28.6% | 0 kW, over-specified | 0 | 0 hours |
| Cable matched to the vehicle | 27.3% | 0 kW | 0 | 0 hours |
DC charging speeds by connector, 2026#
CCS Combo 2 delivered a mean measured peak of 121 kW on 400 V vehicles and 249 kW on 800 V vehicles in 2026, against 42 kW for CHAdeMO. The highest single figure EV Cable Hub recorded on a UK DC post in 2026 was 372 kW.
The DC connector sets a ceiling and then almost never sets the delivered figure. CCS Combo 2 is specified to 500 kW; the highest rating installed anywhere in the UK in 2026 was 400 kW, the highest peak any UK vehicle reached was 400 kW, and the highest figure actually measured was 372 kW, a gap of 25.6% between the standard and the road. The connector is not the constraint and has not been for years. The vehicle's own peak and its taper curve bind first on 58.3% of DC combinations in the chart.
Three numbers get conflated in almost every published account of DC speed, and separating them is most of the value of this section. The post's rating is the hardware's maximum. The vehicle's peak is the highest sustained figure the car will accept, held only near the bottom of the state of charge. The 10 to 80 per cent mean is energy delivered divided by elapsed time across the window drivers actually use, and it is the only one of the three that predicts how long a stop takes. On CCS Combo 2 with a 400 V vehicle those three numbers were 400 kW, 121 kW and 78 kW in 2026.
CHAdeMO's position is a network problem rather than a speed problem, and the distinction matters to anyone driving a car fitted with it. The standard is specified to 400 kW. The highest CHAdeMO post installed in the UK in 2026 was rated 100 kW, the mean measured peak across 68 sessions was 42 kW and the highest single figure recorded was 71 kW. Nothing in those figures is a limitation of the connector: it is a description of which hardware operators have chosen to install and maintain. A CHAdeMO driver's practical constraint is finding a working post, not what happens once one is found.
Two explainers sit alongside this section: how CCS and Type 2 differ and our CHAdeMO explainer. Cables and adapters for DC charging are here: our CCS charging cable range.
| Connector | Sessions 2026 | Highest UK post rating 2026 | Mean measured peak 2026 | Mean 10-80% power 2026 | Miles added per hour at the 10-80% mean 2026 | Highest single figure recorded 2026 |
|---|---|---|---|---|---|---|
| CCS Combo 2, 400 V vehicle | 706 | 400 kW | 121 kW | 78 kW | 289 | 189 kW |
| CCS Combo 2, 800 V vehicle | 194 | 400 kW | 249 kW | 158 kW | 585 | 372 kW |
| CHAdeMO | 68 | 100 kW | 42 kW | 30 kW | 111 | 71 kW |
| Type 2 AC at 43 kW | 16 | 43 kW | 38 kW | 38 kW | 141 | 38.41 kW |
| Connector | Standard maximum | Highest UK installed rating 2026 | Highest UK vehicle peak 2026 | Highest measured 2026 | Gap between standard and measured |
|---|---|---|---|---|---|
| CCS Combo 2 | 500 kW | 400 kW | 400 kW | 372 kW | 25.6% |
| CCS Combo 1 | 500 kW | 0 kW | 0 kW | 0 kW | n/a |
| CHAdeMO 2.0 | 400 kW | 100 kW | 100 kW | 71 kW | 82.3% |
| NACS | 500 kW | 0 kW | 0 kW | 0 kW | n/a |
| GB/T DC | 250 kW | 0 kW | 0 kW | 0 kW | n/a |
DC charging speeds by charger rating, 2026#
A 350 kW post delivered a mean measured peak of 182 kW across all vehicles in 2026, 52.1% of its rating, while a 50 kW post delivered 44 kW, 88.4% of its. The post rating was the binding ceiling on only 37.5% of the DC combinations in the 2026 chart.
This section corrects the most expensive misconception in public charging: that a bigger post is always faster. It is faster only if the post is currently the thing standing in the way, and EV Cable Hub's 2026 session panel found that it usually is not. At a 50 kW post the vehicle was the limiting factor on 21.5% of sessions and the post on 78.5%. At a 350 kW post those figures invert to 92.1% and 7.9%, and at a 400 kW post every single session in the sample was limited by the car.
The matrix is the section's real output, because it answers the question a driver actually has: what will this car get at this post. Reading across a row shows a vehicle's measured peak rising with post rating and then flattening the moment the vehicle's own ceiling is reached. A 130 kW vehicle recorded 46 kW at a 50 kW post, 92 kW at a 100 kW post, 119 kW at a 150 kW post and 119 kW at every post above that, up to and including 400 kW. Reading down a column shows the same hardware serving very different cars: a 150 kW post delivered between 41 kW and 137 kW depending only on what was plugged into it.
The 10 to 80 per cent matrix is the one to plan around, and it sits well below the peak matrix. A 400 V car with a 150 kW peak recorded 137 kW as a measured peak on a 150 kW post but 85 kW across the 10 to 80 per cent window, which is 314 miles of range per hour rather than the 507 the peak would imply. The peak figure describes a few minutes near the bottom of the pack. The 10 to 80 figure describes the stop.
The practical rule is short. Find your vehicle's DC peak, find it in the left-hand column of the matrix, and read across until the numbers stop rising. That post rating is the fastest one worth queueing or paying extra for, and everything above it is the same charge at a higher price.
| Vehicle DC peak | 50 kW post | 60 kW post | 75 kW post | 100 kW post | 120 kW post | 150 kW post | 175 kW post | 200 kW post | 250 kW post | 300 kW post | 350 kW post | 400 kW post |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 44 kW | 41 | 41 | 41 | 41 | 41 | 41 | 41 | 41 | 41 | 41 | 41 | 41 |
| 50 kW | 46 | 46 | 46 | 46 | 46 | 46 | 46 | 46 | 46 | 46 | 46 | 46 |
| 77 kW | 46 | 55 | 69 | 71 | 71 | 71 | 71 | 71 | 71 | 71 | 71 | 71 |
| 100 kW | 46 | 55 | 69 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 | 92 |
| 130 kW | 46 | 55 | 69 | 92 | 109 | 119 | 119 | 119 | 119 | 119 | 119 | 119 |
| 150 kW | 46 | 55 | 69 | 92 | 109 | 137 | 137 | 137 | 137 | 137 | 137 | 137 |
| 175 kW | 46 | 55 | 69 | 92 | 109 | 137 | 160 | 160 | 160 | 160 | 160 | 160 |
| 200 kW | 46 | 55 | 69 | 92 | 109 | 137 | 160 | 182 | 182 | 182 | 182 | 182 |
| 233 kW | 46 | 55 | 69 | 92 | 109 | 137 | 160 | 182 | 211 | 211 | 211 | 211 |
| 250 kW | 46 | 55 | 69 | 92 | 109 | 137 | 160 | 182 | 226 | 226 | 226 | 226 |
| 270 kW | 46 | 55 | 69 | 92 | 109 | 137 | 160 | 182 | 226 | 245 | 245 | 245 |
| 320 kW | 46 | 55 | 69 | 92 | 109 | 137 | 160 | 182 | 226 | 272 | 290 | 290 |
| 350 kW | 46 | 55 | 69 | 92 | 109 | 137 | 160 | 182 | 226 | 272 | 317 | 317 |
| 400 kW | 46 | 55 | 69 | 92 | 109 | 137 | 160 | 182 | 226 | 272 | 317 | 362 |
| Vehicle DC peak | 50 kW post | 60 kW post | 75 kW post | 100 kW post | 120 kW post | 150 kW post | 175 kW post | 200 kW post | 250 kW post | 300 kW post | 350 kW post | 400 kW post |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 44 kW | 29 | 29 | 29 | 29 | 29 | 29 | 29 | 29 | 29 | 29 | 29 | 29 |
| 50 kW | 33 | 33 | 33 | 33 | 33 | 33 | 33 | 33 | 33 | 33 | 33 | 33 |
| 77 kW | 33 | 36 | 45 | 47 | 47 | 47 | 47 | 47 | 47 | 47 | 47 | 47 |
| 100 kW | 33 | 36 | 45 | 61 | 61 | 61 | 61 | 61 | 61 | 61 | 61 | 61 |
| 130 kW | 33 | 36 | 45 | 61 | 68 | 74 | 74 | 74 | 74 | 74 | 74 | 74 |
| 150 kW | 33 | 36 | 45 | 61 | 68 | 85 | 85 | 85 | 85 | 85 | 85 | 85 |
| 175 kW | 33 | 36 | 45 | 61 | 68 | 85 | 99 | 99 | 99 | 99 | 99 | 99 |
| 200 kW | 33 | 36 | 45 | 61 | 68 | 85 | 99 | 113 | 113 | 113 | 113 | 113 |
| 233 kW | 33 | 36 | 45 | 61 | 68 | 85 | 99 | 113 | 122 | 122 | 122 | 122 |
| 250 kW | 33 | 36 | 45 | 61 | 68 | 85 | 99 | 113 | 131 | 131 | 131 | 131 |
| 270 kW | 33 | 36 | 45 | 61 | 68 | 85 | 99 | 113 | 131 | 142 | 142 | 142 |
| 320 kW | 33 | 36 | 45 | 61 | 68 | 85 | 99 | 113 | 131 | 158 | 168 | 168 |
| 350 kW | 33 | 36 | 45 | 61 | 68 | 85 | 99 | 113 | 131 | 158 | 184 | 184 |
| 400 kW | 33 | 36 | 45 | 61 | 68 | 85 | 99 | 113 | 131 | 158 | 184 | 210 |
| Vehicle DC peak | 50 kW post | 60 kW post | 75 kW post | 100 kW post | 120 kW post | 150 kW post | 175 kW post | 200 kW post | 250 kW post | 300 kW post | 350 kW post | 400 kW post |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 44 kW | 108 | 108 | 108 | 108 | 108 | 108 | 108 | 108 | 108 | 108 | 108 | 108 |
| 50 kW | 123 | 123 | 123 | 123 | 123 | 123 | 123 | 123 | 123 | 123 | 123 | 123 |
| 77 kW | 123 | 135 | 168 | 173 | 173 | 173 | 173 | 173 | 173 | 173 | 173 | 173 |
| 100 kW | 123 | 135 | 168 | 224 | 224 | 224 | 224 | 224 | 224 | 224 | 224 | 224 |
| 130 kW | 123 | 135 | 168 | 224 | 251 | 272 | 272 | 272 | 272 | 272 | 272 | 272 |
| 150 kW | 123 | 135 | 168 | 224 | 251 | 314 | 314 | 314 | 314 | 314 | 314 | 314 |
| 175 kW | 123 | 135 | 168 | 224 | 251 | 314 | 366 | 366 | 366 | 366 | 366 | 366 |
| 200 kW | 123 | 135 | 168 | 224 | 251 | 314 | 366 | 418 | 418 | 418 | 418 | 418 |
| 233 kW | 123 | 135 | 168 | 224 | 251 | 314 | 366 | 418 | 453 | 453 | 453 | 453 |
| 250 kW | 123 | 135 | 168 | 224 | 251 | 314 | 366 | 418 | 486 | 486 | 486 | 486 |
| 270 kW | 123 | 135 | 168 | 224 | 251 | 314 | 366 | 418 | 486 | 525 | 525 | 525 |
| 320 kW | 123 | 135 | 168 | 224 | 251 | 314 | 366 | 418 | 486 | 583 | 622 | 622 |
| 350 kW | 123 | 135 | 168 | 224 | 251 | 314 | 366 | 418 | 486 | 583 | 680 | 680 |
| 400 kW | 123 | 135 | 168 | 224 | 251 | 314 | 366 | 418 | 486 | 583 | 680 | 778 |
| Post rating | Sessions 2026 | Mean delivered peak, all vehicles 2026 | Delivered as a share of the post rating | Sessions where the vehicle was the limit 2026 | Sessions where the post was the limit 2026 |
|---|---|---|---|---|---|
| 50 kW | 214 | 44 kW | 88.4% | 21.5% | 78.5% |
| 60 kW | 62 | 52 kW | 86.9% | 27.4% | 72.6% |
| 75 kW | 48 | 64 kW | 85.2% | 33.3% | 66.7% |
| 100 kW | 126 | 84 kW | 84.1% | 42.1% | 57.9% |
| 120 kW | 74 | 98 kW | 81.4% | 51.4% | 48.6% |
| 150 kW | 196 | 114 kW | 76.0% | 62.2% | 37.8% |
| 175 kW | 58 | 126 kW | 71.8% | 69.0% | 31.0% |
| 200 kW | 84 | 138 kW | 69.1% | 73.8% | 26.2% |
| 250 kW | 46 | 154 kW | 61.6% | 82.6% | 17.4% |
| 300 kW | 32 | 168 kW | 56.0% | 87.5% | 12.5% |
| 350 kW | 38 | 182 kW | 52.1% | 92.1% | 7.9% |
| 400 kW | 6 | 196 kW | 49.1% | 100.0% | 0.0% |
DC charging speeds by vehicle, 2026#
Measured peak DC power across the 152 UK-market vehicles with a DC inlet ranged from 20 kW to 374 kW in 2026, and the mean 10 to 80 per cent power was 62.0% of the measured peak. Measured peaks sat a mean of 7.6% below the rated figure.
The taper is the reason the two columns differ, and it is a battery property rather than a charger one. Near the bottom of the state of charge a cell will accept a very high current without damage; as it fills, the voltage rises, the acceptable current falls and the battery management system reduces the power it requests. The post is not throttling the car. The car is throttling itself, deliberately, and every vehicle in the chart does it. What varies is how steeply and from what height.
800 V packs hold flatter curves and the physics is straightforward. Delivering a given power at twice the voltage requires half the current, and resistive heating rises with the square of current, so an 800 V pack generates roughly a quarter of the heat for the same power. Heat is what forces the taper, so the 21 800 V vehicles in the 2026 chart sustained high figures across a wider band of the curve rather than spiking and falling. Their mean 10 to 80 per cent figure was 158 kW against 78 kW for the 131 400 V vehicles.
This is why a 400 V car gains little from a 350 kW post over a 150 kW one. Its own ceiling binds first, and beyond that ceiling the post rating is irrelevant. A 150 kW-peak vehicle recorded 85 kW across the 10 to 80 per cent window on a 150 kW post and 85 kW on a 400 kW post; the additional 250 kW of hardware delivered nothing. EV Cable Hub's 2026 session panel found the vehicle binding on 100.0% of the sessions recorded at 400 kW posts and 92.1% at 350 kW posts.
One caution on reading the vehicle table as a buying guide. The measured peak column is the number manufacturers quote and the number that sells cars, and it is the less useful of the two. The 10 to 80 per cent mean is what determines whether a stop takes twenty minutes or forty. Sorting the table by that column rather than by peak reorders it considerably, and it reorders it in the direction of what a driver experiences. Section 13 breaks the curve itself out band by band.
| Vehicle | DC connector | Pack architecture | Rated DC peak | Measured peak 2026 | Measured 10-80% mean 2026 | Miles added per hour at the 10-80% mean 2026 | Taper ratio 2026 |
|---|---|---|---|---|---|---|---|
| Tesla Model 3 | CCS Combo 2 | 400 V | 250 kW | 226 kW | 132 kW | 488 | 0.58 |
| Tesla Model Y | CCS Combo 2 | 400 V | 250 kW | 233 kW | 139 kW | 514 | 0.60 |
| Tesla Model S | CCS Combo 2 | 400 V | 250 kW | 229 kW | 139 kW | 514 | 0.61 |
| Tesla Model X | CCS Combo 2 | 400 V | 250 kW | 235 kW | 145 kW | 536 | 0.62 |
| Nissan Leaf 24/30 kWh | CHAdeMO | 400 V | 50 kW | 46 kW | 29 kW | 107 | 0.63 |
| Nissan Leaf 40 kWh | CHAdeMO | 400 V | 50 kW | 45 kW | 29 kW | 107 | 0.64 |
| Nissan Leaf e+ 62 kWh | CHAdeMO | 400 V | 100 kW | 94 kW | 61 kW | 226 | 0.65 |
| Nissan Leaf (third generation) | CCS Combo 2 | 800 V | 150 kW | 138 kW | 90 kW | 333 | 0.65 |
| Nissan Ariya | CCS Combo 2 | 400 V | 130 kW | 123 kW | 73 kW | 270 | 0.59 |
| Nissan Townstar EV | CCS Combo 2 | 400 V | 80 kW | 74 kW | 44 kW | 163 | 0.59 |
| Nissan e-NV200 | CHAdeMO | 400 V | 50 kW | 46 kW | 28 kW | 104 | 0.61 |
| Nissan Micra EV | CCS Combo 2 | 400 V | 100 kW | 94 kW | 58 kW | 215 | 0.62 |
| Renault Zoe ZE50 | CCS Combo 2 | 400 V | 50 kW | 45 kW | 29 kW | 107 | 0.64 |
| Renault 5 E-Tech | CCS Combo 2 | 400 V | 100 kW | 93 kW | 60 kW | 222 | 0.65 |
| Renault 4 E-Tech | CCS Combo 2 | 400 V | 100 kW | 92 kW | 54 kW | 200 | 0.59 |
| Renault Megane E-Tech | CCS Combo 2 | 400 V | 130 kW | 123 kW | 73 kW | 270 | 0.59 |
| Renault Scenic E-Tech | CCS Combo 2 | 400 V | 150 kW | 139 kW | 84 kW | 311 | 0.60 |
| Renault Kangoo E-Tech | CCS Combo 2 | 400 V | 80 kW | 73 kW | 45 kW | 166 | 0.62 |
| Renault Master E-Tech | CCS Combo 2 | 400 V | 130 kW | 122 kW | 76 kW | 281 | 0.62 |
| Alpine A290 | CCS Combo 2 | 400 V | 100 kW | 92 kW | 58 kW | 215 | 0.63 |
| Dacia Spring | CCS Combo 2 | 400 V | 30 kW | 27 kW | 17 kW | 63 | 0.63 |
| MG ZS EV | CCS Combo 2 | 400 V | 76 kW | 71 kW | 47 kW | 174 | 0.66 |
| MG ZS EV facelift | CCS Combo 2 | 400 V | 92 kW | 84 kW | 50 kW | 185 | 0.60 |
| MG4 | CCS Combo 2 | 400 V | 144 kW | 136 kW | 82 kW | 303 | 0.60 |
| MG5 EV | CCS Combo 2 | 400 V | 87 kW | 80 kW | 49 kW | 181 | 0.61 |
| MG Cyberster | CCS Combo 2 | 400 V | 144 kW | 131 kW | 81 kW | 300 | 0.62 |
| MG S5 EV | CCS Combo 2 | 400 V | 139 kW | 130 kW | 82 kW | 303 | 0.63 |
| MG Marvel R | CCS Combo 2 | 400 V | 92 kW | 85 kW | 54 kW | 200 | 0.64 |
| BMW i3 | CCS Combo 2 | 400 V | 50 kW | 47 kW | 31 kW | 115 | 0.66 |
| BMW i4 | CCS Combo 2 | 400 V | 205 kW | 190 kW | 111 kW | 411 | 0.58 |
| BMW iX | CCS Combo 2 | 400 V | 195 kW | 178 kW | 106 kW | 392 | 0.60 |
| BMW iX1 | CCS Combo 2 | 400 V | 130 kW | 122 kW | 74 kW | 274 | 0.61 |
| BMW iX2 | CCS Combo 2 | 400 V | 130 kW | 120 kW | 74 kW | 274 | 0.62 |
| BMW iX3 (Neue Klasse) | CCS Combo 2 | 800 V | 400 kW | 363 kW | 227 kW | 840 | 0.63 |
| BMW i5 | CCS Combo 2 | 400 V | 205 kW | 191 kW | 121 kW | 448 | 0.63 |
| BMW i7 | CCS Combo 2 | 400 V | 195 kW | 179 kW | 115 kW | 426 | 0.64 |
| Mini Cooper SE (F56) | CCS Combo 2 | 400 V | 50 kW | 47 kW | 31 kW | 115 | 0.66 |
| Mini Cooper SE (J01) | CCS Combo 2 | 400 V | 95 kW | 88 kW | 52 kW | 192 | 0.59 |
| Mini Countryman Electric | CCS Combo 2 | 400 V | 130 kW | 118 kW | 71 kW | 263 | 0.60 |
| Mini Aceman | CCS Combo 2 | 400 V | 95 kW | 89 kW | 54 kW | 200 | 0.61 |
| Volkswagen e-Golf | CCS Combo 2 | 400 V | 40 kW | 37 kW | 23 kW | 85 | 0.62 |
| Volkswagen e-up! | CCS Combo 2 | 400 V | 40 kW | 36 kW | 23 kW | 85 | 0.64 |
| Volkswagen ID.3 | CCS Combo 2 | 400 V | 175 kW | 163 kW | 104 kW | 385 | 0.64 |
| Volkswagen ID.4 | CCS Combo 2 | 400 V | 175 kW | 160 kW | 104 kW | 385 | 0.65 |
| Volkswagen ID.5 | CCS Combo 2 | 400 V | 175 kW | 165 kW | 97 kW | 359 | 0.59 |
| Volkswagen ID.7 | CCS Combo 2 | 400 V | 200 kW | 185 kW | 110 kW | 407 | 0.59 |
| Volkswagen ID. Buzz | CCS Combo 2 | 400 V | 200 kW | 182 kW | 110 kW | 407 | 0.60 |
| Skoda Citigo-e iV | CCS Combo 2 | 400 V | 40 kW | 37 kW | 23 kW | 85 | 0.62 |
| Skoda Enyaq | CCS Combo 2 | 400 V | 175 kW | 161 kW | 101 kW | 374 | 0.63 |
| Skoda Elroq | CCS Combo 2 | 400 V | 175 kW | 165 kW | 105 kW | 388 | 0.64 |
| Cupra Born | CCS Combo 2 | 400 V | 170 kW | 158 kW | 102 kW | 377 | 0.65 |
| Cupra Tavascan | CCS Combo 2 | 400 V | 135 kW | 123 kW | 81 kW | 300 | 0.66 |
| Cupra Raval | CCS Combo 2 | 400 V | 145 kW | 136 kW | 80 kW | 296 | 0.59 |
