---
title: "Charging Sessions vs New Chargers: Is Demand Outrunning the UK Network? (2026)"
url: https://evcablehub.co.uk/blogs/journal/charging-demand-vs-chargers
publisher: EV Cable Hub
author: Jake Wardle
published: 2026-11-21
updated: 2026-11-03
market: United Kingdom, prices in GBP
licence: free reuse with a followed link to the source article, https://evcablehub.co.uk/pages/research-licence
tables: 6
csv_files: 6
---

# Charging Sessions vs New Chargers: Is Demand Outrunning the UK Network? (2026)

This is the agent-readable version of [Charging Sessions vs New Chargers: Is Demand Outrunning the UK Network? (2026)](https://evcablehub.co.uk/blogs/journal/charging-demand-vs-chargers), published by EV Cable Hub on 21 November 2026 and last updated on 3 November 2026. It holds the full article text, every table as a Markdown table, the datasets behind the figures, and how to cite them. Quote figures with the page URL above, not this file.

## Summary

38% of UK EV drivers queued or found a broken charger on their last public charge in 2026. Sessions grew 31% in a year and chargers 28.4%. Where and when the pressure is worst.

## How to cite

Source: EV Cable Hub, "Charging Sessions vs New Chargers: Is Demand Outrunning the UK Network? (2026)", https://evcablehub.co.uk/blogs/journal/charging-demand-vs-chargers, updated 3 November 2026.

Online, the credit must be a followed HTML link to the article (no rel="nofollow", "sponsored" or "ugc"). Terms: https://evcablehub.co.uk/pages/research-licence

## Datasets

### Charging Sessions vs New Chargers: Is Demand Outrunning the UK Network? (2026)

UK public EV charging demand vs supply 2025 to 2026: sessions, devices, EVs per device, queue and fault rates by charger type, region, time of week and site size.

- Period covered: 2026
- Area: United Kingdom
- Variables: Sessions; Public devices; EVs per device; Queue rate; Fault rate
- Files: Table 1: Demand vs supply, 2025 to 2026 (https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-1.csv?v=1793838836); Table 2: Demand growth vs device growth by charger type (https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-2.csv?v=1793838836); Table 3: Share of logged sessions involving a wait, by day and time (https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-3.csv?v=8e41507fe3); Table 4: Charging pressure by region (https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-4.csv?v=1793838835); Table 5: Five quietest and five busiest daytime slots for public charging (https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-5.csv?v=6959bdd705); Table 6: EVs per public device if this year's growth rates continue (https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-6.csv?v=1793838836)

## Tables in this article

1. Table 1: Demand vs supply, 2025 to 2026 (https://evcablehub.co.uk/blogs/journal/charging-demand-vs-chargers#table-01), CSV https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-1.csv?v=1793838836
2. Table 2: Demand growth vs device growth by charger type (https://evcablehub.co.uk/blogs/journal/charging-demand-vs-chargers#table-02), CSV https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-2.csv?v=1793838836
3. Table 3: Share of logged sessions involving a wait, by day and time (https://evcablehub.co.uk/blogs/journal/charging-demand-vs-chargers#table-03), CSV https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-3.csv?v=8e41507fe3
4. Table 4: Charging pressure by region (https://evcablehub.co.uk/blogs/journal/charging-demand-vs-chargers#table-04), CSV https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-4.csv?v=1793838835
5. Table 5: Five quietest and five busiest daytime slots for public charging (https://evcablehub.co.uk/blogs/journal/charging-demand-vs-chargers#table-05), CSV https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-5.csv?v=6959bdd705
6. Table 6: EVs per public device if this year's growth rates continue (https://evcablehub.co.uk/blogs/journal/charging-demand-vs-chargers#table-06), CSV https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-6.csv?v=1793838836

## Article

**38%** of UK EV drivers queued or found the charger they wanted broken on their last public charge in 2026, up from 35% a year ago. Public charging sessions grew 31% in a year while the number of public devices grew 28.4%, so the network is still falling slightly behind: each device now handles 2.3% more sessions a day. Queues, not faults, are now the bigger problem.

38%

of drivers queued or hit a broken charger on their last public charge

+31% vs +28.4%

growth in sessions vs growth in public devices, 2026 vs 2025

12 minutes

average wait for drivers who queued

By the EV Cable Hub Research Team. Data: EV Driver Pulse survey of 1,000 UK EV drivers (fieldwork 1 to 12 October 2026), the EV Cable Hub Charge Log (52,400 logged public sessions, January to September 2026) and the Site Monitor (connector status at 1,180 sites every 10 minutes). Last updated November 2026. [How we worked this out](#how-we-worked-this-out)

Key findings

- **27%** of drivers queued on their last public charge, up from 19% a year ago. 21% found the charger broken, down from 23%.
- There are now **19.7** battery electric cars per public charging device, down from 20.4. Devices are being added faster than EVs, but not as fast as sessions.
- Friday between 15:00 and 18:00 is the worst slot of the week: 41.7% of logged sessions involved a wait. Tuesday overnight is the best, at 7.2%.
- Ultra-rapid chargers have the highest queue rate (34%); rapid 50kW chargers the highest fault rate (24%).
- Northern Ireland is the biggest pressure point: 47% of drivers hit a problem, with 44.8 EVs per device.
- Sites with 12 or more bays had a **13.6%** wait rate; one- and two-bay sites, 33.8%.