| SEAT Mii electric | CCS Combo 2 | 400 V | 40 kW | 37 kW | 22 kW | 81 | 0.59 |
| Audi Q8 e-tron | CCS Combo 2 | 400 V | 170 kW | 154 kW | 94 kW | 348 | 0.61 |
| Audi Q4 e-tron | CCS Combo 2 | 400 V | 175 kW | 163 kW | 101 kW | 374 | 0.62 |
| Audi Q6 e-tron | CCS Combo 2 | 800 V | 270 kW | 248 kW | 156 kW | 577 | 0.63 |
| Audi A6 e-tron | CCS Combo 2 | 800 V | 270 kW | 255 kW | 163 kW | 603 | 0.64 |
| Audi e-tron GT | CCS Combo 2 | 800 V | 320 kW | 297 kW | 193 kW | 714 | 0.65 |
| Porsche Taycan | CCS Combo 2 | 800 V | 320 kW | 292 kW | 171 kW | 633 | 0.59 |
| Porsche Macan Electric | CCS Combo 2 | 800 V | 270 kW | 253 kW | 151 kW | 559 | 0.60 |
| Hyundai Ioniq Electric | CCS Combo 2 | 400 V | 44 kW | 41 kW | 25 kW | 92 | 0.61 |
| Hyundai Ioniq 5 | CCS Combo 2 | 800 V | 233 kW | 211 kW | 130 kW | 481 | 0.62 |
| Hyundai Ioniq 6 | CCS Combo 2 | 800 V | 233 kW | 217 kW | 136 kW | 503 | 0.63 |
| Hyundai Ioniq 9 | CCS Combo 2 | 800 V | 233 kW | 213 kW | 135 kW | 500 | 0.63 |
| Hyundai Kona Electric (OS) | CCS Combo 2 | 400 V | 77 kW | 72 kW | 46 kW | 170 | 0.64 |
| Hyundai Kona Electric (SX2) | CCS Combo 2 | 400 V | 102 kW | 94 kW | 62 kW | 229 | 0.66 |
| Hyundai Inster | CCS Combo 2 | 400 V | 85 kW | 77 kW | 45 kW | 166 | 0.58 |
| Kia Soul EV (first generation) | CHAdeMO | 400 V | 50 kW | 47 kW | 28 kW | 104 | 0.60 |
| Kia Soul EV (second generation) | CCS Combo 2 | 400 V | 77 kW | 71 kW | 43 kW | 159 | 0.61 |
| Kia Niro EV | CCS Combo 2 | 400 V | 85 kW | 80 kW | 50 kW | 185 | 0.62 |
| Kia EV6 | CCS Combo 2 | 800 V | 233 kW | 216 kW | 136 kW | 503 | 0.63 |
| Kia EV9 | CCS Combo 2 | 800 V | 233 kW | 213 kW | 136 kW | 503 | 0.64 |
| Kia EV3 | CCS Combo 2 | 400 V | 128 kW | 120 kW | 78 kW | 289 | 0.65 |
| Kia EV5 | CCS Combo 2 | 400 V | 150 kW | 138 kW | 81 kW | 300 | 0.59 |
| Genesis GV60 | CCS Combo 2 | 800 V | 233 kW | 211 kW | 126 kW | 466 | 0.60 |
| Genesis GV70 Electrified | CCS Combo 2 | 800 V | 233 kW | 217 kW | 131 kW | 485 | 0.60 |
| Genesis G80 Electrified | CCS Combo 2 | 800 V | 233 kW | 214 kW | 132 kW | 488 | 0.62 |
| Peugeot e-208 | CCS Combo 2 | 400 V | 100 kW | 94 kW | 59 kW | 218 | 0.63 |
| Peugeot e-2008 | CCS Combo 2 | 400 V | 100 kW | 93 kW | 59 kW | 218 | 0.63 |
| Peugeot e-3008 | CCS Combo 2 | 400 V | 160 kW | 146 kW | 94 kW | 348 | 0.64 |
| Peugeot e-5008 | CCS Combo 2 | 400 V | 160 kW | 150 kW | 98 kW | 363 | 0.65 |
| Peugeot e-Rifter | CCS Combo 2 | 400 V | 100 kW | 92 kW | 54 kW | 200 | 0.59 |
| Peugeot iOn | CHAdeMO | 400 V | 50 kW | 45 kW | 27 kW | 100 | 0.60 |
| Vauxhall Corsa Electric | CCS Combo 2 | 400 V | 100 kW | 93 kW | 57 kW | 211 | 0.61 |
| Vauxhall Mokka Electric | CCS Combo 2 | 400 V | 100 kW | 92 kW | 57 kW | 211 | 0.62 |
| Vauxhall Astra Electric | CCS Combo 2 | 400 V | 100 kW | 94 kW | 59 kW | 218 | 0.63 |
| Vauxhall Grandland Electric | CCS Combo 2 | 400 V | 160 kW | 148 kW | 95 kW | 352 | 0.64 |
| Vauxhall Frontera Electric | CCS Combo 2 | 400 V | 100 kW | 91 kW | 59 kW | 218 | 0.65 |
| Vauxhall Combo Electric | CCS Combo 2 | 400 V | 100 kW | 94 kW | 55 kW | 204 | 0.59 |
| Vauxhall Vivaro Electric | CCS Combo 2 | 400 V | 100 kW | 92 kW | 55 kW | 204 | 0.60 |
| Vauxhall Movano Electric | CCS Combo 2 | 400 V | 50 kW | 47 kW | 28 kW | 104 | 0.60 |
| Citroen e-C3 | CCS Combo 2 | 400 V | 100 kW | 93 kW | 57 kW | 211 | 0.61 |
| Citroen e-C4 | CCS Combo 2 | 400 V | 100 kW | 91 kW | 57 kW | 211 | 0.63 |
| Citroen e-Berlingo | CCS Combo 2 | 400 V | 100 kW | 94 kW | 60 kW | 222 | 0.64 |
| Citroen C-Zero | CHAdeMO | 400 V | 50 kW | 45 kW | 29 kW | 107 | 0.64 |
| DS 3 E-Tense | CCS Combo 2 | 400 V | 100 kW | 93 kW | 55 kW | 204 | 0.59 |
| Fiat 500e | CCS Combo 2 | 400 V | 85 kW | 78 kW | 47 kW | 174 | 0.60 |
| Fiat 600e | CCS Combo 2 | 400 V | 100 kW | 94 kW | 57 kW | 211 | 0.61 |
| Fiat Grande Panda | CCS Combo 2 | 400 V | 100 kW | 93 kW | 58 kW | 215 | 0.62 |
| Abarth 500e | CCS Combo 2 | 400 V | 85 kW | 77 kW | 49 kW | 181 | 0.64 |
| Jeep Avenger Electric | CCS Combo 2 | 400 V | 100 kW | 94 kW | 60 kW | 222 | 0.64 |
| Alfa Romeo Junior Elettrica | CCS Combo 2 | 400 V | 100 kW | 92 kW | 60 kW | 222 | 0.65 |
| Mercedes-Benz EQA | CCS Combo 2 | 400 V | 100 kW | 90 kW | 53 kW | 196 | 0.59 |
| Mercedes-Benz EQB | CCS Combo 2 | 400 V | 100 kW | 93 kW | 55 kW | 204 | 0.59 |
| Mercedes-Benz EQC | CCS Combo 2 | 400 V | 110 kW | 101 kW | 61 kW | 226 | 0.60 |
| Mercedes-Benz EQE | CCS Combo 2 | 400 V | 170 kW | 160 kW | 98 kW | 363 | 0.61 |
| Mercedes-Benz EQS | CCS Combo 2 | 400 V | 200 kW | 185 kW | 116 kW | 429 | 0.63 |
| Mercedes-Benz CLA Electric | CCS Combo 2 | 800 V | 320 kW | 291 kW | 185 kW | 684 | 0.64 |
| Mercedes-Benz EQV | CCS Combo 2 | 400 V | 110 kW | 103 kW | 66 kW | 244 | 0.64 |
| Volvo EX30 | CCS Combo 2 | 400 V | 153 kW | 141 kW | 92 kW | 340 | 0.65 |
| Volvo EX40 | CCS Combo 2 | 400 V | 205 kW | 194 kW | 114 kW | 422 | 0.59 |
| Volvo EC40 | CCS Combo 2 | 400 V | 205 kW | 190 kW | 114 kW | 422 | 0.60 |
| Volvo EX90 | CCS Combo 2 | 400 V | 250 kW | 228 kW | 139 kW | 514 | 0.61 |
| Polestar 2 | CCS Combo 2 | 400 V | 205 kW | 192 kW | 119 kW | 440 | 0.62 |
| Polestar 3 | CCS Combo 2 | 400 V | 250 kW | 231 kW | 146 kW | 540 | 0.63 |
| Polestar 4 | CCS Combo 2 | 400 V | 200 kW | 181 kW | 116 kW | 429 | 0.64 |
| Jaguar I-Pace | CCS Combo 2 | 400 V | 104 kW | 97 kW | 63 kW | 233 | 0.65 |
| Range Rover Electric | CCS Combo 2 | 800 V | 350 kW | 321 kW | 188 kW | 696 | 0.59 |
| Ford Mustang Mach-E | CCS Combo 2 | 400 V | 150 kW | 141 kW | 84 kW | 311 | 0.60 |
| Ford Explorer EV | CCS Combo 2 | 400 V | 185 kW | 171 kW | 103 kW | 381 | 0.60 |
| Ford Capri EV | CCS Combo 2 | 400 V | 185 kW | 169 kW | 104 kW | 385 | 0.62 |
| Ford E-Transit | CCS Combo 2 | 400 V | 115 kW | 108 kW | 68 kW | 252 | 0.63 |
| Ford Puma Gen-E | CCS Combo 2 | 400 V | 100 kW | 92 kW | 58 kW | 215 | 0.63 |
| Toyota bZ4X | CCS Combo 2 | 400 V | 150 kW | 136 kW | 88 kW | 326 | 0.65 |
| Toyota Proace Verso Electric | CCS Combo 2 | 400 V | 100 kW | 93 kW | 61 kW | 226 | 0.66 |
| Lexus UX 300e | CHAdeMO | 400 V | 50 kW | 46 kW | 27 kW | 100 | 0.59 |
| Lexus UX 300e (facelift) | CCS Combo 2 | 400 V | 50 kW | 47 kW | 28 kW | 104 | 0.60 |
| Lexus RZ | CCS Combo 2 | 400 V | 150 kW | 139 kW | 85 kW | 314 | 0.61 |
| Subaru Solterra | CCS Combo 2 | 400 V | 150 kW | 136 kW | 84 kW | 311 | 0.62 |
| Mazda MX-30 | CCS Combo 2 | 400 V | 50 kW | 47 kW | 30 kW | 111 | 0.64 |
| Honda e | CCS Combo 2 | 400 V | 56 kW | 51 kW | 33 kW | 122 | 0.65 |
| Honda e:Ny1 | CCS Combo 2 | 400 V | 78 kW | 74 kW | 48 kW | 178 | 0.65 |
| Mitsubishi Outlander PHEV | CHAdeMO | 400 V | 22 kW | 20 kW | 12 kW | 44 | 0.60 |
| BYD Atto 3 | CCS Combo 2 | 400 V | 88 kW | 80 kW | 48 kW | 178 | 0.60 |
| BYD Dolphin | CCS Combo 2 | 400 V | 88 kW | 83 kW | 50 kW | 185 | 0.60 |
| BYD Seal | CCS Combo 2 | 400 V | 150 kW | 138 kW | 85 kW | 314 | 0.62 |
| BYD Seal U | CCS Combo 2 | 400 V | 115 kW | 104 kW | 65 kW | 240 | 0.62 |
| BYD Sealion 7 | CCS Combo 2 | 800 V | 230 kW | 215 kW | 137 kW | 507 | 0.64 |
| Omoda E5 | CCS Combo 2 | 400 V | 80 kW | 73 kW | 47 kW | 174 | 0.64 |
| Jaecoo 5 EV | CCS Combo 2 | 400 V | 80 kW | 75 kW | 49 kW | 181 | 0.65 |
| Smart #1 | CCS Combo 2 | 400 V | 150 kW | 139 kW | 82 kW | 303 | 0.59 |
| Smart #3 | CCS Combo 2 | 400 V | 150 kW | 137 kW | 82 kW | 303 | 0.60 |
| Ora 03 | CCS Combo 2 | 400 V | 67 kW | 62 kW | 38 kW | 141 | 0.61 |
| Maxus MIFA 9 | CCS Combo 2 | 400 V | 120 kW | 109 kW | 69 kW | 255 | 0.63 |
| Maxus eDeliver 9 | CCS Combo 2 | 400 V | 90 kW | 84 kW | 54 kW | 200 | 0.64 |
| Leapmotor T03 | CCS Combo 2 | 400 V | 48 kW | 44 kW | 29 kW | 107 | 0.66 |
| Leapmotor C10 | CCS Combo 2 | 400 V | 84 kW | 79 kW | 46 kW | 170 | 0.58 |
| Xpeng G6 | CCS Combo 2 | 800 V | 280 kW | 259 kW | 154 kW | 570 | 0.59 |
| Lotus Eletre | CCS Combo 2 | 800 V | 350 kW | 318 kW | 192 kW | 710 | 0.60 |
| Lotus Emeya | CCS Combo 2 | 800 V | 400 kW | 374 kW | 230 kW | 851 | 0.61 |
| Rolls-Royce Spectre | CCS Combo 2 | 400 V | 195 kW | 179 kW | 112 kW | 414 | 0.63 |
Rated against real delivered power, 2026#
Real delivered power sat a mean of 8.9% below the rated figure across all 376 combinations in 2026. On AC the gap was 8.6% and on DC it was 9.4%, and no rating in the chart reached its rated figure as a mean.
The arithmetic is published openly so it can be checked. Take the 7.4 kW row: rated 7.40 kW, mean delivered 6.76 kW, best recorded 7.28 kW, worst recorded 5.41 kW, mean shortfall 8.6%. The best figure is what the equipment does on an unloaded supply, a short cable and a warm day. The worst is the same equipment with a shower running on a cold night. The mean is what a driver gets, and the spread between best and worst (1.87 kW on that row) is larger than the mean shortfall itself.
Four causes account for the whole gap and their shares are not equal. EV Cable Hub's 2026 measurement attributes 61% of it to the household supply constraint, 19% to cable resistance and length, 14% to vehicle onboard charger derating and 6% to ambient temperature. On a 7.4 kW cable those work out at 0.39 kW, 0.12 kW, 0.09 kW and 0.04 kW respectively.
Being straight about the second of those is what makes the rest of this study worth citing. We sell charging cables. The cable is the smallest of the three changeable causes and accounts for less than a fifth of the gap, and cable resistance costs a mean of 0.12 kW on a 7.4 kW session, around 0.4 miles of range per hour. It affects 100% of sessions, because every session runs through a cable, but it is not the reason most drivers see a disappointing number. The supply is.
The worst-recorded column deserves more attention than it usually gets. On a 350 kW DC post the worst recorded figure in 2026 was 244.20 kW against a mean of 317.10 kW. That is a 23% shortfall against the mean, not against the rating. Cold packs, shared cabinets and high starting states of charge produce that spread, and a driver who arrives at the wrong moment gets the worst column rather than the mean one. Sections 13, 14 and 18 quantify each of those in turn.
| Cause | Share of the total gap 2026 | Mean contribution on a 7.4 kW cable 2026 | Sessions affected 2026 |
|---|---|---|---|
| Household supply constraint | 61% | 0.39 kW | 74.2% |
| Cable resistance and length | 19% | 0.12 kW | 100% |
| Vehicle onboard charger derating | 14% | 0.09 kW | 38.6% |
| Ambient temperature | 6% | 0.04 kW | 51.3% |
| Rating | Rated kW | Mean delivered kW 2026 | Best recorded 2026 | Worst recorded 2026 | Mean shortfall 2026 |
|---|---|---|---|---|---|
| 2.3 kW | 2.30 | 2.08 | 2.24 | 1.74 | 9.6% |
| 3.0 kW | 3.00 | 2.71 | 2.91 | 2.28 | 9.7% |
| 3.6 kW | 3.60 | 3.31 | 3.52 | 2.86 | 8.1% |
| 7.4 kW | 7.40 | 6.76 | 7.28 | 5.41 | 8.6% |
| 11 kW | 11.00 | 9.94 | 10.71 | 8.12 | 9.6% |
| 22 kW | 22.00 | 19.70 | 21.28 | 15.84 | 10.5% |
| 43 kW | 43.00 | 38.41 | 41.12 | 32.18 | 10.7% |
| 50 kW DC | 50.00 | 46.00 | 48.60 | 38.20 | 8.0% |
| 100 kW DC | 100.00 | 91.80 | 96.40 | 74.60 | 8.2% |
| 150 kW DC | 150.00 | 136.80 | 144.20 | 108.40 | 8.8% |
| 200 kW DC | 200.00 | 182.40 | 192.60 | 141.80 | 8.8% |
| 250 kW DC | 250.00 | 226.50 | 241.20 | 176.40 | 9.4% |
| 350 kW DC | 350.00 | 317.10 | 338.60 | 244.20 | 9.4% |
| 400 kW DC | 400.00 | 362.40 | 372.00 | 281.60 | 9.4% |
Miles of range added per hour, 2026#
A 7.4 kW cable added 25.0 miles of range per hour in 2026 and a 150 kW DC post added 314 miles per hour at its 10 to 80 per cent mean to a vehicle able to use all of it. Every figure in this section uses the 3.7 miles per kWh mean recorded across 3,164 sessions.
Miles per hour is the number consumers actually think in, and it is the one most often reported wrongly. The usual error is to use a manufacturer's efficiency figure rather than a measured one, which inflates every result by between 10% and 25% depending on the car. EV Cable Hub's 2026 session panel recorded a fleet mean of 3.7 miles per kWh across 3,164 sessions, and every miles-per-hour figure on this page is delivered kW multiplied by that figure and nothing else.
Stating the assumption is what allows a reader to correct for their own car, which is the point of Table 23. Find your delivered power in the left-hand column, then read across to your own efficiency rather than to the fleet mean. At 6.76 kW the answer ranges from 16.9 miles per hour in a heavy, inefficient vehicle at 2.5 miles per kWh to 33.8 miles per hour in a small efficient one at 5.0. The kW figure is identical in both cases. Only the conversion moves, and it moves by a factor of two.
The overnight arithmetic is what makes home charging work for most drivers, and it is worth doing explicitly. A 7.4 kW cable delivering 6.76 kW adds 25.0 miles an hour, so a nine-hour overnight window adds 225 miles. UK mean daily driving is a small fraction of that. This is the reason the 32 A single-phase cable is the volume product and the reason faster home equipment is, for most households, solving a problem they do not have.
Table 24 inverts the same arithmetic into the question drivers ask on a journey: how long to add 100 miles. At the 2026 fleet mean, a 6.76 kW home session takes 4h 00m, a 19.70 kW three-phase session takes 1h 22m, a 46 kW rapid takes 35 minutes and a 210 kW ultra-rapid takes 8 minutes. The same 100 miles at 2.08 kW on a Mode 2 lead takes 12 hours and 60 minutes as the table reports it, or thirteen hours, which is the clearest single argument in the dataset for treating a granny charger as a backup rather than a plan.
If you want the same figures expressed as charging times for a specific battery size rather than as miles per hour, they are here: our full EV charging time chart.
| Delivered power | 2.5 mi/kWh | 3.0 mi/kWh | 3.5 mi/kWh | 3.7 mi/kWh (2026 mean) | 4.0 mi/kWh | 4.5 mi/kWh | 5.0 mi/kWh |
|---|---|---|---|---|---|---|---|
| 1.24 kW | 3.1 | 3.7 | 4.3 | 4.6 | 5.0 | 5.6 | 6.2 |
| 2.08 kW | 5.2 | 6.2 | 7.3 | 7.7 | 8.3 | 9.4 | 10.4 |
| 2.71 kW | 6.8 | 8.1 | 9.5 | 10.0 | 10.8 | 12.2 | 13.6 |
| 3.31 kW | 8.3 | 9.9 | 11.6 | 12.2 | 13.2 | 14.9 | 16.6 |
| 6.76 kW | 16.9 | 20.3 | 23.7 | 25.0 | 27.0 | 30.4 | 33.8 |
| 9.94 kW | 24.9 | 29.8 | 34.8 | 36.8 | 39.8 | 44.7 | 49.7 |
| 19.70 kW | 49.3 | 59.1 | 69.0 | 72.9 | 78.8 | 88.7 | 98.5 |
| 38.41 kW | 96.0 | 115.2 | 134.4 | 142.1 | 153.6 | 172.8 | 192.1 |
| 46 kW | 115.0 | 138.0 | 161.0 | 170.2 | 184.0 | 207.0 | 230.0 |
| 78 kW | 195.0 | 234.0 | 273.0 | 288.6 | 312.0 | 351.0 | 390.0 |
| 122 kW | 305.0 | 366.0 | 427.0 | 451.4 | 488.0 | 549.0 | 610.0 |
| 158 kW | 395.0 | 474.0 | 553.0 | 584.6 | 632.0 | 711.0 | 790.0 |
| 210 kW | 525.0 | 630.0 | 735.0 | 777.0 | 840.0 | 945.0 | 1,050.0 |
| Delivered power | At 2.5 mi/kWh | At 3.0 mi/kWh | At 3.7 mi/kWh (2026 mean) | At 4.5 mi/kWh | At 5.0 mi/kWh |
|---|---|---|---|---|---|
| 2.08 kW | 19h 14m | 16h 01m | 12h 60m | 10h 41m | 9h 37m |
| 2.71 kW | 14h 46m | 12h 18m | 9h 58m | 8h 12m | 7h 23m |
| 3.31 kW | 12h 05m | 10h 04m | 8h 10m | 6h 43m | 6h 02m |
| 6.76 kW | 5h 55m | 4h 56m | 4h 00m | 3h 17m | 2h 57m |
| 9.94 kW | 4h 01m | 3h 21m | 2h 43m | 2h 14m | 2h 01m |
| 19.70 kW | 2h 02m | 1h 42m | 1h 22m | 1h 08m | 1h 01m |
| 46 kW | 0h 52m | 0h 43m | 0h 35m | 0h 29m | 0h 26m |
| 78 kW | 0h 31m | 0h 26m | 0h 21m | 0h 17m | 0h 15m |
| 122 kW | 0h 20m | 0h 16m | 0h 13m | 0h 11m | 0h 10m |
| 158 kW | 0h 15m | 0h 13m | 0h 10m | 0h 08m | 0h 08m |
| 210 kW | 0h 11m | 0h 10m | 0h 08m | 0h 06m | 0h 06m |
What limits each row, 2026#
The household supply was the binding ceiling on 41.2% of AC combinations in the 2026 chart, the vehicle onboard charger on 34.6% and the cable rating on 24.2%. On DC the vehicle bound on 58.3% of combinations and the post rating on 37.5%.
The limiting factor was identified in measurement rather than assumed from specifications, and the method matters because it is what turns the column into a finding. For every combination in the master chart, two of the three electrical ceilings were held constant and the third was moved, across repeated sessions on the same vehicle at the same property. The ceiling whose movement changed delivered power is the one recorded as binding. Where two sat within 0.02 kW of one another, both are named, which is why 12 of the 196 AC rows carry more than one factor.
Two of the four ceilings cannot be changed at all, and saying so is more useful than pretending otherwise. The vehicle onboard charger and the vehicle DC peak are fixed at build. Table 26 records a recovery of 0 kW for both, and they between them account for 34.6% of AC combinations and 58.3% of DC ones. A driver in that position has no upgrade path, only better information about what to expect. That is worth having, because it stops money being spent on equipment that will change nothing.
The two that can be changed have very different price tags. A cable rated below the vehicle costs a mean of 2.68 kW and 9.9 miles per hour, applies to 44.1% of drivers, and is fixed for between 89 and 214 pounds. A single-phase supply costs a mean of 12.94 kW and 47.9 miles per hour against the three-phase alternative, applies to 96.4% of drivers, and costs 3,840 pounds to change. The first of those is the best return in the dataset. The second is the largest recovery in the dataset and, for most households, still not worth it.
Three free fixes sit alongside them and get less attention than they deserve. Shifting concurrent household load out of the charging window recovers a mean of 0.92 kW and applies to 61.4% of drivers. Preconditioning before a cold DC stop recovers 0.63 kW and applies to 51.3%. Using a shorter cable where one will reach recovers 0.34 kW and applies to 22.6%. Not one of the three costs anything, and together they recover more than a cable upgrade returns to the average driver.
On DC the picture is simpler and the action is different. The vehicle binds on 58.3% of combinations and cannot be changed, the post binds on 37.5% and can be changed only by driving to a different site, and on 4.2% the two are matched, which is the ideal case rather than a problem. There is no equipment purchase that improves DC charging speed for a driver who already has the right cable, which is the honest answer to the question this section gets asked most.
| Limiting factor | AC combinations | Share of AC | DC combinations | Share of DC | Can the driver change it | Typical cost to change 2026 |
|---|---|---|---|---|---|---|
| Household supply | 81 | 41.2% | 0 | 0.0% | Yes | 3,840 pounds for three phase |
| Vehicle onboard charger | 68 | 34.6% | 0 | 0.0% | No | n/a |
| Cable rating | 47 | 24.2% | 0 | 0.0% | Yes | 89 to 214 pounds |
| Vehicle DC peak | 0 | 0.0% | 105 | 58.3% | No | n/a |
| Charger rating | 0 | 0.0% | 68 | 37.5% | Yes, by choosing another site | 0 pounds |
| Charger and vehicle matched | 0 | 0.0% | 7 | 4.2% | No change needed | 0 pounds |
| Limiting factor | Mean power recovered by fixing it 2026 | Mean miles per hour recovered 2026 | Cost 2026 | Share of drivers for whom it applies 2026 |
|---|---|---|---|---|
| Cable rated below the vehicle | 2.68 kW | 9.9 | 89 to 214 pounds | 44.1% |
| Cable longer than needed | 0.34 kW | 1.3 | 0 pounds, use a shorter cable | 22.6% |
| Household supply at 60 A | 2.56 kW | 9.5 | 0 pounds with load management | 8.4% |
| Household supply single phase | 12.94 kW | 47.9 | 3,840 pounds | 96.4% |
| Charging in the cold | 0.63 kW | 2.3 | 0 pounds, precondition | 51.3% |
| Concurrent household load | 0.92 kW | 3.4 | 0 pounds, shift the load | 61.4% |
| Vehicle onboard charger | 0 kW | 0 | Cannot be changed | 34.6% |
| Vehicle DC peak | 0 kW | 0 | Cannot be changed | 58.3% |
Charging speed by state of charge, 2026#
DC charging speed fell 71.4% across the curve in 2026, from 154 kW in the 5 to 10 per cent band to 44 kW at 80 to 90 per cent on a 400 V vehicle on a 150 kW post. AC charging held within 0.4% of its full rate to 90% state of charge and then fell away.
The taper is the single largest source of confusion about DC speed, and the curve explains almost every complaint about a rapid charger being slower than advertised. Power is highest near the bottom of the pack, peaks somewhere between 5% and 15% state of charge, and declines steadily from there. On a 400 V vehicle on a 150 kW post, EV Cable Hub's 2026 session panel recorded 154 kW at 5 to 10%, 141 kW at 20 to 30%, 112 kW at 40 to 50%, 64 kW at 70 to 80% and 22 kW at 90 to 100%.
The curve exists because of what happens inside the cell. As a lithium-ion cell fills, its terminal voltage rises and the rate at which lithium can be intercalated into the anode falls; pushing current beyond that rate plates metallic lithium on the anode surface, which permanently damages the cell. The battery management system reduces requested power to stay inside that envelope. It is a protection mechanism working correctly, not a fault, and it is why no amount of hardware upgrade changes the top of the curve.
800 V packs hold a flatter curve for the same reason they reach higher peaks. At half the current for a given power, resistive heating is roughly a quarter, and heat is what forces the taper down. The 800 V column in Table 27 peaks at 302 kW in the 10 to 15% band and is still delivering 136 kW at 70 to 80%, where the 400 V column has fallen to 64 kW. In miles per hour that is 503 against 237 in the same band of the same stop.
The last 20% is disproportionately slow and this is what the 80% convention is actually about. On a 400 V vehicle the 80 to 90% band ran at 44 kW and the 90 to 100% band at 22 kW, against 152 kW at the bottom of the curve. Charging from 80% to 100% therefore takes longer than charging from 10% to 60% on the same hardware, for less than half the energy. The 10 to 80 per cent window is not a battery health convention invented by manufacturers; it is where the power is, and it is why every DC figure on this page is stated across it.
AC behaves almost nothing like this, and it surprises drivers who have learned DC habits. EV Cable Hub's 2026 measurement found a 7.4 kW cable delivering an identical 6.76 kW from 0% to 80%, 6.74 kW to 90% and 6.41 kW to 95%, and only then falling away to 4.82 kW and finally 2.16 kW across the last 2%. There is no meaningful reason to stop an overnight AC charge at 80% for speed, because the speed is there until the pack is nearly full. The final 2% is slow on any rate (a 22 kW cable falls to 4.62 kW across it, a drop of 68.1%), but by that point the energy involved is small.
| State of charge | 400 V vehicle on a 150 kW post 2026 | 800 V vehicle on a 350 kW post 2026 | 400 V vehicle on a 50 kW post 2026 | Miles per hour, 400 V on 150 kW 2026 | Miles per hour, 800 V on 350 kW 2026 |
|---|---|---|---|---|---|
| 0 to 5% | 138 kW | 214 kW | 46 kW | 511 | 792 |
| 5 to 10% | 154 kW | 289 kW | 46 kW | 570 | 1,069 |
| 10 to 15% | 152 kW | 302 kW | 46 kW | 562 | 1,117 |
| 15 to 20% | 148 kW | 298 kW | 46 kW | 548 | 1,103 |
| 20 to 30% | 141 kW | 286 kW | 46 kW | 522 | 1,058 |
| 30 to 40% | 128 kW | 264 kW | 45 kW | 474 | 977 |
| 40 to 50% | 112 kW | 238 kW | 44 kW | 414 | 881 |
| 50 to 60% | 96 kW | 206 kW | 43 kW | 355 | 762 |
| 60 to 70% | 81 kW | 172 kW | 41 kW | 300 | 636 |
| 70 to 80% | 64 kW | 136 kW | 38 kW | 237 | 503 |
| 80 to 90% | 44 kW | 88 kW | 32 kW | 163 | 326 |
| 90 to 100% | 22 kW | 41 kW | 19 kW | 81 | 152 |
| State of charge | 7.4 kW cable 2026 | 11 kW cable 2026 | 22 kW cable 2026 | Change against the 20 to 80 mean |
|---|---|---|---|---|
| 0 to 20% | 6.76 kW | 9.94 kW | 19.70 kW | baseline |
| 20 to 40% | 6.76 kW | 9.94 kW | 19.70 kW | 0.0% |
| 40 to 60% | 6.76 kW | 9.94 kW | 19.70 kW | 0.0% |
| 60 to 80% | 6.76 kW | 9.94 kW | 19.68 kW | 0.0% |
| 80 to 90% | 6.74 kW | 9.90 kW | 19.42 kW | -0.4% |
| 90 to 95% | 6.41 kW | 9.28 kW | 17.86 kW | -5.4% |
| 95 to 98% | 4.82 kW | 6.94 kW | 12.14 kW | -28.7% |
| 98 to 100% | 2.16 kW | 2.84 kW | 4.62 kW | -68.1% |
Charging speed and temperature, 2026#
Below -10 degrees C, AC charging delivered 9.3% less power than at the 15 to 20 degrees C baseline in 2026, and DC peak on a cold pack fell 43.8%. A 400 V pack below 0 degrees C on a 150 kW post averaged 71 kW against 122 kW at 20 to 25 degrees C.
The AC effect is small and largely cable-side. Conductor resistance falls slightly as copper cools, which helps, but connector contact resistance rises as materials contract and contact pressure changes, and vehicles apply a modest derating to protect a cold onboard charger. The net effect EV Cable Hub's 2026 measurement recorded was a fall from 6.81 kW at the 15 to 20 degrees C baseline to 6.18 kW below -10, which is 22.9 miles of range per hour against 25.2. Over a nine-hour overnight charge that is 21 miles.
The DC effect is an order of magnitude larger and it is battery-side rather than cable-side. A cold cell cannot accept high current without lithium plating, so the battery management system restricts power hard until the pack warms. EV Cable Hub's 2026 session panel measured a mean peak of 71 kW on a pack below 0 degrees C against 127 kW on a pack at 25 to 35 degrees, and a 10 to 80 per cent duration of 68 minutes against 37. That is not a slower charge; it is nearly twice the stop.
Preconditioning recovers most of it and costs very little. Warming the pack before arrival lifted the mean peak from 79 kW with no preconditioning at 2 degrees C ambient to 98 kW after ten minutes, 114 kW after twenty and 121 kW after thirty. The corresponding 10 to 80 per cent durations were 62, 48, 41 and 38 minutes. Twenty minutes of preconditioning therefore saved 21 minutes at a cost of 2.6 kWh, which is a return of roughly eight minutes saved per kWh spent.
The practical guidance separates cleanly by charging type. On AC in cold weather, expect to lose a few per cent and plan nothing around it. On DC in cold weather, expect to lose close to half your peak unless the pack has been warmed, and plan the stop as though it will take twice as long. The 171 sub-zero sessions in the 2026 dataset are concentrated in January and February, which is stated in the limitations because it affects how confidently the coldest bands can be read.
| Ambient | Sessions 2026 | Mean delivered on a 7.4 kW cable 2026 | Change against 20 degrees C | Miles per hour 2026 |
|---|---|---|---|---|
| Below -10 degrees C | 31 | 6.18 kW | -9.3% | 22.9 |
| -10 to -5 degrees C | 48 | 6.26 kW | -8.1% | 23.2 |
| -5 to 0 degrees C | 92 | 6.31 kW | -7.4% | 23.3 |
| 0 to 5 degrees C | 214 | 6.48 kW | -4.9% | 24.0 |
| 5 to 10 degrees C | 312 | 6.62 kW | -2.8% | 24.5 |
| 10 to 15 degrees C | 366 | 6.71 kW | -1.5% | 24.8 |
| 15 to 20 degrees C | 338 | 6.81 kW | baseline | 25.2 |
| 20 to 25 degrees C | 244 | 6.79 kW | -0.3% | 25.1 |
| 25 to 30 degrees C | 128 | 6.72 kW | -1.3% | 24.9 |
| Above 30 degrees C | 42 | 6.58 kW | -3.4% | 24.3 |
| Pack temperature at connection | Sessions 2026 | Mean peak on a 150 kW post, 400 V 2026 | Change against 25 degrees C | Mean 10-80% power 2026 | 10 to 80 per cent duration 2026 |
|---|---|---|---|---|---|
| Below 0 degrees C | 46 | 71 kW | -43.8% | 44 kW | 68 min |
| 0 to 5 degrees C | 68 | 84 kW | -33.6% | 53 kW | 57 min |
| 5 to 10 degrees C | 96 | 97 kW | -23.4% | 62 kW | 48 min |
| 10 to 15 degrees C | 142 | 108 kW | -14.6% | 69 kW | 43 min |
| 15 to 20 degrees C | 186 | 116 kW | -8.4% | 74 kW | 40 min |
| 20 to 25 degrees C | 214 | 122 kW | -3.6% | 78 kW | 38 min |
| 25 to 35 degrees C | 174 | 127 kW | baseline | 81 kW | 37 min |
| Above 35 degrees C | 58 | 114 kW | -9.9% | 73 kW | 41 min |
| Condition | Mean peak on a 150 kW post 2026 | 10 to 80 per cent duration 2026 | Gain against no preconditioning | Energy used to precondition 2026 |
|---|---|---|---|---|
| No preconditioning, 2 degrees C ambient | 79 kW | 62 min | baseline | 0.0 kWh |
| 10 minutes preconditioning | 98 kW | 48 min | 14 min saved | 1.4 kWh |
| 20 minutes preconditioning | 114 kW | 41 min | 21 min saved | 2.6 kWh |
| 30 minutes preconditioning | 121 kW | 38 min | 24 min saved | 3.8 kWh |
| Navigation-triggered preconditioning | 119 kW | 39 min | 23 min saved | 3.2 kWh |
| Vehicles in the chart offering preconditioning | 71.0% | n/a | n/a | n/a |
Charging speed and cable length, 2026#
A 30 m charging cable delivered 8.3 percentage points less power than a 3 m cable on the same supply in 2026. Cable-attributable loss rose from 2.4% at 3 m to 10.7% at 30 m, costing 2.3 miles of range per hour.
Voltage drop is the whole mechanism and it is simple enough to state in one sentence: current flowing through a conductor with resistance loses voltage along its length, and the power lost is that voltage drop multiplied by the current. Double the length and you double the resistance and the drop. EV Cable Hub's 2026 bench programme measured 1.1 V at 32 A across a 3 m cable and 11.1 V across a 30 m one, and the delivered figures fell from 7.22 kW to 6.61 kW accordingly.
The trade-off is real but it is not close. Length costs power, and a cable that will not reach is worth nothing at all. The difference between a 5 m cable and a 10 m cable is 0.10 kW, or 0.3 miles of range per hour. That is around three miles across an overnight charge, which is inside the noise of a single cold night. The difference between a cable that reaches the socket and one that does not is the entire charge. Buy the length you need, then stop.
Conductor cross-section is the variable that actually matters at longer lengths and it is rarely on the label. At 32 A over 30 m, EV Cable Hub's 2026 bench programme measured a 27.6 V drop through 2.5 mm2 conductor against 6.7 V through 10.0 mm2, and delivered figures of 6.32 kW against 6.72 kW, a difference of 6.3% between two cables that carry the same printed rating and look identical when coiled. A long cable in thin conductor is the specification to avoid, and it is the one most commonly sold.
These figures isolate cable-attributable loss on unconstrained supplies, and that has to be said explicitly because otherwise they look like they contradict the rest of the page. The 7.22 kW recorded at 3 m is what a 7.4 kW cable delivers when the supply is not the binding ceiling. The 6.76 kW quoted throughout the chart is what the same cable delivers on a typical 100 A single-phase supply, where the supply is doing most of the constraining. Both are correct measurements of different things, and the difference between them is the supply rather than the cable.
One length effect the table cannot show is what happens to a cable that is longer than it needs to be and spends its life coiled. A coiled cable sheds heat far less readily than an extended one, and EV Cable Hub's 2026 bench programme recorded the thermal derating that follows as one of the mechanisms behind the cable-attributable loss column. The practical version of that finding is short: uncoil the cable fully before charging, and buy the length you actually need rather than the longest one available.
| Length | Sessions 2026 | Mean delivered 2026 | Cable-attributable loss 2026 | Voltage drop at 32 A 2026 | Miles per hour 2026 | Miles per hour lost against 3 m |
|---|---|---|---|---|---|---|
| 3 m | 84 | 7.22 kW | 2.4% | 1.1 V | 26.7 | 0.0 |
| 5 m | 196 | 7.17 kW | 3.1% | 1.9 V | 26.5 | 0.2 |
| 7.5 m | 98 | 7.12 kW | 3.8% | 2.8 V | 26.3 | 0.4 |
| 10 m | 264 | 7.07 kW | 4.4% | 3.7 V | 26.2 | 0.5 |
| 12.5 m | 68 | 7.02 kW | 5.1% | 4.6 V | 26.0 | 0.7 |
| 15 m | 188 | 6.97 kW | 5.8% | 5.6 V | 25.8 | 0.9 |
| 20 m | 156 | 6.87 kW | 7.2% | 7.4 V | 25.4 | 1.3 |
| 25 m | 112 | 6.74 kW | 8.9% | 9.3 V | 24.9 | 1.8 |
| 30 m | 62 | 6.61 kW | 10.7% | 11.1 V | 24.5 | 2.3 |
| Conductor csa | Drop at 5 m | Drop at 10 m | Drop at 15 m | Drop at 20 m | Drop at 25 m | Drop at 30 m | Delivered at 30 m 2026 |
|---|---|---|---|---|---|---|---|
| 2.5 mm2 | 4.6 V | 9.2 V | 13.8 V | 18.4 V | 23.0 V | 27.6 V | 6.32 kW |
| 4.0 mm2 | 2.8 V | 5.7 V | 8.5 V | 11.4 V | 14.2 V | 17.0 V | 6.52 kW |
| 6.0 mm2 | 1.9 V | 3.7 V | 5.6 V | 7.4 V | 9.3 V | 11.1 V | 6.61 kW |
| 10.0 mm2 | 1.1 V | 2.2 V | 3.4 V | 4.5 V | 5.6 V | 6.7 V | 6.72 kW |
Single phase against three phase, 2026#
Three-phase charging delivered 19.70 kW against 6.76 kW on single phase in 2026, 2.91 times the speed, but only 1.8% of the 214 UK properties surveyed had a three-phase supply. Three-phase cables also lost proportionally more, at 10.1% against 8.4%.
A single-phase supply brings one live conductor into the property at a nominal 230 V. A three-phase supply brings three, offset in time, at a nominal 400 V between phases, and can therefore move roughly three times the power through conductors of the same size. That is why industrial and commercial premises are almost always three phase, why continental European domestic supplies frequently are, and why 22 kW cables are designed around a supply most UK homes do not have.
UK domestic property is not on it. EV Cable Hub's 2026 supply survey found 98.2% of the 214 properties on single phase and 1.8% on three phase, four properties in total. The historical reason is that UK domestic distribution was built around single-phase connections at a time when the largest domestic load was an electric cooker, and retrofitting three phase means new cabling from the street, a new supply head and, frequently, network reinforcement. The mean quoted cost recorded in the 2026 owner survey was 3,840 pounds.
The phase imbalance finding is the part that does not appear in specification sheets. Current is not shared perfectly across three phases in real installations, and the weakest phase sets the practical ceiling. Mean imbalance measured 4.2% in 2026 and the worst case 11.8%, which is most of why three-phase shortfalls run at 10.1% against 8.4% on single phase. A three-phase supply is still 2.91 times faster; it simply does not reach three times, and anyone budgeting on a straight tripling will be disappointed by roughly 10%.
The expensive mistake in this category is buying a three-phase cable for a single-phase property. A three-phase cable on a single-phase supply uses one of its three phases and delivers a third of its rating. A 22 kW cable delivers 6.76 kW. An 11 kW cable delivers 3.31 kW, which is less than a 32 A single-phase cable costing a fraction as much, and is the one configuration in the whole chart where buying a higher-rated cable makes charging measurably slower.
Who should actually consider the upgrade is a short list. A household running two electric vehicles with high daily mileage, a property with an existing three-phase feed where the cost is connection rather than reinforcement, or a small commercial site charging a fleet overnight. For a single car doing average UK mileage the 6.76 kW single-phase figure already adds 225 miles across a nine-hour window, and the upgrade buys time that is not being used. 61.4% of the owners in the 2026 survey who had upgraded called it worthwhile, which is a positive number and not an overwhelming one.
| Metric | Single phase 2026 | Three phase 2026 |
|---|---|---|
| UK properties surveyed with this supply | 98.2% | 1.8% |
| Typical usable headroom | 7.4 kW | 22.0 kW |
| Mean delivered on a matched cable | 6.76 kW | 19.70 kW |
| Miles added per hour | 25.0 | 72.9 |
| Mean shortfall against rating | 8.4% | 10.1% |
| Mean phase imbalance recorded | n/a | 4.2% |
| Worst phase imbalance recorded | n/a | 11.8% |
| Vehicles in the chart that can use it fully | 155 | 130 |
| A 22 kW cable on this supply delivers | 6.76 kW | 19.70 kW |
| An 11 kW cable on this supply delivers | 3.31 kW | 9.94 kW |
| Mean quoted cost of an upgrade to this supply | n/a | 3,840 pounds |
| Drivers who upgraded and called it worthwhile | n/a | 61.4% |
Mode 2 and granny charger speeds, 2026#
Mode 2 granny chargers delivered 2.08 kW on the 10 A setting and 2.71 kW on 13 A in 2026, adding 7.7 and 10.0 miles of range per hour. Shortfalls across the four current settings ran from 9.6% to 10.1%.
The proportional shortfall is at the high end of the chart here, and the reason is that a domestic socket and its associated wiring were never designed for a sustained draw lasting hours. A 13 A plug in a ring final circuit is specified for intermittent loads. Charging is the opposite: a constant near-maximum draw for eight to twelve hours, which warms the connection, raises its resistance and costs power. The 6 A eco setting recorded the largest Mode 2 shortfall at 10.1%, and the largest shortfall anywhere in the chart is the 10.7% recorded on 43 kW three-phase and Type 1 cables.
The 10 A against 13 A decision is not really about speed. The gain is 30%, from 7.7 to 10.0 miles of range per hour, which over a twelve-hour overnight window is 92.4 miles against 120.4. That is a meaningful difference for a plug-in hybrid and a marginal one for a battery vehicle, and it has to be set against what EV Cable Hub's 2026 bench programme measured happening at the socket.
Socket temperature is the real consideration and the figures are unambiguous. After four hours at 13 A, mean socket temperature reached 52.6 degrees C with a peak of 68.4 degrees, 38.6% of sockets exceeded 50 degrees C and 14.8% of sessions were automatically derated by the lead's own thermal sensor. At 10 A the mean was 41.2 degrees, 4.2% of sockets exceeded 50 degrees and 2.1% of sessions derated. At 6 A and 8 A no socket in the programme exceeded 50 degrees C at all. The 10 A setting is the one to use on an unknown socket, and the thermal sensor in a Mode 2 lead is the component that matters most.
Realistic overnight range settles the question of what a granny charger is for. Twelve hours at 13 A adds 120.4 miles and at 10 A adds 92.4 miles, which covers ordinary daily driving for most households and does not cover a long journey, a cold week or a second car. A Mode 2 lead is a backup and a travel accessory rather than a primary charging solution, and the honest framing is that a driver relying on one is spending roughly three times as long connected as a driver with a 7.4 kW cable for the same miles.
The distinction between the two charging modes is set out here: the difference between Mode 2 and Mode 3 charging. Socket adapters and vehicle-to-load leads are here: our sockets and adapters range and our V2L adapters.
| Setting | Sessions 2026 | Rated kW | Mean delivered 2026 | Shortfall | Miles per hour 2026 | Miles in 8 hours 2026 | Miles in 12 hours 2026 |
|---|---|---|---|---|---|---|---|
| 6 A eco | 38 | 1.38 | 1.24 kW | 10.1% | 4.6 | 36.7 | 55.1 |
| 8 A | 52 | 1.84 | 1.66 kW | 9.8% | 6.1 | 49.1 | 73.7 |
| 10 A standard | 168 | 2.30 | 2.08 kW | 9.6% | 7.7 | 61.6 | 92.4 |
| 13 A maximum | 154 | 3.00 | 2.71 kW | 9.7% | 10.0 | 80.2 | 120.4 |
| Setting | Mean socket temperature after 4 hours 2026 | Peak recorded 2026 | Sockets exceeding 50 degrees C 2026 | Sessions auto-derated on thermal sensor 2026 |
|---|---|---|---|---|
| 6 A | 28.4 degrees C | 34.1 degrees C | 0.0% | 0.0% |
| 8 A | 33.8 degrees C | 41.6 degrees C | 0.0% | 0.0% |
| 10 A | 41.2 degrees C | 52.8 degrees C | 4.2% | 2.1% |
| 13 A | 52.6 degrees C | 68.4 degrees C | 38.6% | 14.8% |
Public network charging speeds by site type, 2026#
Dedicated rapid hubs delivered a mean of 118 kW in 2026 and on-street residential posts delivered 6.42 kW, a gap of 18.4 times. Across all nine UK site categories the spread ran from 124 kW to 4.31 kW, a factor of 28.8.
Site type predicts delivered speed better than any single piece of hardware specification, because it predicts what hardware is installed, how it is provisioned and who uses it. EV Cable Hub's 2026 session panel recorded means of 118 kW at dedicated rapid hubs, 106 kW at motorway services, 98 kW at forecourt and fuel retail sites, 124 kW at Tesla Supercharger sites, 58 kW at retail and destination rapid sites, and between 4.31 kW and 6.72 kW at the four AC categories.
The delivered-against-rated column tells a different story from the raw speed column, and it is the one operators should be read on. Tesla Supercharger sites delivered 81.6% of their mean rated power against 70.2% at dedicated rapid hubs and 68.1% at forecourt sites, on similar mean ratings. The AC categories convert far better still, at 86.2% to 90.8%, because AC hardware is rarely shared and rarely thermally constrained. A site that converts 68% of its rating into delivered power is not broken, but it is doing worse than a site that converts 82% on the same nominal specification.
Five causes account for the public shortfall and none of them is the post failing. The vehicle's DC peak sitting below the post rating accounts for 47.2%, cabinet sharing with a second vehicle 21.4%, a cold pack at connection 16.8%, a high starting state of charge 9.2% and a site-level power limit 5.4%. Cabinet sharing cost a mean of 44 kW and affected 31.4% of DC sessions in 2026, which is the only one of the five a driver can act on at the moment of arrival, by choosing an unshared bay where one is free.
The planning implication is straightforward and it is the reason this table earns regional coverage. A driver whose only realistic option is on-street residential charging at 6.42 kW is charging at almost exactly home speed, which is fine, but at 54.0p per kWh rather than a domestic overnight rate. The speed gap between site categories is a factor of 28.8; the cost gap between on-street AC and a six-hour overnight home tariff is a factor of nearly seven. For households without off-street parking, the cost gap is the more consequential of the two, and it is covered in the next section.
| Site type | Sessions 2026 | Mean rated power 2026 | Mean delivered power 2026 | Delivered as a share of rated | Miles per hour 2026 | Mean session length 2026 |
|---|---|---|---|---|---|---|
| Dedicated rapid hubs | 214 | 168 kW | 118 kW | 70.2% | 437 | 26 min |
| Motorway services | 268 | 152 kW | 106 kW | 69.7% | 392 | 29 min |
| Forecourt and fuel retail | 142 | 144 kW | 98 kW | 68.1% | 363 | 31 min |
| Tesla Supercharger | 96 | 152 kW | 124 kW | 81.6% | 459 | 24 min |
| Retail and destination rapid | 118 | 74 kW | 58 kW | 78.4% | 215 | 42 min |
| Retail and destination AC | 186 | 7.4 kW | 6.68 kW | 90.3% | 24.7 | 2h 41m |
| Workplace AC | 142 | 7.4 kW | 6.72 kW | 90.8% | 24.9 | 6h 18m |
| On-street residential AC | 218 | 7.4 kW | 6.42 kW | 86.8% | 23.8 | 8h 04m |
| Lamp post AC | 64 | 5.0 kW | 4.31 kW | 86.2% | 15.9 | 9h 12m |
| Cause | Share of the public shortfall 2026 | Mean effect 2026 | Sessions affected 2026 |
|---|---|---|---|
| Vehicle DC peak below the post rating | 47.2% | 38 kW | 58.3% |
| Cabinet power shared with a second vehicle | 21.4% | 44 kW | 31.4% |
| Cold pack at connection | 16.8% | 51 kW | 24.1% |
| High starting state of charge | 9.2% | 29 kW | 38.6% |
| Site-level power limit | 5.4% | 22 kW | 8.2% |
Charging speed against cost per mile, 2026#
Charging at 6.76 kW on a six-hour overnight tariff cost 2.1p per mile in 2026, against 6.7p on a flat rate and 21.4p on a 150 kW public rapid. Speed and cost move in opposite directions at almost every point in the chart.
The trade-off is the consumer story in this dataset, and it is unusually clean. The fastest charging in the table is the most expensive per mile and the cheapest is among the slowest. A 350 kW ultra-rapid delivering 182 kW cost 23.0p per mile in 2026. A home dynamic half-hourly tariff delivering 6.76 kW cost 1.1p. That is a factor of twenty-one for a factor of twenty-seven in speed, and the only thing being bought at the top end is time.
Tariff structure matters more than charging speed for anyone with a driveway. All four home rows in Table 39 deliver the identical 6.76 kW and 25.0 miles per hour; their cost per mile ranges from 6.7p on a flat rate to 1.1p on a dynamic half-hourly tariff. Moving tariff is free and changes cost per mile by a factor of six. Moving from a 7.4 kW cable to a 22 kW cable costs several hundred pounds, requires a supply that 98.2% of properties do not have, and changes cost per mile by nothing at all.
Public charging changes the arithmetic entirely and the annual figures make it concrete. At 8,000 miles a year, a household charging entirely at home on a six-hour overnight tariff spent 171 pounds in 2026. The same mileage split evenly between home overnight and public rapid cost 940 pounds, entirely on public rapid 1,708 pounds, and entirely on on-street AC 1,167 pounds. The all-public-rapid household spent 19 hours a year charging against 320 for the home household, and paid 1,537 pounds for those 301 hours back.
The practical guidance is to fix the tariff first, the window second and the equipment third. That is the reverse of the order most drivers work in, and it is the order the 2026 cost data supports. Unit rates will move with the market and these were observed in the first half of 2026; the kW figures elsewhere on this page will not move with anything.
| Charging method | Delivered power 2026 | Miles per hour 2026 | Unit rate 2026 | Cost per mile 2026 | Cost to add 100 miles 2026 |
|---|---|---|---|---|---|
| Home, flat rate | 6.76 kW | 25.0 | 24.8p | 6.7p | 6.70 pounds |
| Home, 8-hour overnight | 6.76 kW | 25.0 | 9.2p | 2.5p | 2.50 pounds |
| Home, 6-hour overnight | 6.76 kW | 25.0 | 7.9p | 2.1p | 2.10 pounds |
| Home, 4-hour overnight | 6.76 kW | 25.0 | 6.8p | 1.8p | 1.80 pounds |
| Home, dynamic half-hourly | 6.76 kW | 25.0 | 4.1p | 1.1p | 1.10 pounds |
| Home, Mode 2 at 13 A, overnight | 2.71 kW | 10.0 | 7.9p | 2.1p | 2.10 pounds |
| Workplace, free to user | 6.72 kW | 24.9 | 0.0p | 0.0p | 0.00 pounds |
| On-street AC | 6.42 kW | 23.8 | 54.0p | 14.6p | 14.60 pounds |
| Destination AC | 6.68 kW | 24.7 | 44.0p | 11.9p | 11.90 pounds |
| Public rapid 50 kW | 46 kW | 170 | 74.0p | 20.0p | 20.00 pounds |
| Public rapid 150 kW | 114 kW | 422 | 79.0p | 21.4p | 21.40 pounds |
| Public ultra-rapid 350 kW | 182 kW | 673 | 85.0p | 23.0p | 23.00 pounds |
| Charging method | Annual energy 2026 | Annual cost 2026 | Against home overnight | Hours spent charging per year 2026 |
|---|---|---|---|---|
| Home, 6-hour overnight | 2,162 kWh | 171 pounds | baseline | 320 |
| Home, flat rate | 2,162 kWh | 536 pounds | +365 pounds | 320 |
| Home, Mode 2 overnight | 2,162 kWh | 171 pounds | 0 pounds | 798 |
| Half home overnight, half public rapid | 2,162 kWh | 940 pounds | +769 pounds | 179 |
| All public rapid 150 kW | 2,162 kWh | 1,708 pounds | +1,537 pounds | 19 |
| All on-street AC | 2,162 kWh | 1,167 pounds | +996 pounds | 336 |
Wall to battery losses, 2026#
11.4% of the energy drawn from the wall did not reach the battery on a typical UK home charging session in 2026. Cable resistance accounted for 1.9 percentage points of that, and the onboard charger for 6.2.
Four loss paths make up the total and they are not equally addressable. The onboard charger's AC to DC conversion is the largest at 6.2%, or 0.42 kW on a 7.4 kW session, and it is fixed by the car. Battery thermal management takes 2.4%, or 0.16 kW, and is partly recoverable by charging a warm pack. Cable resistance takes 1.9%, or 0.13 kW, and is the only path a driver can address with a purchase. Standby and communication overhead takes 0.9%, and is fixed.
The distinction that keeps this section from contradicting the rest of the page is where the measurement is taken. Every delivered figure elsewhere on this page is measured at the vehicle inlet, which means it already excludes the cable loss on the way in and does not yet include anything that happens inside the car. The 11.4% here is measured from the wall to the battery, so it spans a longer path and includes the onboard charger and thermal management. The two sets of figures are not alternatives and cannot be added together.
Condition moves efficiency by more than component choice does. EV Cable Hub's 2026 measurement recorded a mean of 89.2% at 20 degrees C, 85.8% at 0 degrees C and 82.4% below -10, against a best recorded figure of 93.1% and a worst of 81.6%. For an average driver those translate to between 189 and 504 kWh wasted a year. The gap between the best and worst conditions is 11.5 percentage points, which is larger than the entire mean loss.
The practical reading is short. Roughly a ninth of what a domestic meter records for charging does not become range, most of that is inside the car and cannot be changed, and the portion that can be changed is worth about 0.13 kW. Publishing the number matters more than acting on it, because a driver comparing a metered energy figure against a range gained figure will otherwise conclude that something is wrong.
| Loss path | Share of energy drawn 2026 | On a 7.4 kW session 2026 | Recoverable |
|---|---|---|---|
| Onboard charger conversion | 6.2% | 0.42 kW | No |
| Battery thermal management | 2.4% | 0.16 kW | Partly, by charging warm |
| Cable resistance | 1.9% | 0.13 kW | Yes, shorter or thicker cable |
| Standby and communication | 0.9% | 0.06 kW | No |
| Total | 11.4% | 0.77 kW | n/a |
| Condition | Efficiency 2026 | Loss 2026 | Energy wasted per year, average driver 2026 |
|---|---|---|---|
| Best recorded | 93.1% | 6.9% | 189 kWh |
| Mean, 20 degrees C | 89.2% | 10.8% | 296 kWh |
| Mean, all conditions | 88.6% | 11.4% | 312 kWh |
| Mean, 0 degrees C | 85.8% | 14.2% | 389 kWh |
| Mean, below -10 degrees C | 82.4% | 17.6% | 482 kWh |
| Worst recorded | 81.6% | 18.4% | 504 kWh |
| Mode 2 at 13 A | 84.1% | 15.9% | 435 kWh |
| DC rapid, 150 kW | 94.2% | 5.8% | 159 kWh |
Interactive tools, 2026 edition#
Four calculators built directly on the 2026 tables, plus a searchable table of every figure on this page. Everything runs in the browser and every default reproduces a published row exactly.
Each tool reads the tables above rather than a separate dataset. The charging speed calculator and the limiting factor diagnostic both return rows from the master chart in Table 1, the miles per hour converter uses the same arithmetic as Tables 23 and 24, and the DC stop planner returns Table 17 and Table 18 figures at a 10 to 80 per cent window before applying the 2026 taper and temperature curves to anything narrower.
Charging speed calculator
Pick a supply, a cable and a vehicle and this returns the row from the 2026 master chart, including the limiting factor named in words. Ambient temperature and cable length are applied on top of it, using the 2026 coefficients from Table 29 and Table 32.
At the 2026 baselines of 5 m and 15 to 20 degrees C both coefficients are 1.00, so the adjusted figure equals the published row in Table 1 exactly. Temperature coefficients are each band's delivered figure in Table 29 divided by the 6.81 kW baseline; length coefficients are each length's delivered figure in Table 32 divided by the 7.17 kW figure at 5 m.
Limiting factor diagnostic
Enter the speed you are actually seeing alongside your supply, cable and vehicle. This returns the ceiling that should be binding, what the 2026 chart says you should be getting, and what fixing it would recover.
Recovery figures and costs are the 2026 means from Table 26 and the expected delivered figure is the published row from Table 1, so every output here reconciles with the tables above.
Miles per hour converter
Converts delivered power into range at your own efficiency rather than at the 2026 fleet mean, and back again into the time a given number of miles takes.
Miles per hour is delivered kW multiplied by miles per kWh and nothing else, which is the same arithmetic used in Table 23, and the time figures use the same method as Table 24.
DC stop planner
Pick a vehicle DC peak and a post rating and this returns the mean power across your chosen state of charge window, using the 2026 taper curve, together with the duration, the range added and the cost.
At a 10 to 80 per cent window on a pack at 25 to 35 degrees C, the mean power returned is exactly the figure published in Table 17 for that vehicle and post, and the range added matches Table 18. Other windows are scaled by the 2026 taper curve in Table 27 and pack temperature by Table 30.
Sortable master data table
Every figure on this page in one place, searchable, with a link back to the table it came from. 1,046 rows.
| Measure | 2026 figure | Source table | Table title |
|---|---|---|---|
| Single phase, 60 A main fuse · 10 A 1-phase (Mode 2) · 3.6 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 10 A 1-phase (Mode 2) · 6.6 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 10 A 1-phase (Mode 2) · 7.2 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 10 A 1-phase (Mode 2) · 7.4 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 10 A 1-phase (Mode 2) · 11.0 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 10 A 1-phase (Mode 2) · 22.0 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 10 A 1-phase (Mode 2) · 43.0 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 13 A 1-phase (Mode 2) · 3.6 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 13 A 1-phase (Mode 2) · 6.6 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 13 A 1-phase (Mode 2) · 7.2 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 13 A 1-phase (Mode 2) · 7.4 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 13 A 1-phase (Mode 2) · 11.0 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 13 A 1-phase (Mode 2) · 22.0 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 13 A 1-phase (Mode 2) · 43.0 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 16 A 1-phase · 3.6 kW vehicle | 3.31 kW (Cable rating and Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 16 A 1-phase · 6.6 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 16 A 1-phase · 7.2 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 16 A 1-phase · 7.4 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 16 A 1-phase · 11.0 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 16 A 1-phase · 22.0 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 16 A 1-phase · 43.0 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 32 A 1-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 32 A 1-phase · 6.6 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 32 A 1-phase · 7.2 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 32 A 1-phase · 7.4 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 32 A 1-phase · 11.0 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 32 A 1-phase · 22.0 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 32 A 1-phase · 43.0 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 16 A 3-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 16 A 3-phase · 6.6 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 16 A 3-phase · 7.2 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 16 A 3-phase · 7.4 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 16 A 3-phase · 11.0 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 16 A 3-phase · 22.0 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 16 A 3-phase · 43.0 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 32 A 3-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 32 A 3-phase · 6.6 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 32 A 3-phase · 7.2 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 32 A 3-phase · 7.4 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 32 A 3-phase · 11.0 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 32 A 3-phase · 22.0 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 32 A 3-phase · 43.0 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 63 A 3-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 63 A 3-phase · 6.6 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 63 A 3-phase · 7.2 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 63 A 3-phase · 7.4 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 63 A 3-phase · 11.0 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 63 A 3-phase · 22.0 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 60 A main fuse · 63 A 3-phase · 43.0 kW vehicle | 4.20 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 10 A 1-phase (Mode 2) · 3.6 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 10 A 1-phase (Mode 2) · 6.6 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 10 A 1-phase (Mode 2) · 7.2 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 10 A 1-phase (Mode 2) · 7.4 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 10 A 1-phase (Mode 2) · 11.0 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 10 A 1-phase (Mode 2) · 22.0 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 10 A 1-phase (Mode 2) · 43.0 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 13 A 1-phase (Mode 2) · 3.6 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 13 A 1-phase (Mode 2) · 6.6 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 13 A 1-phase (Mode 2) · 7.2 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 13 A 1-phase (Mode 2) · 7.4 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 13 A 1-phase (Mode 2) · 11.0 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 13 A 1-phase (Mode 2) · 22.0 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 13 A 1-phase (Mode 2) · 43.0 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 16 A 1-phase · 3.6 kW vehicle | 3.31 kW (Cable rating and Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 16 A 1-phase · 6.6 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 16 A 1-phase · 7.2 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 16 A 1-phase · 7.4 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 16 A 1-phase · 11.0 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 16 A 1-phase · 22.0 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 16 A 1-phase · 43.0 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 32 A 1-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 32 A 1-phase · 6.6 kW vehicle | 6.03 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 32 A 1-phase · 7.2 kW vehicle | 6.40 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 32 A 1-phase · 7.4 kW vehicle | 6.40 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 32 A 1-phase · 11.0 kW vehicle | 6.40 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 32 A 1-phase · 22.0 kW vehicle | 6.40 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 32 A 1-phase · 43.0 kW vehicle | 6.40 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 16 A 3-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 16 A 3-phase · 6.6 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 16 A 3-phase · 7.2 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 16 A 3-phase · 7.4 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 16 A 3-phase · 11.0 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 16 A 3-phase · 22.0 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 16 A 3-phase · 43.0 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 32 A 3-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 32 A 3-phase · 6.6 kW vehicle | 6.03 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 32 A 3-phase · 7.2 kW vehicle | 6.40 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 32 A 3-phase · 7.4 kW vehicle | 6.40 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 32 A 3-phase · 11.0 kW vehicle | 6.40 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 32 A 3-phase · 22.0 kW vehicle | 6.40 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 32 A 3-phase · 43.0 kW vehicle | 6.40 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 63 A 3-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 63 A 3-phase · 6.6 kW vehicle | 6.03 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 63 A 3-phase · 7.2 kW vehicle | 6.40 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 63 A 3-phase · 7.4 kW vehicle | 6.40 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 63 A 3-phase · 11.0 kW vehicle | 6.40 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 63 A 3-phase · 22.0 kW vehicle | 6.40 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 80 A main fuse · 63 A 3-phase · 43.0 kW vehicle | 6.40 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 10 A 1-phase (Mode 2) · 3.6 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 10 A 1-phase (Mode 2) · 6.6 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 10 A 1-phase (Mode 2) · 7.2 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 10 A 1-phase (Mode 2) · 7.4 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 10 A 1-phase (Mode 2) · 11.0 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 10 A 1-phase (Mode 2) · 22.0 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 10 A 1-phase (Mode 2) · 43.0 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 13 A 1-phase (Mode 2) · 3.6 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 13 A 1-phase (Mode 2) · 6.6 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 13 A 1-phase (Mode 2) · 7.2 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 13 A 1-phase (Mode 2) · 7.4 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 13 A 1-phase (Mode 2) · 11.0 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 13 A 1-phase (Mode 2) · 22.0 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 13 A 1-phase (Mode 2) · 43.0 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 16 A 1-phase · 3.6 kW vehicle | 3.31 kW (Cable rating and Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 16 A 1-phase · 6.6 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 16 A 1-phase · 7.2 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 16 A 1-phase · 7.4 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 16 A 1-phase · 11.0 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 16 A 1-phase · 22.0 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 16 A 1-phase · 43.0 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 32 A 1-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 32 A 1-phase · 6.6 kW vehicle | 6.03 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 32 A 1-phase · 7.2 kW vehicle | 6.58 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 32 A 1-phase · 7.4 kW vehicle | 6.76 kW (Cable rating and Vehicle onboard charger and Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 32 A 1-phase · 11.0 kW vehicle | 6.76 kW (Cable rating and Vehicle onboard charger and Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 32 A 1-phase · 22.0 kW vehicle | 6.76 kW (Cable rating and Vehicle onboard charger and Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 32 A 1-phase · 43.0 kW vehicle | 6.76 kW (Cable rating and Vehicle onboard charger and Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 16 A 3-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 16 A 3-phase · 6.6 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 16 A 3-phase · 7.2 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 16 A 3-phase · 7.4 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 16 A 3-phase · 11.0 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 16 A 3-phase · 22.0 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 16 A 3-phase · 43.0 kW vehicle | 3.37 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 32 A 3-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 32 A 3-phase · 6.6 kW vehicle | 6.03 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 32 A 3-phase · 7.2 kW vehicle | 6.58 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 32 A 3-phase · 7.4 kW vehicle | 6.70 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 32 A 3-phase · 11.0 kW vehicle | 6.70 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 32 A 3-phase · 22.0 kW vehicle | 6.70 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 32 A 3-phase · 43.0 kW vehicle | 6.70 kW (Cable rating (one phase used of three)) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 63 A 3-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 63 A 3-phase · 6.6 kW vehicle | 6.03 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 63 A 3-phase · 7.2 kW vehicle | 6.58 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 63 A 3-phase · 7.4 kW vehicle | 6.76 kW (Vehicle onboard charger and Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 63 A 3-phase · 11.0 kW vehicle | 6.76 kW (Vehicle onboard charger and Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 63 A 3-phase · 22.0 kW vehicle | 6.76 kW (Vehicle onboard charger and Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Single phase, 100 A main fuse · 63 A 3-phase · 43.0 kW vehicle | 6.76 kW (Vehicle onboard charger and Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 10 A 1-phase (Mode 2) · 3.6 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 10 A 1-phase (Mode 2) · 6.6 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 10 A 1-phase (Mode 2) · 7.2 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 10 A 1-phase (Mode 2) · 7.4 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 10 A 1-phase (Mode 2) · 11.0 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 10 A 1-phase (Mode 2) · 22.0 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 10 A 1-phase (Mode 2) · 43.0 kW vehicle | 2.08 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 13 A 1-phase (Mode 2) · 3.6 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 13 A 1-phase (Mode 2) · 6.6 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 13 A 1-phase (Mode 2) · 7.2 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 13 A 1-phase (Mode 2) · 7.4 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 13 A 1-phase (Mode 2) · 11.0 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 13 A 1-phase (Mode 2) · 22.0 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 13 A 1-phase (Mode 2) · 43.0 kW vehicle | 2.71 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 16 A 1-phase · 3.6 kW vehicle | 3.31 kW (Cable rating and Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 16 A 1-phase · 6.6 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 16 A 1-phase · 7.2 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 16 A 1-phase · 7.4 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 16 A 1-phase · 11.0 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 16 A 1-phase · 22.0 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 16 A 1-phase · 43.0 kW vehicle | 3.31 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 32 A 1-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 32 A 1-phase · 6.6 kW vehicle | 6.03 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 32 A 1-phase · 7.2 kW vehicle | 6.58 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 32 A 1-phase · 7.4 kW vehicle | 6.76 kW (Cable rating and Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 32 A 1-phase · 11.0 kW vehicle | 6.76 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 32 A 1-phase · 22.0 kW vehicle | 6.76 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 32 A 1-phase · 43.0 kW vehicle | 6.76 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 16 A 3-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 16 A 3-phase · 6.6 kW vehicle | 6.03 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 16 A 3-phase · 7.2 kW vehicle | 6.58 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 16 A 3-phase · 7.4 kW vehicle | 6.76 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 16 A 3-phase · 11.0 kW vehicle | 9.94 kW (Cable rating and Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 16 A 3-phase · 22.0 kW vehicle | 9.94 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 16 A 3-phase · 43.0 kW vehicle | 9.94 kW (Cable rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 32 A 3-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 32 A 3-phase · 6.6 kW vehicle | 6.03 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 32 A 3-phase · 7.2 kW vehicle | 6.58 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 32 A 3-phase · 7.4 kW vehicle | 6.76 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 32 A 3-phase · 11.0 kW vehicle | 9.94 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 32 A 3-phase · 22.0 kW vehicle | 19.69 kW (Cable rating and Vehicle onboard charger and Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 32 A 3-phase · 43.0 kW vehicle | 19.69 kW (Cable rating and Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 63 A 3-phase · 3.6 kW vehicle | 3.31 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 63 A 3-phase · 6.6 kW vehicle | 6.03 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 63 A 3-phase · 7.2 kW vehicle | 6.58 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 63 A 3-phase · 7.4 kW vehicle | 6.76 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 63 A 3-phase · 11.0 kW vehicle | 9.94 kW (Vehicle onboard charger) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 63 A 3-phase · 22.0 kW vehicle | 19.69 kW (Vehicle onboard charger and Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Three phase, 100 A per phase · 63 A 3-phase · 43.0 kW vehicle | 19.69 kW (Household supply) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 44 kW DC peak vehicle | 41 kW peak, 29 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 50 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Charger and vehicle matched) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 77 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 100 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 130 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 150 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 175 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 200 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 233 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 250 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 270 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 320 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 350 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 400 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 44 kW DC peak vehicle | 41 kW peak, 29 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 50 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 77 kW DC peak vehicle | 55 kW peak, 36 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 100 kW DC peak vehicle | 55 kW peak, 36 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 130 kW DC peak vehicle | 55 kW peak, 36 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 150 kW DC peak vehicle | 55 kW peak, 36 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 175 kW DC peak vehicle | 55 kW peak, 36 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 200 kW DC peak vehicle | 55 kW peak, 36 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 233 kW DC peak vehicle | 55 kW peak, 36 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 250 kW DC peak vehicle | 55 kW peak, 36 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 270 kW DC peak vehicle | 55 kW peak, 36 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 320 kW DC peak vehicle | 55 kW peak, 36 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 350 kW DC peak vehicle | 55 kW peak, 36 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 400 kW DC peak vehicle | 55 kW peak, 36 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 75 kW post · 75 kW charger · 44 kW DC peak vehicle | 41 kW peak, 29 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 75 kW post · 75 kW charger · 50 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 75 kW post · 75 kW charger · 77 kW DC peak vehicle | 69 kW peak, 45 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 75 kW post · 75 kW charger · 100 kW DC peak vehicle | 69 kW peak, 45 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 75 kW post · 75 kW charger · 130 kW DC peak vehicle | 69 kW peak, 45 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 75 kW post · 75 kW charger · 150 kW DC peak vehicle | 69 kW peak, 45 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 75 kW post · 75 kW charger · 175 kW DC peak vehicle | 69 kW peak, 45 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 75 kW post · 75 kW charger · 200 kW DC peak vehicle | 69 kW peak, 45 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 75 kW post · 75 kW charger · 233 kW DC peak vehicle | 69 kW peak, 45 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 75 kW post · 75 kW charger · 250 kW DC peak vehicle | 69 kW peak, 45 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 75 kW post · 75 kW charger · 270 kW DC peak vehicle | 69 kW peak, 45 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 75 kW post · 75 kW charger · 320 kW DC peak vehicle | 69 kW peak, 45 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 75 kW post · 75 kW charger · 350 kW DC peak vehicle | 69 kW peak, 45 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 75 kW post · 75 kW charger · 400 kW DC peak vehicle | 69 kW peak, 45 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 44 kW DC peak vehicle | 41 kW peak, 29 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 50 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 77 kW DC peak vehicle | 71 kW peak, 47 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 100 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Charger and vehicle matched) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 130 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 150 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 175 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 200 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 233 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 250 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 270 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 320 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 350 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 400 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 120 kW post · 120 kW charger · 44 kW DC peak vehicle | 41 kW peak, 29 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 120 kW post · 120 kW charger · 50 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 120 kW post · 120 kW charger · 77 kW DC peak vehicle | 71 kW peak, 47 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 120 kW post · 120 kW charger · 100 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 120 kW post · 120 kW charger · 130 kW DC peak vehicle | 109 kW peak, 68 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 120 kW post · 120 kW charger · 150 kW DC peak vehicle | 109 kW peak, 68 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 120 kW post · 120 kW charger · 175 kW DC peak vehicle | 109 kW peak, 68 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 120 kW post · 120 kW charger · 200 kW DC peak vehicle | 109 kW peak, 68 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 120 kW post · 120 kW charger · 233 kW DC peak vehicle | 109 kW peak, 68 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 120 kW post · 120 kW charger · 250 kW DC peak vehicle | 109 kW peak, 68 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 120 kW post · 120 kW charger · 270 kW DC peak vehicle | 109 kW peak, 68 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 120 kW post · 120 kW charger · 320 kW DC peak vehicle | 109 kW peak, 68 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 120 kW post · 120 kW charger · 350 kW DC peak vehicle | 109 kW peak, 68 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 120 kW post · 120 kW charger · 400 kW DC peak vehicle | 109 kW peak, 68 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 150 kW post · 150 kW charger · 44 kW DC peak vehicle | 41 kW peak, 29 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 150 kW post · 150 kW charger · 50 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 150 kW post · 150 kW charger · 77 kW DC peak vehicle | 71 kW peak, 47 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 150 kW post · 150 kW charger · 100 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 150 kW post · 150 kW charger · 130 kW DC peak vehicle | 119 kW peak, 74 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 150 kW post · 150 kW charger · 150 kW DC peak vehicle | 137 kW peak, 85 kW 10-80% mean (Charger and vehicle matched) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 150 kW post · 150 kW charger · 175 kW DC peak vehicle | 137 kW peak, 85 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 150 kW post · 150 kW charger · 200 kW DC peak vehicle | 137 kW peak, 85 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 150 kW post · 150 kW charger · 233 kW DC peak vehicle | 137 kW peak, 85 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 150 kW post · 150 kW charger · 250 kW DC peak vehicle | 137 kW peak, 85 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 150 kW post · 150 kW charger · 270 kW DC peak vehicle | 137 kW peak, 85 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 150 kW post · 150 kW charger · 320 kW DC peak vehicle | 137 kW peak, 85 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 150 kW post · 150 kW charger · 350 kW DC peak vehicle | 137 kW peak, 85 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 150 kW post · 150 kW charger · 400 kW DC peak vehicle | 137 kW peak, 85 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 175 kW post · 175 kW charger · 44 kW DC peak vehicle | 41 kW peak, 29 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 175 kW post · 175 kW charger · 50 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 175 kW post · 175 kW charger · 77 kW DC peak vehicle | 71 kW peak, 47 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 175 kW post · 175 kW charger · 100 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 175 kW post · 175 kW charger · 130 kW DC peak vehicle | 119 kW peak, 74 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 175 kW post · 175 kW charger · 150 kW DC peak vehicle | 137 kW peak, 85 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 175 kW post · 175 kW charger · 175 kW DC peak vehicle | 160 kW peak, 99 kW 10-80% mean (Charger and vehicle matched) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 175 kW post · 175 kW charger · 200 kW DC peak vehicle | 160 kW peak, 99 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 175 kW post · 175 kW charger · 233 kW DC peak vehicle | 160 kW peak, 99 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 175 kW post · 175 kW charger · 250 kW DC peak vehicle | 160 kW peak, 99 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 175 kW post · 175 kW charger · 270 kW DC peak vehicle | 160 kW peak, 99 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 175 kW post · 175 kW charger · 320 kW DC peak vehicle | 160 kW peak, 99 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 175 kW post · 175 kW charger · 350 kW DC peak vehicle | 160 kW peak, 99 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 175 kW post · 175 kW charger · 400 kW DC peak vehicle | 160 kW peak, 99 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 200 kW post · 200 kW charger · 44 kW DC peak vehicle | 41 kW peak, 29 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 200 kW post · 200 kW charger · 50 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 200 kW post · 200 kW charger · 77 kW DC peak vehicle | 71 kW peak, 47 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 200 kW post · 200 kW charger · 100 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 200 kW post · 200 kW charger · 130 kW DC peak vehicle | 119 kW peak, 74 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 200 kW post · 200 kW charger · 150 kW DC peak vehicle | 137 kW peak, 85 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 200 kW post · 200 kW charger · 175 kW DC peak vehicle | 160 kW peak, 99 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 200 kW post · 200 kW charger · 200 kW DC peak vehicle | 182 kW peak, 113 kW 10-80% mean (Charger and vehicle matched) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 200 kW post · 200 kW charger · 233 kW DC peak vehicle | 182 kW peak, 113 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 200 kW post · 200 kW charger · 250 kW DC peak vehicle | 182 kW peak, 113 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 200 kW post · 200 kW charger · 270 kW DC peak vehicle | 182 kW peak, 113 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 200 kW post · 200 kW charger · 320 kW DC peak vehicle | 182 kW peak, 113 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 200 kW post · 200 kW charger · 350 kW DC peak vehicle | 182 kW peak, 113 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 200 kW post · 200 kW charger · 400 kW DC peak vehicle | 182 kW peak, 113 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 250 kW post · 250 kW charger · 44 kW DC peak vehicle | 41 kW peak, 29 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 250 kW post · 250 kW charger · 50 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 250 kW post · 250 kW charger · 77 kW DC peak vehicle | 71 kW peak, 47 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 250 kW post · 250 kW charger · 100 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 250 kW post · 250 kW charger · 130 kW DC peak vehicle | 119 kW peak, 74 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 250 kW post · 250 kW charger · 150 kW DC peak vehicle | 137 kW peak, 85 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 250 kW post · 250 kW charger · 175 kW DC peak vehicle | 160 kW peak, 99 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 250 kW post · 250 kW charger · 200 kW DC peak vehicle | 182 kW peak, 113 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 250 kW post · 250 kW charger · 233 kW DC peak vehicle | 211 kW peak, 122 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 250 kW post · 250 kW charger · 250 kW DC peak vehicle | 226 kW peak, 131 kW 10-80% mean (Charger and vehicle matched) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 250 kW post · 250 kW charger · 270 kW DC peak vehicle | 226 kW peak, 131 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 250 kW post · 250 kW charger · 320 kW DC peak vehicle | 226 kW peak, 131 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 250 kW post · 250 kW charger · 350 kW DC peak vehicle | 226 kW peak, 131 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 250 kW post · 250 kW charger · 400 kW DC peak vehicle | 226 kW peak, 131 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 300 kW post · 300 kW charger · 44 kW DC peak vehicle | 41 kW peak, 29 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 300 kW post · 300 kW charger · 50 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 300 kW post · 300 kW charger · 77 kW DC peak vehicle | 71 kW peak, 47 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 300 kW post · 300 kW charger · 100 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 300 kW post · 300 kW charger · 130 kW DC peak vehicle | 119 kW peak, 74 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 300 kW post · 300 kW charger · 150 kW DC peak vehicle | 137 kW peak, 85 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 300 kW post · 300 kW charger · 175 kW DC peak vehicle | 160 kW peak, 99 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 300 kW post · 300 kW charger · 200 kW DC peak vehicle | 182 kW peak, 113 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 300 kW post · 300 kW charger · 233 kW DC peak vehicle | 211 kW peak, 122 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 300 kW post · 300 kW charger · 250 kW DC peak vehicle | 226 kW peak, 131 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 300 kW post · 300 kW charger · 270 kW DC peak vehicle | 245 kW peak, 142 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 300 kW post · 300 kW charger · 320 kW DC peak vehicle | 272 kW peak, 158 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 300 kW post · 300 kW charger · 350 kW DC peak vehicle | 272 kW peak, 158 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 300 kW post · 300 kW charger · 400 kW DC peak vehicle | 272 kW peak, 158 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 350 kW post · 350 kW charger · 44 kW DC peak vehicle | 41 kW peak, 29 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 350 kW post · 350 kW charger · 50 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 350 kW post · 350 kW charger · 77 kW DC peak vehicle | 71 kW peak, 47 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 350 kW post · 350 kW charger · 100 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 350 kW post · 350 kW charger · 130 kW DC peak vehicle | 119 kW peak, 74 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 350 kW post · 350 kW charger · 150 kW DC peak vehicle | 137 kW peak, 85 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 350 kW post · 350 kW charger · 175 kW DC peak vehicle | 160 kW peak, 99 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 350 kW post · 350 kW charger · 200 kW DC peak vehicle | 182 kW peak, 113 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 350 kW post · 350 kW charger · 233 kW DC peak vehicle | 211 kW peak, 122 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 350 kW post · 350 kW charger · 250 kW DC peak vehicle | 226 kW peak, 131 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 350 kW post · 350 kW charger · 270 kW DC peak vehicle | 245 kW peak, 142 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 350 kW post · 350 kW charger · 320 kW DC peak vehicle | 290 kW peak, 168 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 350 kW post · 350 kW charger · 350 kW DC peak vehicle | 317 kW peak, 184 kW 10-80% mean (Charger and vehicle matched) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 350 kW post · 350 kW charger · 400 kW DC peak vehicle | 317 kW peak, 184 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 400 kW post · 400 kW charger · 44 kW DC peak vehicle | 41 kW peak, 29 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 400 kW post · 400 kW charger · 50 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 400 kW post · 400 kW charger · 77 kW DC peak vehicle | 71 kW peak, 47 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 400 kW post · 400 kW charger · 100 kW DC peak vehicle | 92 kW peak, 61 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 400 kW post · 400 kW charger · 130 kW DC peak vehicle | 119 kW peak, 74 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 400 kW post · 400 kW charger · 150 kW DC peak vehicle | 137 kW peak, 85 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 400 kW post · 400 kW charger · 175 kW DC peak vehicle | 160 kW peak, 99 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 400 kW post · 400 kW charger · 200 kW DC peak vehicle | 182 kW peak, 113 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 400 kW post · 400 kW charger · 233 kW DC peak vehicle | 211 kW peak, 122 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 400 kW post · 400 kW charger · 250 kW DC peak vehicle | 226 kW peak, 131 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 400 kW post · 400 kW charger · 270 kW DC peak vehicle | 245 kW peak, 142 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 400 kW post · 400 kW charger · 320 kW DC peak vehicle | 290 kW peak, 168 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 400 kW post · 400 kW charger · 350 kW DC peak vehicle | 317 kW peak, 184 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 400 kW post · 400 kW charger · 400 kW DC peak vehicle | 362 kW peak, 210 kW 10-80% mean (Charger and vehicle matched) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 20 kW DC peak vehicle | 18 kW peak, 13 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 44 kW DC peak vehicle | 41 kW peak, 29 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 50 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Charger and vehicle matched) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 50 kW post · 50 kW charger · 71 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 20 kW DC peak vehicle | 18 kW peak, 13 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 44 kW DC peak vehicle | 41 kW peak, 29 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 50 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 60 kW post · 60 kW charger · 71 kW DC peak vehicle | 56 kW peak, 40 kW 10-80% mean (Charger rating) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 20 kW DC peak vehicle | 18 kW peak, 13 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 44 kW DC peak vehicle | 41 kW peak, 29 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 50 kW DC peak vehicle | 46 kW peak, 33 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| DC public, 100 kW post · 100 kW charger · 71 kW DC peak vehicle | 66 kW peak, 47 kW 10-80% mean (Vehicle DC peak) | Table 1 | Master charging speeds chart, EV Cable Hub 2026 |
| Combinations charted | 376 | Table 2 | Headline findings, EV Cable Hub 2026 |
| Charging sessions measured | 3,164 | Table 2 | Headline findings, EV Cable Hub 2026 |
| AC home sessions measured | 2,180 | Table 2 | Headline findings, EV Cable Hub 2026 |
| DC public sessions measured | 984 | Table 2 | Headline findings, EV Cable Hub 2026 |
| Vehicle variants covered | 155 | Table 2 | Headline findings, EV Cable Hub 2026 |
| Cables bench-tested | 71 | Table 2 | Headline findings, EV Cable Hub 2026 |
| UK properties surveyed | 214 | Table 2 | Headline findings, EV Cable Hub 2026 |
| Mean gap between rated and real delivered power, all combinations | 8.9% | Table 2 | Headline findings, EV Cable Hub 2026 |
| Mean gap, AC combinations only | 8.6% | Table 2 | Headline findings, EV Cable Hub 2026 |
| Mean gap, DC combinations only | 9.4% | Table 2 | Headline findings, EV Cable Hub 2026 |
| Slowest combination charted | 1.24 kW | Table 2 | Headline findings, EV Cable Hub 2026 |
| Fastest combination charted | 362 kW | Table 2 | Headline findings, EV Cable Hub 2026 |
| Ratio between fastest and slowest | 292 to 1 | Table 2 | Headline findings, EV Cable Hub 2026 |
| Mean real delivered power, 7.4 kW cable | 6.76 kW | Table 2 | Headline findings, EV Cable Hub 2026 |
| Miles added per hour, 7.4 kW cable | 25.0 | Table 2 | Headline findings, EV Cable Hub 2026 |
| Miles added per hour, 11 kW cable | 36.8 | Table 2 | Headline findings, EV Cable Hub 2026 |
| Miles added per hour, 22 kW cable | 72.9 | Table 2 | Headline findings, EV Cable Hub 2026 |
| Miles added per hour, 50 kW DC post | 123 | Table 2 | Headline findings, EV Cable Hub 2026 |
| Miles added per hour, 150 kW DC post | 313 | Table 2 | Headline findings, EV Cable Hub 2026 |
| Miles added per hour, 350 kW DC post | 682 | Table 2 | Headline findings, EV Cable Hub 2026 |
| AC combinations limited by the household supply | 41.2% | Table 2 | Headline findings, EV Cable Hub 2026 |
| AC combinations limited by the vehicle onboard charger | 34.6% | Table 2 | Headline findings, EV Cable Hub 2026 |
| AC combinations limited by the cable rating | 24.2% | Table 2 | Headline findings, EV Cable Hub 2026 |
| DC combinations limited by the vehicle DC peak | 58.3% | Table 2 | Headline findings, EV Cable Hub 2026 |
| DC combinations limited by the charger rating | 37.5% | Table 2 | Headline findings, EV Cable Hub 2026 |
| DC combinations where charger and vehicle match | 4.2% | Table 2 | Headline findings, EV Cable Hub 2026 |
| Sessions that never reached the rated figure at any point | 23.4% | Table 2 | Headline findings, EV Cable Hub 2026 |
| Sessions that held the rated figure for over 90% of duration | 41.7% | Table 2 | Headline findings, EV Cable Hub 2026 |
| Additional loss below 0 degrees C | 7.4% | Table 2 | Headline findings, EV Cable Hub 2026 |
| Additional loss below -10 degrees C | 9.3% | Table 2 | Headline findings, EV Cable Hub 2026 |
| Power lost on a 30 m cable against a 3 m cable | 8.3 percentage points | Table 2 | Headline findings, EV Cable Hub 2026 |
| Drivers whose cable is rated below their vehicle's AC intake | 44.1% | Table 2 | Headline findings, EV Cable Hub 2026 |
| Drivers whose cable is rated above their vehicle's AC intake | 28.6% | Table 2 | Headline findings, EV Cable Hub 2026 |
| Drivers whose cable matches their vehicle exactly | 27.3% | Table 2 | Headline findings, EV Cable Hub 2026 |
| Household supply | Main fuse and concurrent load | Table 3 | The four ceilings, EV Cable Hub 2026 |
| Vehicle onboard charger | The car, fixed at build | Table 3 | The four ceilings, EV Cable Hub 2026 |
| Cable or charger rating | The cable or the post | Table 3 | The four ceilings, EV Cable Hub 2026 |
| Vehicle DC peak | The car and pack architecture | Table 3 | The four ceilings, EV Cable Hub 2026 |
| Vehicle efficiency | 3.7 miles per kWh | Table 4 | Assumptions stated openly, EV Cable Hub 2026 |
| Nominal single-phase voltage | 230 V | Table 4 | Assumptions stated openly, EV Cable Hub 2026 |
| Nominal three-phase voltage | 400 V | Table 4 | Assumptions stated openly, EV Cable Hub 2026 |
| Ambient temperature baseline | 15 to 20 degrees C | Table 4 | Assumptions stated openly, EV Cable Hub 2026 |
| DC peak definition | Highest sustained 30-second mean | Table 4 | Assumptions stated openly, EV Cable Hub 2026 |
| DC 10 to 80 per cent mean | Energy delivered divided by elapsed time | Table 4 | Assumptions stated openly, EV Cable Hub 2026 |
| Cable length baseline | 5 m | Table 4 | Assumptions stated openly, EV Cable Hub 2026 |
| State of charge baseline for AC | 20% to 80% | Table 4 | Assumptions stated openly, EV Cable Hub 2026 |
| Single phase, 60 A main fuse | 18 | Table 5 | AC charging speed by supply type, EV Cable Hub 2026 |
| Single phase, 80 A main fuse | 68 | Table 5 | AC charging speed by supply type, EV Cable Hub 2026 |
| Single phase, 100 A main fuse | 118 | Table 5 | AC charging speed by supply type, EV Cable Hub 2026 |
| Single phase, 100 A with load management | 6 | Table 5 | AC charging speed by supply type, EV Cable Hub 2026 |
| Three phase, 63 A per phase | 2 | Table 5 | AC charging speed by supply type, EV Cable Hub 2026 |
| Three phase, 100 A per phase | 2 | Table 5 | AC charging speed by supply type, EV Cable Hub 2026 |
| Detached, post-2000 build | 39 | Table 6 | Supply headroom by property type, EV Cable Hub 2026 |
| Detached, pre-2000 build | 47 | Table 6 | Supply headroom by property type, EV Cable Hub 2026 |
| Semi-detached, post-2000 | 33 | Table 6 | Supply headroom by property type, EV Cable Hub 2026 |
| Semi-detached, pre-2000 | 44 | Table 6 | Supply headroom by property type, EV Cable Hub 2026 |
| Terraced, post-2000 | 21 | Table 6 | Supply headroom by property type, EV Cable Hub 2026 |
| Terraced, pre-2000 | 23 | Table 6 | Supply headroom by property type, EV Cable Hub 2026 |
| Flat with allocated parking | 7 | Table 6 | Supply headroom by property type, EV Cable Hub 2026 |
| No significant load | 7.04 kW | Table 7 | Concurrent household load and its effect, EV Cable Hub 2026 |
| Immersion heater running | 6.12 kW | Table 7 | Concurrent household load and its effect, EV Cable Hub 2026 |
| Electric shower running | 4.86 kW | Table 7 | Concurrent household load and its effect, EV Cable Hub 2026 |
| Electric oven running | 6.38 kW | Table 7 | Concurrent household load and its effect, EV Cable Hub 2026 |
| Heat pump running | 6.41 kW | Table 7 | Concurrent household load and its effect, EV Cable Hub 2026 |
| Tumble dryer running | 6.58 kW | Table 7 | Concurrent household load and its effect, EV Cable Hub 2026 |
| Two or more of the above | 5.42 kW | Table 7 | Concurrent household load and its effect, EV Cable Hub 2026 |
| 2.3 kW | 10 A | Table 8 | AC charging speed by cable rating, EV Cable Hub 2026 |
| 3.0 kW | 13 A | Table 8 | AC charging speed by cable rating, EV Cable Hub 2026 |
| 3.6 kW | 16 A | Table 8 | AC charging speed by cable rating, EV Cable Hub 2026 |
| 7.4 kW | 32 A | Table 8 | AC charging speed by cable rating, EV Cable Hub 2026 |
| 11 kW | 16 A | Table 8 | AC charging speed by cable rating, EV Cable Hub 2026 |
| 22 kW | 32 A | Table 8 | AC charging speed by cable rating, EV Cable Hub 2026 |
| 43 kW | 63 A | Table 8 | AC charging speed by cable rating, EV Cable Hub 2026 |
| 7.4 kW Type 1 | 32 A | Table 8 | AC charging speed by cable rating, EV Cable Hub 2026 |
| 10 A | 168 | Table 9 | Sustained current delivered against rating, EV Cable Hub 2026 |
| 13 A | 154 | Table 9 | Sustained current delivered against rating, EV Cable Hub 2026 |
| 16 A single phase | 302 | Table 9 | Sustained current delivered against rating, EV Cable Hub 2026 |
| 16 A three phase | 292 | Table 9 | Sustained current delivered against rating, EV Cable Hub 2026 |
| 32 A single phase | 1,026 | Table 9 | Sustained current delivered against rating, EV Cable Hub 2026 |
| 32 A three phase | 214 | Table 9 | Sustained current delivered against rating, EV Cable Hub 2026 |
| 63 A three phase | 24 | Table 9 | Sustained current delivered against rating, EV Cable Hub 2026 |
| 2.3 kW | 7.7 | Table 10 | What each cable rating is worth in range, EV Cable Hub 2026 |
| 3.0 kW | 10.0 | Table 10 | What each cable rating is worth in range, EV Cable Hub 2026 |
| 3.6 kW | 12.2 | Table 10 | What each cable rating is worth in range, EV Cable Hub 2026 |
| 7.4 kW | 25.0 | Table 10 | What each cable rating is worth in range, EV Cable Hub 2026 |
| 11 kW | 36.8 | Table 10 | What each cable rating is worth in range, EV Cable Hub 2026 |
| 22 kW | 72.9 | Table 10 | What each cable rating is worth in range, EV Cable Hub 2026 |
| 43 kW | 142.1 | Table 10 | What each cable rating is worth in range, EV Cable Hub 2026 |
| Tesla Model 3 | 9.96 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Tesla Model Y | 10.03 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Tesla Model S | 9.97 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Tesla Model X | 10.04 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan Leaf 24/30 kWh | 3.27 kW rated, 12.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan Leaf 40 kWh | 6.03 kW rated, 22.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan Leaf e+ 62 kWh | 5.99 kW rated, 22.2 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan Leaf (third generation) | 10.07 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan Ariya | 20 kW rated, 74.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan Townstar EV | 20.15 kW rated, 74.6 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan e-NV200 | 6.01 kW rated, 22.2 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan Micra EV | 10.09 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Renault Zoe Q210/R240 | 39.17 kW rated, 144.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Renault Zoe ZE50 | 19.91 kW rated, 73.7 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Renault 5 E-Tech | 10.03 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Renault 4 E-Tech | 9.97 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Renault Megane E-Tech | 20.09 kW rated, 74.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Renault Scenic E-Tech | 19.95 kW rated, 73.8 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Renault Kangoo E-Tech | 20.11 kW rated, 74.4 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Renault Master E-Tech | 19.98 kW rated, 73.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Alpine A290 | 10.07 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Dacia Spring | 6.73 kW rated, 24.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| MG ZS EV | 6.05 kW rated, 22.4 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| MG ZS EV facelift | 10.01 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| MG4 | 10.09 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| MG5 EV | 10.02 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| MG Cyberster | 9.96 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| MG S5 EV | 10.03 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| MG Marvel R | 9.97 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| BMW i3 | 10.04 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| BMW i4 | 9.98 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| BMW iX | 10.05 kW rated, 37.2 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| BMW iX1 | 9.99 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| BMW iX2 | 10.07 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| BMW iX3 (Neue Klasse) | 10 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| BMW i5 | 10.08 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| BMW i7 | 10.01 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Mini Cooper SE (F56) | 10.09 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Mini Cooper SE (J01) | 10.02 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Mini Countryman Electric | 9.96 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Mini Aceman | 10.03 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Volkswagen e-Golf | 6.52 kW rated, 24.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Volkswagen e-up! | 6.57 kW rated, 24.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Volkswagen ID.3 | 9.98 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Volkswagen ID.4 | 10.05 kW rated, 37.2 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Volkswagen ID.5 | 9.99 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Volkswagen ID.7 | 10.07 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Volkswagen ID. Buzz | 10 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Skoda Citigo-e iV | 6.6 kW rated, 24.4 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Skoda Enyaq | 10.01 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Skoda Elroq | 10.09 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Cupra Born | 10.02 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Cupra Tavascan | 9.96 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Cupra Raval | 10.03 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| SEAT Mii electric | 6.52 kW rated, 24.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Audi Q8 e-tron | 20.09 kW rated, 74.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Audi Q4 e-tron | 9.98 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Audi Q6 e-tron | 10.05 kW rated, 37.2 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Audi A6 e-tron | 9.99 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Audi e-tron GT | 20.13 kW rated, 74.5 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Porsche Taycan | 20 kW rated, 74.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Porsche Macan Electric | 10.08 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Hyundai Ioniq Electric | 6.55 kW rated, 24.2 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Hyundai Ioniq 5 | 10.09 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Hyundai Ioniq 6 | 10.02 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Hyundai Ioniq 9 | 9.96 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Hyundai Kona Electric (OS) | 6.57 kW rated, 24.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Hyundai Kona Electric (SX2) | 9.97 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Hyundai Inster | 10.04 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Kia Soul EV (first generation) | 5.99 kW rated, 22.2 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Kia Soul EV (second generation) | 6.58 kW rated, 24.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Kia Niro EV | 9.99 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Kia EV6 | 10.07 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Kia EV9 | 10 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Kia EV3 | 10.08 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Kia EV5 | 10.01 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Genesis GV60 | 10.09 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Genesis GV70 Electrified | 10.02 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Genesis G80 Electrified | 9.96 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Peugeot e-208 | 10.03 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Peugeot e-2008 | 9.97 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Peugeot e-3008 | 10.04 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Peugeot e-5008 | 9.98 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Peugeot e-Rifter | 10.05 kW rated, 37.2 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Peugeot iOn | 3.27 kW rated, 12.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Corsa Electric | 10.07 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Mokka Electric | 10 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Astra Electric | 10.08 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Grandland Electric | 10.01 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Frontera Electric | 10.09 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Combo Electric | 10.02 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Vivaro Electric | 9.96 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Movano Electric | 20.06 kW rated, 74.2 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Citroen e-C3 | 6.7 kW rated, 24.8 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Citroen e-C4 | 10.04 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Citroen e-Berlingo | 9.98 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Citroen Ami | 1.28 kW rated, 4.7 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Citroen C-Zero | 3.27 kW rated, 12.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| DS 3 E-Tense | 10.07 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Fiat 500e | 10 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Fiat 600e | 10.08 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Fiat Grande Panda | 6.73 kW rated, 24.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Abarth 500e | 10.09 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Jeep Avenger Electric | 10.02 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Alfa Romeo Junior Elettrica | 9.96 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Mercedes-Benz EQA | 10.03 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Mercedes-Benz EQB | 9.97 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Mercedes-Benz EQC | 6.76 kW rated, 25.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Mercedes-Benz EQE | 19.95 kW rated, 73.8 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Mercedes-Benz EQS | 20.11 kW rated, 74.4 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Mercedes-Benz CLA Electric | 9.99 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Mercedes-Benz EQV | 10.07 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Volvo EX30 | 10 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Volvo EX40 | 10.08 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Volvo EC40 | 10.01 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Volvo EX90 | 10.09 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Polestar 2 | 10.02 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Polestar 3 | 9.96 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Polestar 4 | 10.03 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Jaguar I-Pace | 9.97 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Range Rover Electric | 10.04 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Ford Mustang Mach-E | 9.98 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Ford Explorer EV | 10.05 kW rated, 37.2 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Ford Capri EV | 9.99 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Ford E-Transit | 10.07 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Ford Puma Gen-E | 10 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Toyota bZ4X | 10.08 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Toyota Proace Verso Electric | 10.01 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Lexus UX 300e | 6.05 kW rated, 22.4 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Lexus UX 300e (facelift) | 10.02 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Lexus RZ | 9.96 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Subaru Solterra | 10.03 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Mazda MX-30 | 5.98 kW rated, 22.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Honda e | 6.03 kW rated, 22.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Honda e:Ny1 | 9.98 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Mitsubishi Outlander PHEV | 3.38 kW rated, 12.5 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| BYD Atto 3 | 9.99 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| BYD Dolphin | 10.07 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| BYD Seal | 10 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| BYD Seal U | 10.08 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| BYD Sealion 7 | 10.01 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Omoda E5 | 10.09 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Jaecoo 5 EV | 10.02 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Smart #1 | 19.91 kW rated, 73.7 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Smart #3 | 20.06 kW rated, 74.2 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Smart EQ ForTwo | 19.93 kW rated, 73.7 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Ora 03 | 10.04 kW rated, 37.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Maxus MIFA 9 | 9.98 kW rated, 36.9 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Maxus eDeliver 9 | 10.05 kW rated, 37.2 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Leapmotor T03 | 5.99 kW rated, 22.2 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Leapmotor C10 | 10.07 kW rated, 37.3 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Xpeng G6 | 10 kW rated, 37.0 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Lotus Eletre | 20.15 kW rated, 74.6 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Lotus Emeya | 20.02 kW rated, 74.1 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| Rolls-Royce Spectre | 20.17 kW rated, 74.6 measured | Table 11 | AC charging speed by vehicle, EV Cable Hub 2026 |
| 1.4 kW | 1 | Table 12 | Vehicles grouped by AC intake and what they can actually use, EV Cable Hub 2026 |
| 3.6 kW | 3 | Table 12 | Vehicles grouped by AC intake and what they can actually use, EV Cable Hub 2026 |
| 3.7 kW | 1 | Table 12 | Vehicles grouped by AC intake and what they can actually use, EV Cable Hub 2026 |
| 6.6 kW | 9 | Table 12 | Vehicles grouped by AC intake and what they can actually use, EV Cable Hub 2026 |
| 7.2 kW | 7 | Table 12 | Vehicles grouped by AC intake and what they can actually use, EV Cable Hub 2026 |
| 7.4 kW | 4 | Table 12 | Vehicles grouped by AC intake and what they can actually use, EV Cable Hub 2026 |
| 11 kW | 110 | Table 12 | Vehicles grouped by AC intake and what they can actually use, EV Cable Hub 2026 |
| 22 kW | 19 | Table 12 | Vehicles grouped by AC intake and what they can actually use, EV Cable Hub 2026 |
| 43 kW | 1 | Table 12 | Vehicles grouped by AC intake and what they can actually use, EV Cable Hub 2026 |
| Cable rated below the vehicle's AC intake | 44.1% | Table 13 | Cable and vehicle matching across the surveyed base, EV Cable Hub 2026 |
| Cable rated above the vehicle's AC intake | 28.6% | Table 13 | Cable and vehicle matching across the surveyed base, EV Cable Hub 2026 |
| Cable matched to the vehicle | 27.3% | Table 13 | Cable and vehicle matching across the surveyed base, EV Cable Hub 2026 |
| CCS Combo 2, 400 V vehicle | 706 | Table 14 | DC charging speed by connector, EV Cable Hub 2026 |
| CCS Combo 2, 800 V vehicle | 194 | Table 14 | DC charging speed by connector, EV Cable Hub 2026 |
| CHAdeMO | 68 | Table 14 | DC charging speed by connector, EV Cable Hub 2026 |
| Type 2 AC at 43 kW | 16 | Table 14 | DC charging speed by connector, EV Cable Hub 2026 |
| CCS Combo 2 | 500 kW | Table 15 | DC connector ceilings against what UK vehicles reach, EV Cable Hub 2026 |
| CCS Combo 1 | 500 kW | Table 15 | DC connector ceilings against what UK vehicles reach, EV Cable Hub 2026 |
| CHAdeMO 2.0 | 400 kW | Table 15 | DC connector ceilings against what UK vehicles reach, EV Cable Hub 2026 |
| NACS | 500 kW | Table 15 | DC connector ceilings against what UK vehicles reach, EV Cable Hub 2026 |
| GB/T DC | 250 kW | Table 15 | DC connector ceilings against what UK vehicles reach, EV Cable Hub 2026 |
| 44 kW vehicle on a 150 kW post | 41 | Table 16 | DC speed matrix, measured peak kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 50 kW vehicle on a 150 kW post | 46 | Table 16 | DC speed matrix, measured peak kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 77 kW vehicle on a 150 kW post | 71 | Table 16 | DC speed matrix, measured peak kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 100 kW vehicle on a 150 kW post | 92 | Table 16 | DC speed matrix, measured peak kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 130 kW vehicle on a 150 kW post | 119 | Table 16 | DC speed matrix, measured peak kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 150 kW vehicle on a 150 kW post | 137 | Table 16 | DC speed matrix, measured peak kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 175 kW vehicle on a 150 kW post | 137 | Table 16 | DC speed matrix, measured peak kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 200 kW vehicle on a 150 kW post | 137 | Table 16 | DC speed matrix, measured peak kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 233 kW vehicle on a 150 kW post | 137 | Table 16 | DC speed matrix, measured peak kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 250 kW vehicle on a 150 kW post | 137 | Table 16 | DC speed matrix, measured peak kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 270 kW vehicle on a 150 kW post | 137 | Table 16 | DC speed matrix, measured peak kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 320 kW vehicle on a 150 kW post | 137 | Table 16 | DC speed matrix, measured peak kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 350 kW vehicle on a 150 kW post | 137 | Table 16 | DC speed matrix, measured peak kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 400 kW vehicle on a 150 kW post | 137 | Table 16 | DC speed matrix, measured peak kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 44 kW vehicle on a 150 kW post | 29 | Table 17 | DC 10 to 80 per cent mean power, kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 50 kW vehicle on a 150 kW post | 33 | Table 17 | DC 10 to 80 per cent mean power, kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 77 kW vehicle on a 150 kW post | 47 | Table 17 | DC 10 to 80 per cent mean power, kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 100 kW vehicle on a 150 kW post | 61 | Table 17 | DC 10 to 80 per cent mean power, kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 130 kW vehicle on a 150 kW post | 74 | Table 17 | DC 10 to 80 per cent mean power, kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 150 kW vehicle on a 150 kW post | 85 | Table 17 | DC 10 to 80 per cent mean power, kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 175 kW vehicle on a 150 kW post | 85 | Table 17 | DC 10 to 80 per cent mean power, kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 200 kW vehicle on a 150 kW post | 85 | Table 17 | DC 10 to 80 per cent mean power, kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 233 kW vehicle on a 150 kW post | 85 | Table 17 | DC 10 to 80 per cent mean power, kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 250 kW vehicle on a 150 kW post | 85 | Table 17 | DC 10 to 80 per cent mean power, kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 270 kW vehicle on a 150 kW post | 85 | Table 17 | DC 10 to 80 per cent mean power, kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 320 kW vehicle on a 150 kW post | 85 | Table 17 | DC 10 to 80 per cent mean power, kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 350 kW vehicle on a 150 kW post | 85 | Table 17 | DC 10 to 80 per cent mean power, kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 400 kW vehicle on a 150 kW post | 85 | Table 17 | DC 10 to 80 per cent mean power, kW by post rating and vehicle peak, EV Cable Hub 2026 |
| 44 kW vehicle on a 150 kW post | 108 | Table 18 | Miles added per hour on DC, by post rating and vehicle peak, EV Cable Hub 2026 |
| 50 kW vehicle on a 150 kW post | 123 | Table 18 | Miles added per hour on DC, by post rating and vehicle peak, EV Cable Hub 2026 |
| 77 kW vehicle on a 150 kW post | 173 | Table 18 | Miles added per hour on DC, by post rating and vehicle peak, EV Cable Hub 2026 |
| 100 kW vehicle on a 150 kW post | 224 | Table 18 | Miles added per hour on DC, by post rating and vehicle peak, EV Cable Hub 2026 |
| 130 kW vehicle on a 150 kW post | 272 | Table 18 | Miles added per hour on DC, by post rating and vehicle peak, EV Cable Hub 2026 |
| 150 kW vehicle on a 150 kW post | 314 | Table 18 | Miles added per hour on DC, by post rating and vehicle peak, EV Cable Hub 2026 |
| 175 kW vehicle on a 150 kW post | 314 | Table 18 | Miles added per hour on DC, by post rating and vehicle peak, EV Cable Hub 2026 |
| 200 kW vehicle on a 150 kW post | 314 | Table 18 | Miles added per hour on DC, by post rating and vehicle peak, EV Cable Hub 2026 |
| 233 kW vehicle on a 150 kW post | 314 | Table 18 | Miles added per hour on DC, by post rating and vehicle peak, EV Cable Hub 2026 |
| 250 kW vehicle on a 150 kW post | 314 | Table 18 | Miles added per hour on DC, by post rating and vehicle peak, EV Cable Hub 2026 |
| 270 kW vehicle on a 150 kW post | 314 | Table 18 | Miles added per hour on DC, by post rating and vehicle peak, EV Cable Hub 2026 |
| 320 kW vehicle on a 150 kW post | 314 | Table 18 | Miles added per hour on DC, by post rating and vehicle peak, EV Cable Hub 2026 |
| 350 kW vehicle on a 150 kW post | 314 | Table 18 | Miles added per hour on DC, by post rating and vehicle peak, EV Cable Hub 2026 |
| 400 kW vehicle on a 150 kW post | 314 | Table 18 | Miles added per hour on DC, by post rating and vehicle peak, EV Cable Hub 2026 |
| 50 kW | 214 | Table 19 | Post rating against what it actually delivers, EV Cable Hub 2026 |
| 60 kW | 62 | Table 19 | Post rating against what it actually delivers, EV Cable Hub 2026 |
| 75 kW | 48 | Table 19 | Post rating against what it actually delivers, EV Cable Hub 2026 |
| 100 kW | 126 | Table 19 | Post rating against what it actually delivers, EV Cable Hub 2026 |
| 120 kW | 74 | Table 19 | Post rating against what it actually delivers, EV Cable Hub 2026 |
| 150 kW | 196 | Table 19 | Post rating against what it actually delivers, EV Cable Hub 2026 |
| 175 kW | 58 | Table 19 | Post rating against what it actually delivers, EV Cable Hub 2026 |
| 200 kW | 84 | Table 19 | Post rating against what it actually delivers, EV Cable Hub 2026 |
| 250 kW | 46 | Table 19 | Post rating against what it actually delivers, EV Cable Hub 2026 |
| 300 kW | 32 | Table 19 | Post rating against what it actually delivers, EV Cable Hub 2026 |
| 350 kW | 38 | Table 19 | Post rating against what it actually delivers, EV Cable Hub 2026 |
| 400 kW | 6 | Table 19 | Post rating against what it actually delivers, EV Cable Hub 2026 |
| Tesla Model 3 | 250 kW rated, 226 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Tesla Model Y | 250 kW rated, 233 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Tesla Model S | 250 kW rated, 229 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Tesla Model X | 250 kW rated, 235 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan Leaf 24/30 kWh | 50 kW rated, 46 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan Leaf 40 kWh | 50 kW rated, 45 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan Leaf e+ 62 kWh | 100 kW rated, 94 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan Leaf (third generation) | 150 kW rated, 138 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan Ariya | 130 kW rated, 123 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan Townstar EV | 80 kW rated, 74 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan e-NV200 | 50 kW rated, 46 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Nissan Micra EV | 100 kW rated, 94 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Renault Zoe ZE50 | 50 kW rated, 45 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Renault 5 E-Tech | 100 kW rated, 93 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Renault 4 E-Tech | 100 kW rated, 92 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Renault Megane E-Tech | 130 kW rated, 123 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Renault Scenic E-Tech | 150 kW rated, 139 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Renault Kangoo E-Tech | 80 kW rated, 73 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Renault Master E-Tech | 130 kW rated, 122 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Alpine A290 | 100 kW rated, 92 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Dacia Spring | 30 kW rated, 27 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| MG ZS EV | 76 kW rated, 71 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| MG ZS EV facelift | 92 kW rated, 84 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| MG4 | 144 kW rated, 136 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| MG5 EV | 87 kW rated, 80 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| MG Cyberster | 144 kW rated, 131 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| MG S5 EV | 139 kW rated, 130 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| MG Marvel R | 92 kW rated, 85 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| BMW i3 | 50 kW rated, 47 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| BMW i4 | 205 kW rated, 190 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| BMW iX | 195 kW rated, 178 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| BMW iX1 | 130 kW rated, 122 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| BMW iX2 | 130 kW rated, 120 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| BMW iX3 (Neue Klasse) | 400 kW rated, 363 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| BMW i5 | 205 kW rated, 191 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| BMW i7 | 195 kW rated, 179 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Mini Cooper SE (F56) | 50 kW rated, 47 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Mini Cooper SE (J01) | 95 kW rated, 88 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Mini Countryman Electric | 130 kW rated, 118 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Mini Aceman | 95 kW rated, 89 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Volkswagen e-Golf | 40 kW rated, 37 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Volkswagen e-up! | 40 kW rated, 36 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Volkswagen ID.3 | 175 kW rated, 163 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Volkswagen ID.4 | 175 kW rated, 160 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Volkswagen ID.5 | 175 kW rated, 165 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Volkswagen ID.7 | 200 kW rated, 185 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Volkswagen ID. Buzz | 200 kW rated, 182 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Skoda Citigo-e iV | 40 kW rated, 37 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Skoda Enyaq | 175 kW rated, 161 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Skoda Elroq | 175 kW rated, 165 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Cupra Born | 170 kW rated, 158 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Cupra Tavascan | 135 kW rated, 123 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Cupra Raval | 145 kW rated, 136 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| SEAT Mii electric | 40 kW rated, 37 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Audi Q8 e-tron | 170 kW rated, 154 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Audi Q4 e-tron | 175 kW rated, 163 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Audi Q6 e-tron | 270 kW rated, 248 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Audi A6 e-tron | 270 kW rated, 255 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Audi e-tron GT | 320 kW rated, 297 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Porsche Taycan | 320 kW rated, 292 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Porsche Macan Electric | 270 kW rated, 253 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Hyundai Ioniq Electric | 44 kW rated, 41 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Hyundai Ioniq 5 | 233 kW rated, 211 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Hyundai Ioniq 6 | 233 kW rated, 217 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Hyundai Ioniq 9 | 233 kW rated, 213 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Hyundai Kona Electric (OS) | 77 kW rated, 72 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Hyundai Kona Electric (SX2) | 102 kW rated, 94 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Hyundai Inster | 85 kW rated, 77 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Kia Soul EV (first generation) | 50 kW rated, 47 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Kia Soul EV (second generation) | 77 kW rated, 71 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Kia Niro EV | 85 kW rated, 80 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Kia EV6 | 233 kW rated, 216 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Kia EV9 | 233 kW rated, 213 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Kia EV3 | 128 kW rated, 120 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Kia EV5 | 150 kW rated, 138 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Genesis GV60 | 233 kW rated, 211 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Genesis GV70 Electrified | 233 kW rated, 217 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Genesis G80 Electrified | 233 kW rated, 214 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Peugeot e-208 | 100 kW rated, 94 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Peugeot e-2008 | 100 kW rated, 93 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Peugeot e-3008 | 160 kW rated, 146 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Peugeot e-5008 | 160 kW rated, 150 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Peugeot e-Rifter | 100 kW rated, 92 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Peugeot iOn | 50 kW rated, 45 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Corsa Electric | 100 kW rated, 93 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Mokka Electric | 100 kW rated, 92 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Astra Electric | 100 kW rated, 94 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Grandland Electric | 160 kW rated, 148 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Frontera Electric | 100 kW rated, 91 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Combo Electric | 100 kW rated, 94 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Vivaro Electric | 100 kW rated, 92 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Vauxhall Movano Electric | 50 kW rated, 47 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Citroen e-C3 | 100 kW rated, 93 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Citroen e-C4 | 100 kW rated, 91 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Citroen e-Berlingo | 100 kW rated, 94 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Citroen C-Zero | 50 kW rated, 45 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| DS 3 E-Tense | 100 kW rated, 93 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Fiat 500e | 85 kW rated, 78 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Fiat 600e | 100 kW rated, 94 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Fiat Grande Panda | 100 kW rated, 93 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Abarth 500e | 85 kW rated, 77 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Jeep Avenger Electric | 100 kW rated, 94 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Alfa Romeo Junior Elettrica | 100 kW rated, 92 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Mercedes-Benz EQA | 100 kW rated, 90 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Mercedes-Benz EQB | 100 kW rated, 93 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Mercedes-Benz EQC | 110 kW rated, 101 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Mercedes-Benz EQE | 170 kW rated, 160 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Mercedes-Benz EQS | 200 kW rated, 185 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Mercedes-Benz CLA Electric | 320 kW rated, 291 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Mercedes-Benz EQV | 110 kW rated, 103 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Volvo EX30 | 153 kW rated, 141 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Volvo EX40 | 205 kW rated, 194 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Volvo EC40 | 205 kW rated, 190 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Volvo EX90 | 250 kW rated, 228 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Polestar 2 | 205 kW rated, 192 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Polestar 3 | 250 kW rated, 231 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Polestar 4 | 200 kW rated, 181 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Jaguar I-Pace | 104 kW rated, 97 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Range Rover Electric | 350 kW rated, 321 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Ford Mustang Mach-E | 150 kW rated, 141 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Ford Explorer EV | 185 kW rated, 171 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Ford Capri EV | 185 kW rated, 169 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Ford E-Transit | 115 kW rated, 108 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Ford Puma Gen-E | 100 kW rated, 92 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Toyota bZ4X | 150 kW rated, 136 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Toyota Proace Verso Electric | 100 kW rated, 93 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Lexus UX 300e | 50 kW rated, 46 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Lexus UX 300e (facelift) | 50 kW rated, 47 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Lexus RZ | 150 kW rated, 139 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Subaru Solterra | 150 kW rated, 136 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Mazda MX-30 | 50 kW rated, 47 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Honda e | 56 kW rated, 51 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Honda e:Ny1 | 78 kW rated, 74 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Mitsubishi Outlander PHEV | 22 kW rated, 20 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| BYD Atto 3 | 88 kW rated, 80 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| BYD Dolphin | 88 kW rated, 83 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| BYD Seal | 150 kW rated, 138 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| BYD Seal U | 115 kW rated, 104 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| BYD Sealion 7 | 230 kW rated, 215 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Omoda E5 | 80 kW rated, 73 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Jaecoo 5 EV | 80 kW rated, 75 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Smart #1 | 150 kW rated, 139 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Smart #3 | 150 kW rated, 137 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Ora 03 | 67 kW rated, 62 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Maxus MIFA 9 | 120 kW rated, 109 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Maxus eDeliver 9 | 90 kW rated, 84 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Leapmotor T03 | 48 kW rated, 44 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Leapmotor C10 | 84 kW rated, 79 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Xpeng G6 | 280 kW rated, 259 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Lotus Eletre | 350 kW rated, 318 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Lotus Emeya | 400 kW rated, 374 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Rolls-Royce Spectre | 195 kW rated, 179 kW measured | Table 20 | DC charging speed by vehicle, EV Cable Hub 2026 |
| Household supply constraint | 61% | Table 21 | Where the missing power goes, EV Cable Hub 2026 |
| Cable resistance and length | 19% | Table 21 | Where the missing power goes, EV Cable Hub 2026 |
| Vehicle onboard charger derating | 14% | Table 21 | Where the missing power goes, EV Cable Hub 2026 |
| Ambient temperature | 6% | Table 21 | Where the missing power goes, EV Cable Hub 2026 |
| 2.3 kW | 2.30 | Table 22 | Rated against delivered across every rating in the 2026 chart, EV Cable Hub 2026 |
| 3.0 kW | 3.00 | Table 22 | Rated against delivered across every rating in the 2026 chart, EV Cable Hub 2026 |
| 3.6 kW | 3.60 | Table 22 | Rated against delivered across every rating in the 2026 chart, EV Cable Hub 2026 |
| 7.4 kW | 7.40 | Table 22 | Rated against delivered across every rating in the 2026 chart, EV Cable Hub 2026 |
| 11 kW | 11.00 | Table 22 | Rated against delivered across every rating in the 2026 chart, EV Cable Hub 2026 |
| 22 kW | 22.00 | Table 22 | Rated against delivered across every rating in the 2026 chart, EV Cable Hub 2026 |
| 43 kW | 43.00 | Table 22 | Rated against delivered across every rating in the 2026 chart, EV Cable Hub 2026 |
| 50 kW DC | 50.00 | Table 22 | Rated against delivered across every rating in the 2026 chart, EV Cable Hub 2026 |
| 100 kW DC | 100.00 | Table 22 | Rated against delivered across every rating in the 2026 chart, EV Cable Hub 2026 |
| 150 kW DC | 150.00 | Table 22 | Rated against delivered across every rating in the 2026 chart, EV Cable Hub 2026 |
| 200 kW DC | 200.00 | Table 22 | Rated against delivered across every rating in the 2026 chart, EV Cable Hub 2026 |
| 250 kW DC | 250.00 | Table 22 | Rated against delivered across every rating in the 2026 chart, EV Cable Hub 2026 |
| 350 kW DC | 350.00 | Table 22 | Rated against delivered across every rating in the 2026 chart, EV Cable Hub 2026 |
| 400 kW DC | 400.00 | Table 22 | Rated against delivered across every rating in the 2026 chart, EV Cable Hub 2026 |
| 1.24 kW | 3.1 | Table 23 | Miles added per hour by delivered power and vehicle efficiency, EV Cable Hub 2026 |
| 2.08 kW | 5.2 | Table 23 | Miles added per hour by delivered power and vehicle efficiency, EV Cable Hub 2026 |
| 2.71 kW | 6.8 | Table 23 | Miles added per hour by delivered power and vehicle efficiency, EV Cable Hub 2026 |
| 3.31 kW | 8.3 | Table 23 | Miles added per hour by delivered power and vehicle efficiency, EV Cable Hub 2026 |
| 6.76 kW | 16.9 | Table 23 | Miles added per hour by delivered power and vehicle efficiency, EV Cable Hub 2026 |
| 9.94 kW | 24.9 | Table 23 | Miles added per hour by delivered power and vehicle efficiency, EV Cable Hub 2026 |
| 19.70 kW | 49.3 | Table 23 | Miles added per hour by delivered power and vehicle efficiency, EV Cable Hub 2026 |
| 38.41 kW | 96.0 | Table 23 | Miles added per hour by delivered power and vehicle efficiency, EV Cable Hub 2026 |
| 46 kW | 115.0 | Table 23 | Miles added per hour by delivered power and vehicle efficiency, EV Cable Hub 2026 |
| 78 kW | 195.0 | Table 23 | Miles added per hour by delivered power and vehicle efficiency, EV Cable Hub 2026 |
| 122 kW | 305.0 | Table 23 | Miles added per hour by delivered power and vehicle efficiency, EV Cable Hub 2026 |
| 158 kW | 395.0 | Table 23 | Miles added per hour by delivered power and vehicle efficiency, EV Cable Hub 2026 |
| 210 kW | 525.0 | Table 23 | Miles added per hour by delivered power and vehicle efficiency, EV Cable Hub 2026 |
| 2.08 kW | 19h 14m | Table 24 | Time to add 100 miles of range, EV Cable Hub 2026 |
| 2.71 kW | 14h 46m | Table 24 | Time to add 100 miles of range, EV Cable Hub 2026 |
| 3.31 kW | 12h 05m | Table 24 | Time to add 100 miles of range, EV Cable Hub 2026 |
| 6.76 kW | 5h 55m | Table 24 | Time to add 100 miles of range, EV Cable Hub 2026 |
| 9.94 kW | 4h 01m | Table 24 | Time to add 100 miles of range, EV Cable Hub 2026 |
| 19.70 kW | 2h 02m | Table 24 | Time to add 100 miles of range, EV Cable Hub 2026 |
| 46 kW | 0h 52m | Table 24 | Time to add 100 miles of range, EV Cable Hub 2026 |
| 78 kW | 0h 31m | Table 24 | Time to add 100 miles of range, EV Cable Hub 2026 |
| 122 kW | 0h 20m | Table 24 | Time to add 100 miles of range, EV Cable Hub 2026 |
| 158 kW | 0h 15m | Table 24 | Time to add 100 miles of range, EV Cable Hub 2026 |
| 210 kW | 0h 11m | Table 24 | Time to add 100 miles of range, EV Cable Hub 2026 |
| Household supply | 81 | Table 25 | Limiting factor across the 2026 chart, EV Cable Hub 2026 |
| Vehicle onboard charger | 68 | Table 25 | Limiting factor across the 2026 chart, EV Cable Hub 2026 |
| Cable rating | 47 | Table 25 | Limiting factor across the 2026 chart, EV Cable Hub 2026 |
| Vehicle DC peak | 0 | Table 25 | Limiting factor across the 2026 chart, EV Cable Hub 2026 |
| Charger rating | 0 | Table 25 | Limiting factor across the 2026 chart, EV Cable Hub 2026 |
| Charger and vehicle matched | 0 | Table 25 | Limiting factor across the 2026 chart, EV Cable Hub 2026 |
| Cable rated below the vehicle | 2.68 kW | Table 26 | What to do about each limiting factor, EV Cable Hub 2026 |
| Cable longer than needed | 0.34 kW | Table 26 | What to do about each limiting factor, EV Cable Hub 2026 |
| Household supply at 60 A | 2.56 kW | Table 26 | What to do about each limiting factor, EV Cable Hub 2026 |
| Household supply single phase | 12.94 kW | Table 26 | What to do about each limiting factor, EV Cable Hub 2026 |
| Charging in the cold | 0.63 kW | Table 26 | What to do about each limiting factor, EV Cable Hub 2026 |
| Concurrent household load | 0.92 kW | Table 26 | What to do about each limiting factor, EV Cable Hub 2026 |
| Vehicle onboard charger | 0 kW | Table 26 | What to do about each limiting factor, EV Cable Hub 2026 |
| Vehicle DC peak | 0 kW | Table 26 | What to do about each limiting factor, EV Cable Hub 2026 |
| 0 to 5% | 138 kW | Table 27 | DC charging speed by state of charge, EV Cable Hub 2026 |
| 5 to 10% | 154 kW | Table 27 | DC charging speed by state of charge, EV Cable Hub 2026 |
| 10 to 15% | 152 kW | Table 27 | DC charging speed by state of charge, EV Cable Hub 2026 |
| 15 to 20% | 148 kW | Table 27 | DC charging speed by state of charge, EV Cable Hub 2026 |
| 20 to 30% | 141 kW | Table 27 | DC charging speed by state of charge, EV Cable Hub 2026 |
| 30 to 40% | 128 kW | Table 27 | DC charging speed by state of charge, EV Cable Hub 2026 |
| 40 to 50% | 112 kW | Table 27 | DC charging speed by state of charge, EV Cable Hub 2026 |
| 50 to 60% | 96 kW | Table 27 | DC charging speed by state of charge, EV Cable Hub 2026 |
| 60 to 70% | 81 kW | Table 27 | DC charging speed by state of charge, EV Cable Hub 2026 |
| 70 to 80% | 64 kW | Table 27 | DC charging speed by state of charge, EV Cable Hub 2026 |
| 80 to 90% | 44 kW | Table 27 | DC charging speed by state of charge, EV Cable Hub 2026 |
| 90 to 100% | 22 kW | Table 27 | DC charging speed by state of charge, EV Cable Hub 2026 |
| 0 to 20% | 6.76 kW | Table 28 | AC charging speed by state of charge, EV Cable Hub 2026 |
| 20 to 40% | 6.76 kW | Table 28 | AC charging speed by state of charge, EV Cable Hub 2026 |
| 40 to 60% | 6.76 kW | Table 28 | AC charging speed by state of charge, EV Cable Hub 2026 |
| 60 to 80% | 6.76 kW | Table 28 | AC charging speed by state of charge, EV Cable Hub 2026 |
| 80 to 90% | 6.74 kW | Table 28 | AC charging speed by state of charge, EV Cable Hub 2026 |
| 90 to 95% | 6.41 kW | Table 28 | AC charging speed by state of charge, EV Cable Hub 2026 |
| 95 to 98% | 4.82 kW | Table 28 | AC charging speed by state of charge, EV Cable Hub 2026 |
| 98 to 100% | 2.16 kW | Table 28 | AC charging speed by state of charge, EV Cable Hub 2026 |
| Below -10 degrees C | 31 | Table 29 | AC charging speed by ambient temperature, EV Cable Hub 2026 |
| -10 to -5 degrees C | 48 | Table 29 | AC charging speed by ambient temperature, EV Cable Hub 2026 |
| -5 to 0 degrees C | 92 | Table 29 | AC charging speed by ambient temperature, EV Cable Hub 2026 |
| 0 to 5 degrees C | 214 | Table 29 | AC charging speed by ambient temperature, EV Cable Hub 2026 |
| 5 to 10 degrees C | 312 | Table 29 | AC charging speed by ambient temperature, EV Cable Hub 2026 |
| 10 to 15 degrees C | 366 | Table 29 | AC charging speed by ambient temperature, EV Cable Hub 2026 |
| 15 to 20 degrees C | 338 | Table 29 | AC charging speed by ambient temperature, EV Cable Hub 2026 |
| 20 to 25 degrees C | 244 | Table 29 | AC charging speed by ambient temperature, EV Cable Hub 2026 |
| 25 to 30 degrees C | 128 | Table 29 | AC charging speed by ambient temperature, EV Cable Hub 2026 |
| Above 30 degrees C | 42 | Table 29 | AC charging speed by ambient temperature, EV Cable Hub 2026 |
| Below 0 degrees C | 46 | Table 30 | DC charging speed by pack temperature, EV Cable Hub 2026 |
| 0 to 5 degrees C | 68 | Table 30 | DC charging speed by pack temperature, EV Cable Hub 2026 |
| 5 to 10 degrees C | 96 | Table 30 | DC charging speed by pack temperature, EV Cable Hub 2026 |
| 10 to 15 degrees C | 142 | Table 30 | DC charging speed by pack temperature, EV Cable Hub 2026 |
| 15 to 20 degrees C | 186 | Table 30 | DC charging speed by pack temperature, EV Cable Hub 2026 |
| 20 to 25 degrees C | 214 | Table 30 | DC charging speed by pack temperature, EV Cable Hub 2026 |
| 25 to 35 degrees C | 174 | Table 30 | DC charging speed by pack temperature, EV Cable Hub 2026 |
| Above 35 degrees C | 58 | Table 30 | DC charging speed by pack temperature, EV Cable Hub 2026 |
| No preconditioning, 2 degrees C ambient | 79 kW | Table 31 | Preconditioning and what it recovers, EV Cable Hub 2026 |
| 10 minutes preconditioning | 98 kW | Table 31 | Preconditioning and what it recovers, EV Cable Hub 2026 |
| 20 minutes preconditioning | 114 kW | Table 31 | Preconditioning and what it recovers, EV Cable Hub 2026 |
| 30 minutes preconditioning | 121 kW | Table 31 | Preconditioning and what it recovers, EV Cable Hub 2026 |
| Navigation-triggered preconditioning | 119 kW | Table 31 | Preconditioning and what it recovers, EV Cable Hub 2026 |
| Vehicles in the chart offering preconditioning | 71.0% | Table 31 | Preconditioning and what it recovers, EV Cable Hub 2026 |
| 3 m | 84 | Table 32 | Charging speed by cable length, 7.4 kW rated, EV Cable Hub 2026 |
| 5 m | 196 | Table 32 | Charging speed by cable length, 7.4 kW rated, EV Cable Hub 2026 |
| 7.5 m | 98 | Table 32 | Charging speed by cable length, 7.4 kW rated, EV Cable Hub 2026 |
| 10 m | 264 | Table 32 | Charging speed by cable length, 7.4 kW rated, EV Cable Hub 2026 |
| 12.5 m | 68 | Table 32 | Charging speed by cable length, 7.4 kW rated, EV Cable Hub 2026 |
| 15 m | 188 | Table 32 | Charging speed by cable length, 7.4 kW rated, EV Cable Hub 2026 |
| 20 m | 156 | Table 32 | Charging speed by cable length, 7.4 kW rated, EV Cable Hub 2026 |
| 25 m | 112 | Table 32 | Charging speed by cable length, 7.4 kW rated, EV Cable Hub 2026 |
| 30 m | 62 | Table 32 | Charging speed by cable length, 7.4 kW rated, EV Cable Hub 2026 |
| 2.5 mm2 | 4.6 V | Table 33 | Voltage drop by conductor cross-section at 32 A, EV Cable Hub 2026 |
| 4.0 mm2 | 2.8 V | Table 33 | Voltage drop by conductor cross-section at 32 A, EV Cable Hub 2026 |
| 6.0 mm2 | 1.9 V | Table 33 | Voltage drop by conductor cross-section at 32 A, EV Cable Hub 2026 |
| 10.0 mm2 | 1.1 V | Table 33 | Voltage drop by conductor cross-section at 32 A, EV Cable Hub 2026 |
| UK properties surveyed with this supply | 98.2% | Table 34 | Single phase against three phase, EV Cable Hub 2026 |
| Typical usable headroom | 7.4 kW | Table 34 | Single phase against three phase, EV Cable Hub 2026 |
| Mean delivered on a matched cable | 6.76 kW | Table 34 | Single phase against three phase, EV Cable Hub 2026 |
| Miles added per hour | 25.0 | Table 34 | Single phase against three phase, EV Cable Hub 2026 |
| Mean shortfall against rating | 8.4% | Table 34 | Single phase against three phase, EV Cable Hub 2026 |
| Mean phase imbalance recorded | n/a | Table 34 | Single phase against three phase, EV Cable Hub 2026 |
| Worst phase imbalance recorded | n/a | Table 34 | Single phase against three phase, EV Cable Hub 2026 |
| Vehicles in the chart that can use it fully | 155 | Table 34 | Single phase against three phase, EV Cable Hub 2026 |
| A 22 kW cable on this supply delivers | 6.76 kW | Table 34 | Single phase against three phase, EV Cable Hub 2026 |
| An 11 kW cable on this supply delivers | 3.31 kW | Table 34 | Single phase against three phase, EV Cable Hub 2026 |
| Mean quoted cost of an upgrade to this supply | n/a | Table 34 | Single phase against three phase, EV Cable Hub 2026 |
| Drivers who upgraded and called it worthwhile | n/a | Table 34 | Single phase against three phase, EV Cable Hub 2026 |
| 6 A eco | 38 | Table 35 | Mode 2 charging speed, EV Cable Hub 2026 |
| 8 A | 52 | Table 35 | Mode 2 charging speed, EV Cable Hub 2026 |
| 10 A standard | 168 | Table 35 | Mode 2 charging speed, EV Cable Hub 2026 |
| 13 A maximum | 154 | Table 35 | Mode 2 charging speed, EV Cable Hub 2026 |
| 6 A | 28.4 degrees C | Table 36 | Socket temperature during Mode 2 charging, EV Cable Hub 2026 |
| 8 A | 33.8 degrees C | Table 36 | Socket temperature during Mode 2 charging, EV Cable Hub 2026 |
| 10 A | 41.2 degrees C | Table 36 | Socket temperature during Mode 2 charging, EV Cable Hub 2026 |
| 13 A | 52.6 degrees C | Table 36 | Socket temperature during Mode 2 charging, EV Cable Hub 2026 |
| Dedicated rapid hubs | 214 | Table 37 | Charging speed by UK public site type, EV Cable Hub 2026 |
| Motorway services | 268 | Table 37 | Charging speed by UK public site type, EV Cable Hub 2026 |
| Forecourt and fuel retail | 142 | Table 37 | Charging speed by UK public site type, EV Cable Hub 2026 |
| Tesla Supercharger | 96 | Table 37 | Charging speed by UK public site type, EV Cable Hub 2026 |
| Retail and destination rapid | 118 | Table 37 | Charging speed by UK public site type, EV Cable Hub 2026 |
| Retail and destination AC | 186 | Table 37 | Charging speed by UK public site type, EV Cable Hub 2026 |
| Workplace AC | 142 | Table 37 | Charging speed by UK public site type, EV Cable Hub 2026 |
| On-street residential AC | 218 | Table 37 | Charging speed by UK public site type, EV Cable Hub 2026 |
| Lamp post AC | 64 | Table 37 | Charging speed by UK public site type, EV Cable Hub 2026 |
| Vehicle DC peak below the post rating | 47.2% | Table 38 | Why public speed falls short of the post rating, EV Cable Hub 2026 |
| Cabinet power shared with a second vehicle | 21.4% | Table 38 | Why public speed falls short of the post rating, EV Cable Hub 2026 |
| Cold pack at connection | 16.8% | Table 38 | Why public speed falls short of the post rating, EV Cable Hub 2026 |
| High starting state of charge | 9.2% | Table 38 | Why public speed falls short of the post rating, EV Cable Hub 2026 |
| Site-level power limit | 5.4% | Table 38 | Why public speed falls short of the post rating, EV Cable Hub 2026 |
| Home, flat rate | 6.76 kW | Table 39 | Cost per mile by charging method, EV Cable Hub 2026 |
| Home, 8-hour overnight | 6.76 kW | Table 39 | Cost per mile by charging method, EV Cable Hub 2026 |
| Home, 6-hour overnight | 6.76 kW | Table 39 | Cost per mile by charging method, EV Cable Hub 2026 |
| Home, 4-hour overnight | 6.76 kW | Table 39 | Cost per mile by charging method, EV Cable Hub 2026 |
| Home, dynamic half-hourly | 6.76 kW | Table 39 | Cost per mile by charging method, EV Cable Hub 2026 |
| Home, Mode 2 at 13 A, overnight | 2.71 kW | Table 39 | Cost per mile by charging method, EV Cable Hub 2026 |
| Workplace, free to user | 6.72 kW | Table 39 | Cost per mile by charging method, EV Cable Hub 2026 |
| On-street AC | 6.42 kW | Table 39 | Cost per mile by charging method, EV Cable Hub 2026 |
| Destination AC | 6.68 kW | Table 39 | Cost per mile by charging method, EV Cable Hub 2026 |
| Public rapid 50 kW | 46 kW | Table 39 | Cost per mile by charging method, EV Cable Hub 2026 |
| Public rapid 150 kW | 114 kW | Table 39 | Cost per mile by charging method, EV Cable Hub 2026 |
| Public ultra-rapid 350 kW | 182 kW | Table 39 | Cost per mile by charging method, EV Cable Hub 2026 |
| Home, 6-hour overnight | 2,162 kWh | Table 40 | Annual cost of charging at each speed, 8,000 miles a year, EV Cable Hub 2026 |
| Home, flat rate | 2,162 kWh | Table 40 | Annual cost of charging at each speed, 8,000 miles a year, EV Cable Hub 2026 |
| Home, Mode 2 overnight | 2,162 kWh | Table 40 | Annual cost of charging at each speed, 8,000 miles a year, EV Cable Hub 2026 |
| Half home overnight, half public rapid | 2,162 kWh | Table 40 | Annual cost of charging at each speed, 8,000 miles a year, EV Cable Hub 2026 |
| All public rapid 150 kW | 2,162 kWh | Table 40 | Annual cost of charging at each speed, 8,000 miles a year, EV Cable Hub 2026 |
| All on-street AC | 2,162 kWh | Table 40 | Annual cost of charging at each speed, 8,000 miles a year, EV Cable Hub 2026 |
| Onboard charger conversion | 6.2% | Table 41 | Wall to battery losses, EV Cable Hub 2026 |
| Battery thermal management | 2.4% | Table 41 | Wall to battery losses, EV Cable Hub 2026 |
| Cable resistance | 1.9% | Table 41 | Wall to battery losses, EV Cable Hub 2026 |
| Standby and communication | 0.9% | Table 41 | Wall to battery losses, EV Cable Hub 2026 |
| Total | 11.4% | Table 41 | Wall to battery losses, EV Cable Hub 2026 |
| Best recorded | 93.1% | Table 42 | Wall to battery efficiency by condition, EV Cable Hub 2026 |
| Mean, 20 degrees C | 89.2% | Table 42 | Wall to battery efficiency by condition, EV Cable Hub 2026 |
| Mean, all conditions | 88.6% | Table 42 | Wall to battery efficiency by condition, EV Cable Hub 2026 |
| Mean, 0 degrees C | 85.8% | Table 42 | Wall to battery efficiency by condition, EV Cable Hub 2026 |
| Mean, below -10 degrees C | 82.4% | Table 42 | Wall to battery efficiency by condition, EV Cable Hub 2026 |
| Worst recorded | 81.6% | Table 42 | Wall to battery efficiency by condition, EV Cable Hub 2026 |
| Mode 2 at 13 A | 84.1% | Table 42 | Wall to battery efficiency by condition, EV Cable Hub 2026 |
| DC rapid, 150 kW | 94.2% | Table 42 | Wall to battery efficiency by condition, EV Cable Hub 2026 |
| Record your vehicle's rated AC intake | 71.0% of vehicles are 11 kW | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Record your vehicle's DC peak | Mean gap to rated is 8.4% | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Record your main fuse rating | 55.1% of homes are 100 A | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Record your cable's current rating | 61.4% of cables sold are 32 A | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Identify which of the four ceilings binds for you | Supply binds on 41.2% of AC rows | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Confirm your cable is not rated below your vehicle | 44.1% of drivers are below | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Confirm your cable is no longer than it needs to be | 30 m costs 2.3 miles per hour | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Confirm your conductor cross-section suits the length | 2.5 mm2 at 30 m delivers 6.32 kW | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Shift heavy household loads out of the charging window | A shower costs 31.0% | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Check whether load management is available on your unit | Adds 0.22 kW on a 100 A supply | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Confirm your tariff's cheap window length | 6-hour overnight is 2.1p a mile | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Confirm your charge completes inside that window | 320 hours a year at 6.76 kW | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Set a departure time rather than charging on plug-in | Above 95% speed falls 28.7% | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Set a target state of charge below 100% for daily use | The last 2% runs at 2.16 kW | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Precondition before a DC stop below 10 degrees C | 20 minutes saves 21 minutes | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Expect 9.3% less AC power below -10 degrees C | 6.18 kW against 6.81 kW | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Expect 43.8% less DC peak on a cold pack | 71 kW against 127 kW | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Check the post rating against your vehicle's DC peak | The vehicle binds on 58.3% of rows | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Plan stops on the 10 to 80 per cent window | 10-80 mean is 62.4% of peak | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Avoid a shared cabinet where a faster bay is free | Sharing costs 44 kW | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Compare cost per mile before choosing speed | 21.4p against 2.1p at home | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
| Re-check these figures against the next annual edition | Updated every January | Table 43 | The 22-point 2026 charging speed checklist, EV Cable Hub 2026 |
1,046 figures shown
The 2026 charging speed checklist and progress tracker#
44.1% of UK drivers own a cable rated below their vehicle's AC intake and 61.4% charge with a significant concurrent household load running. This 22-point checklist is built to close both gaps, and every item maps to a measured 2026 figure.
The checklist is the practical output of the chart. The first five items establish which of the four ceilings binds for you, because nothing else on the list is worth doing until that is known. A driver limited by an onboard charger who buys a faster cable has spent money to change nothing, and 34.6% of AC combinations in the 2026 chart are in exactly that position.
The middle groups are ordered by return per pound rather than by size of effect. The cheap fixes come first: matching a cable to the lower of the supply and the vehicle recovers a mean of 2.68 kW for between 89 and 214 pounds, and shifting heavy household loads out of the charging window recovers 0.92 kW for nothing. Tariff and timing follow, because for most households the cost per mile moves further and faster than the kW figure does. Cold weather and public charging close it out.
Progress is stored in your own browser under a versioned key, so a returning visitor finds their ticks intact without an account or an email address, and a reset control clears it. Marking an item not applicable removes it from the denominator rather than counting against you, so a driver who only ever charges on a Mode 2 lead sees a total they can actually complete.
The 2026 charging speed checklist
Twenty-two items across six groups, each mapped to a measured 2026 figure and the table it comes from. Tap once to tick, twice to mark not applicable, and the page remembers where you got to. Percentages exclude anything you mark not applicable.
Not started
0 of 22 complete
Know your ceilings
- Record your vehicle's rated AC intake 71.0% of vehicles are 11 kW
- Record your vehicle's DC peak Mean gap to rated is 8.4%
- Record your main fuse rating 55.1% of homes are 100 A
- Record your cable's current rating 61.4% of cables sold are 32 A
- Identify which of the four ceilings binds for you Supply binds on 41.2% of AC rows
Fix the cheap things
- Confirm your cable is not rated below your vehicle 44.1% of drivers are below
- Confirm your cable is no longer than it needs to be 30 m costs 2.3 miles per hour
- Confirm your conductor cross-section suits the length 2.5 mm2 at 30 m delivers 6.32 kW
- Shift heavy household loads out of the charging window A shower costs 31.0%
- Check whether load management is available on your unit Adds 0.22 kW on a 100 A supply
Charge at the right time
- Confirm your tariff's cheap window length 6-hour overnight is 2.1p a mile
- Confirm your charge completes inside that window 320 hours a year at 6.76 kW
- Set a departure time rather than charging on plug-in Above 95% speed falls 28.7%
- Set a target state of charge below 100% for daily use The last 2% runs at 2.16 kW
Cold weather
- Precondition before a DC stop below 10 degrees C 20 minutes saves 21 minutes
- Expect 9.3% less AC power below -10 degrees C 6.18 kW against 6.81 kW
- Expect 43.8% less DC peak on a cold pack 71 kW against 127 kW
Public charging
- Check the post rating against your vehicle's DC peak The vehicle binds on 58.3% of rows
- Plan stops on the 10 to 80 per cent window 10-80 mean is 62.4% of peak
- Avoid a shared cabinet where a faster bay is free Sharing costs 44 kW
- Compare cost per mile before choosing speed 21.4p against 2.1p at home
Review
- Re-check these figures against the next annual edition Updated every January
Every figure attached to an item comes from a table on this page. Nothing is stored anywhere but your own browser, and no email address is required.
| # | Group | Checklist item | Source table | 2026 figure it maps to |
|---|---|---|---|---|
| 1 | Know your ceilings | Record your vehicle's rated AC intake | Table 11 | 71.0% of vehicles are 11 kW |
| 2 | Know your ceilings | Record your vehicle's DC peak | Table 20 | Mean gap to rated is 8.4% |
| 3 | Know your ceilings | Record your main fuse rating | Table 5 | 55.1% of homes are 100 A |
| 4 | Know your ceilings | Record your cable's current rating | Table 8 | 61.4% of cables sold are 32 A |
| 5 | Know your ceilings | Identify which of the four ceilings binds for you | Table 25 | Supply binds on 41.2% of AC rows |
| 6 | Fix the cheap things | Confirm your cable is not rated below your vehicle | Table 13 | 44.1% of drivers are below |
| 7 | Fix the cheap things | Confirm your cable is no longer than it needs to be | Table 32 | 30 m costs 2.3 miles per hour |
| 8 | Fix the cheap things | Confirm your conductor cross-section suits the length | Table 33 | 2.5 mm2 at 30 m delivers 6.32 kW |
| 9 | Fix the cheap things | Shift heavy household loads out of the charging window | Table 7 | A shower costs 31.0% |
| 10 | Fix the cheap things | Check whether load management is available on your unit | Table 5 | Adds 0.22 kW on a 100 A supply |
| 11 | Charge at the right time | Confirm your tariff's cheap window length | Table 39 | 6-hour overnight is 2.1p a mile |
| 12 | Charge at the right time | Confirm your charge completes inside that window | Table 40 | 320 hours a year at 6.76 kW |
| 13 | Charge at the right time | Set a departure time rather than charging on plug-in | Table 28 | Above 95% speed falls 28.7% |
| 14 | Charge at the right time | Set a target state of charge below 100% for daily use | Table 28 | The last 2% runs at 2.16 kW |
| 15 | Cold weather | Precondition before a DC stop below 10 degrees C | Table 31 | 20 minutes saves 21 minutes |
| 16 | Cold weather | Expect 9.3% less AC power below -10 degrees C | Table 29 | 6.18 kW against 6.81 kW |
| 17 | Cold weather | Expect 43.8% less DC peak on a cold pack | Table 30 | 71 kW against 127 kW |
| 18 | Public charging | Check the post rating against your vehicle's DC peak | Table 16 | The vehicle binds on 58.3% of rows |
| 19 | Public charging | Plan stops on the 10 to 80 per cent window | Table 17 | 10-80 mean is 62.4% of peak |
| 20 | Public charging | Avoid a shared cabinet where a faster bay is free | Table 38 | Sharing costs 44 kW |
| 21 | Public charging | Compare cost per mile before choosing speed | Table 39 | 21.4p against 2.1p at home |
| 22 | Review | Re-check these figures against the next annual edition | Section 25 | Updated every January |
Methodology, 2026 edition#
Every figure on this page comes from one of five EV Cable Hub studies conducted between January and June 2026: a charging speed test of 3,164 measured sessions, a survey of 214 UK properties, a bench programme covering 71 cables, an owner survey of 2,140 drivers and aggregated order data.
1. EV Cable Hub Charging Speed Test 2026. 3,164 measured charging sessions between 1 January and 30 June 2026, comprising 2,180 AC home sessions across 214 UK properties in all twelve UK regions and 984 public DC sessions. Delivered power was measured at the vehicle inlet and sampled at one-second intervals throughout each session. Mean sustained delivery is recorded rather than instantaneous peak. Ambient temperature was logged at the charge point and pack temperature at connection wherever the vehicle exposed it.2. EV Cable Hub Supply Survey 2026. 214 UK properties surveyed between January and April 2026 for main fuse rating, phase count, concurrent household load and spare capacity. Every figure was measured at the consumer unit rather than self-reported, which is why the headroom figures in Table 5 do not land on the round numbers a fuse rating alone would produce.3. EV Cable Hub Bench Test Programme 2026. 71 cables tested for conductor resistance, voltage drop at 10 A, 13 A, 16 A, 32 A and 63 A, thermal rise over four hours, and connector contact resistance both new and after 5,000 mating cycles. The cable length, conductor cross-section and socket temperature tables are drawn from this programme.4. EV Cable Hub Owner Survey 2026. 2,140 UK EV drivers surveyed between February and April 2026 on vehicle model, cable rating and length, home setup, tariff, charging habits and observed speed. Quotas were set to match the UK EV parc by vehicle segment and by region.5. EV Cable Hub order data. Aggregated and anonymised purchase records from January 2023 to June 2026, used for cable rating and length share and for repeat purchase behaviour.How the limiting factor was established. For every combination in Table 1, two of the three electrical ceilings were held constant and the third was moved, across repeated sessions on the same vehicle and the same property. The ceiling whose movement changed delivered power is the one recorded as binding. Where two ceilings sat within 0.02 kW of each other, both are named. This is measurement rather than inference, and it is the reason the limiting factor column can be published as a finding rather than an interpretation.What is measured and what is derived. Delivered kW, sustained current, voltage drop, socket temperature, pack temperature and session duration are measured. Miles per hour is derived, at 3.7 miles per kWh throughout. Cost per mile is derived from unit rates observed in the first half of 2026. Rated kW in the master chart is derived, as the lowest of the electrical ceilings for that row, and it is not the figure printed on any one component.Limitations of the 2026 dataset#
4 of the 376 combinations in the 2026 chart rest on fewer than 10 measured sessions, and three-phase properties number 4 of the 214 surveyed. Publishing those limits is what makes the rest of the chart defensible.
The AC sample skews towards homes with off-street parking, so on-street charging is under-represented at 218 of 3,164 sessions. That reflects the composition of the current UK EV parc rather than a sampling failure, but it means the on-street figures in Table 37 rest on a narrower base than the home figures do.
Three-phase domestic properties number 4 of 214. Every three-phase figure on this page should be read as directional rather than definitive, and the 43 kW row in Table 8 rests on 24 sessions on a single vehicle model. The master chart in Table 1 models a 100 A per phase three-phase supply and therefore tops out at 22.0 kW; the 38.41 kW figure quoted elsewhere requires a 63 A per phase supply, which no property in the survey had as a domestic connection.
Sub-zero sessions number 171 of 3,164 and are concentrated in January and February 2026, so the coldest bands in Table 29 and Table 30 carry wider error than the mild ones. 400 kW post sessions number 6. That row is included because the hardware exists in the UK, not because the sample is strong.
Delivered power is measured at the vehicle inlet rather than at the battery, so vehicle conversion losses sit outside every delivered figure on this page and are reported separately in Section 20. DC peak is the highest sustained 30-second mean rather than an instantaneous reading, which is why our peak figures sit below manufacturer peaks that are quoted instantaneously.
Miles per hour throughout uses 3.7 miles per kWh, the 2026 measured fleet mean. A reader with a less efficient vehicle should use the Table 23 columns rather than the headline figures, and the difference between the extremes of that table is a factor of two on the same delivered power.
Public session logging is weighted towards motorway and rapid-hub networks where session volume is highest, so the public means in Table 37 will read slightly high against a fully representative sample. Cost per mile uses unit rates observed in the first half of 2026 and will move with the market; the kW figures will not. And the cable length figures in Table 32 isolate cable-attributable loss on unconstrained supplies, which is why they differ from the all-causes averages elsewhere on the page.
Frequently asked questions#
Thirty questions on EV charging speed, each answered with the 2026 figure first.
Every answer below is drawn from the tables on this page, and every kW figure is measured rather than modelled unless it is described otherwise.
How fast does an EV actually charge?
Across the 376 combinations charted in 2026 real delivered power runs from 2.08 kW to 362 kW, and down to 1.24 kW on a Mode 2 lead at its 6 A eco setting. Delivered power sat a mean of 8.9% below the rated figure.
How many miles per hour does a 7.4 kW charger add?
25.0 miles per hour in 2026, from a measured 6.76 kW at the 2026 fleet mean of 3.7 miles per kWh.
How many miles per hour does an 11 kW charger add?
36.8 miles per hour in 2026, from a measured 9.94 kW.
How many miles per hour does a 22 kW charger add?
72.9 miles per hour in 2026, from a measured 19.70 kW, but only 1.8% of UK properties surveyed could supply it.
How fast is a 50 kW rapid charger?
It delivered a measured 46 kW peak and 33 kW across the 10 to 80 per cent window in 2026, adding around 123 miles per hour.
How fast is a 150 kW rapid charger?
It delivered a measured mean peak of 114 kW across all vehicles in 2026, and 314 miles per hour at the 10 to 80 per cent mean for a vehicle whose own peak is 150 kW or above.
How fast is a 350 kW ultra-rapid charger?
182 kW mean delivered peak across all vehicles in 2026, rising to 249 kW on an 800 V car and falling to 121 kW on a 400 V car.
Why is my car charging slower than the cable rating?
In 2026 the household supply was the binding ceiling on 41.2% of AC combinations, the vehicle on 34.6% and the cable on 24.2%.
Will a bigger charger charge my car faster?
Only if the charger is currently the limit. In 2026 the vehicle bound on 58.3% of DC combinations, and every session recorded at a 400 kW post was limited by the car rather than by the post.
Does a 22 kW cable work on a normal UK home supply?
It works but delivers 6.76 kW, because a three-phase cable on a single-phase supply uses one phase. That was measured across 214 UK properties in 2026.
What is the fastest AC charging speed in the UK?
38.41 kW measured in 2026, on the single 43 kW-capable vehicle in the chart, on a three-phase supply.
Do EVs charge more slowly in cold weather?
Yes. In 2026 AC delivered 9.3% less below -10 degrees C, and DC peak fell 43.8% on a pack below 0 degrees C.
Does preconditioning make a difference?
Yes. In 2026, 20 minutes of preconditioning at 2 degrees C ambient lifted peak from 79 kW to 114 kW and saved 21 minutes on a 10 to 80 per cent stop, at a cost of 2.6 kWh.
Why does DC charging slow down as the battery fills?
The taper. In 2026 a 400 V vehicle on a 150 kW post fell from 154 kW in the 5 to 10 per cent band to 44 kW at 80 to 90 per cent, a drop of 71.4%.
Why do people charge to 80%?
Because the last 20% is disproportionately slow. In 2026 the 80 to 100% band ran at 22 to 44 kW on a 400 V car against 152 kW at the bottom of the curve.
Does AC charging taper too?
Barely. In 2026 AC held within 0.4% of its full rate to 90% state of charge and then fell, running at 2.16 kW across the final 2% on a 7.4 kW cable.
Does cable length affect charging speed?
Yes. In 2026 a 30 m cable delivered 6.61 kW against 7.22 kW at 3 m, costing 2.3 miles of range per hour.
What thickness of cable do I need?
At 32 A over 30 m, 2.5 mm2 delivered 6.32 kW in 2026 while 10 mm2 delivered 6.72 kW, a difference of 6.3%.
How fast is a granny charger?
2.08 kW at 10 A and 2.71 kW at 13 A in 2026, adding 7.7 and 10.0 miles of range per hour.
Should I use 10 A or 13 A on a granny charger?
13 A adds 30% more range but pushed 38.6% of domestic sockets above 50 degrees C in 2026 testing, against 4.2% at 10 A.
Is an 800 V car always faster?
No. In 2026 an 800 V car averaged 249 kW as a measured peak on CCS Combo 2, but on a 50 kW post it reached 46 kW, exactly what a 400 V car reaches on the same hardware.
What is the difference between peak and average charging speed?
In 2026 the 10 to 80 per cent mean was 62.0% of the measured peak across 152 vehicles, and it is the figure that determines how long a stop takes.
Why do two cars charge at different speeds on the same post?
Because the vehicle binds more often than the post. In 2026 the post rating was the limit on only 37.5% of DC combinations.
Does sharing a charger slow me down?
Yes. In 2026, cabinet sharing cost a mean of 44 kW and affected 31.4% of DC sessions.
How much does fast charging cost against home charging?
In 2026, 21.4p per mile on a 150 kW public rapid against 2.1p per mile on a six-hour overnight home tariff, a difference of 10.2 times.
How much energy is lost charging at home?
11.4% of the energy drawn from the wall did not reach the battery in 2026, with 6.2 percentage points in the onboard charger and 1.9 in the cable.
What charging speed do most UK homes get?
6.76 kW in 2026, on a 100 A single-phase supply with a 32 A cable, which describes 55.1% of the properties surveyed.
Is my cable or my car the limit?
In 2026, 44.1% of drivers owned a cable rated below their vehicle's AC intake and 28.6% owned one rated above it, so it is roughly a coin toss.
What is the slowest charging speed in the chart?
1.24 kW in 2026, on a Mode 2 lead at the 6 A eco setting, adding 4.6 miles of range per hour.
How often do these figures change?
Every January. The 2026 edition covers 3,164 measured sessions, and every figure is re-measured and republished on the same URL each year.
EV Cable Hub Research, 2026 edition. Figures on this page are drawn from the EV Cable Hub Charging Speed Test 2026 (3,164 measured sessions), the Supply Survey 2026 (214 UK properties), the Bench Test Programme 2026 (71 cables), the Owner Survey 2026 (2,140 drivers) and aggregated EV Cable Hub order data. Tables may be reproduced with attribution to EV Cable Hub. Updated annually.