**Table 1: Demand vs supply, 2025 to 2026** ([view on page](https://evcablehub.co.uk/blogs/journal/charging-demand-vs-chargers#table-01))

| Measure | 2025 | 2026 | Growth |
|---|---|---|---|
| Battery electric cars | 1.56 million | 1.94 million | +24.2% |
| Public charging devices | 76,580 | 98,340 | +28.4% |
| Public sessions in the quarter | 13.4 million | 17.6 million | +31% |
| Sessions per device per day | 1.90 | 1.95 | +2.3% |
| Public sessions per driver per month | 2.86 | 3.02 | +5.8% |
| Drivers without home charging | 29% | 34% | +5 pts |
| Fleet and device counts at 30 June from the EV Cable Hub UK Electric Vehicle Market Monitor 2026 and UK Charge Point Census 2026. Sessions are for July to September (Q3). Source: EV Cable Hub Charge Log (52,400 sessions, January to September 2026), device tracker and EV Driver Pulse survey (n=1,000, October 2026). |  |  |  |

CSV: https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-1.csv?v=1793838836

### Why demand is outrunning the network

Two things are happening at once. There are more EVs, up 24.2% in a year, and each driver is charging in public more often, because more of them have no driveway: 34% of EV drivers now have no home charging, up from 29%. Sessions grew faster than either the fleet or the network.

The network is growing quickly, with 28.4% more devices in a year, but not where the extra demand is. Ultra-rapid devices grew 48.6%, yet ultra-rapid sessions grew 58%. Slow chargers, most of them on-street, grew 28.4% and their sessions 41%. Rapid and fast AC devices grew at least as fast as their sessions.

**Table 2: Demand growth vs device growth by charger type** ([view on page](https://evcablehub.co.uk/blogs/journal/charging-demand-vs-chargers#table-02))

| Charger type | Device growth | Session growth | Gap (points) | Queued on last charge | Found broken |
|---|---|---|---|---|---|
| Ultra-rapid (150kW+) | +48.6% | +58% | +9.4 | 34% | 16% |
| Rapid (50 to 149kW) | +16.6% | +12% | -4.6 | 31% | 24% |
| Fast AC (7 to 22kW) | +24.7% | +24% | -0.7 | 20% | 23% |
| Slow (below 7kW) | +28.4% | +41% | +12.6 | 16% | 22% |
| All public devices | +28.4% | +31% | +2.6 | 27% | 21% |
| Device growth in the year to 30 June 2026 from the EV Cable Hub UK Charge Point Census 2026. Source: EV Cable Hub Charge Log (52,400 sessions, January to September 2026), device tracker and EV Driver Pulse survey (n=1,000, October 2026). |  |  |  |  |  |

CSV: https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-2.csv?v=1793838836

### Queues: 12 minutes on average, longer at weekends

Drivers who queued waited 12 minutes on average, up from 9 a year ago; the median was 9 minutes, and 17% waited more than 20. 14% of all drivers gave up and went elsewhere, driving an extra 6.8 miles and losing 23 minutes on average.

In the Charge Log, 24.1% of sessions this year involved a wait, and the pattern by time of week is consistent. Friday afternoons are worst, as commuters and weekend travellers overlap, then Saturday and Sunday from midday. Overnight and early mornings are quiet every day.

**Table 3: Share of logged sessions involving a wait, by day and time** ([view on page](https://evcablehub.co.uk/blogs/journal/charging-demand-vs-chargers#table-03))

| Day | 06:00 to 09:00 | 09:00 to 12:00 | 12:00 to 15:00 | 15:00 to 18:00 | 18:00 to 21:00 | 21:00 to 06:00 |
|---|---|---|---|---|---|---|
| Monday | 12.1% | 17.4% | 22.3% | 29.8% | 24.6% | 7.9% |
| Tuesday | 11.4% | 16.2% | 20.8% | 27.9% | 22.7% | 7.2% |
| Wednesday | 11.8% | 16.9% | 21.5% | 28.6% | 23.4% | 7.5% |
| Thursday | 13.2% | 18.6% | 24.4% | 33.1% | 27.8% | 8.6% |
| Friday | 15.9% | 24.7% | 33.2% | 41.7% | 36.4% | 11.2% |
| Saturday | 9.8% | 29.4% | 35.1% | 34.6% | 27.2% | 10.4% |
| Sunday | 8.7% | 24.3% | 32.6% | 33.8% | 25.1% | 9.1% |
| Charge Log, January to September 2026. |  |  |  |  |  |  |

CSV: https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-3.csv?v=8e41507fe3

### Faults are falling, but still common

21% of drivers found the charger they wanted broken or out of service, down from 23% a year ago. Rapid 50kW chargers, many of them older units, had the highest fault rate at 24%. By network, first-attempt failures in the Charge Log ranged from 3.1% on Tesla Superchargers open to all and 3.6% on Fastned to 11.9% on Shell Recharge. Our [motorway services ranking](https://evcablehub.co.uk/blogs/journal/motorway-services-ev-charging-ranked) tested reliability site by site.

### Where the pressure is worst

**Table 4: Charging pressure by region** ([view on page](https://evcablehub.co.uk/blogs/journal/charging-demand-vs-chargers#table-04))

| Region | EVs per device, 30 June 2026 | Queued | Found broken | Queued or broken |
|---|---|---|---|---|
| Northern Ireland | 44.8 | 33% | 27% | 47% |
| East of England | 28.2 | 31% | 22% | 42% |
| Wales | 20.1 | 27% | 25% | 41% |
| South East | 26.3 | 30% | 21% | 40% |
| East Midlands | 23.9 | 30% | 21% | 39% |
| South West | 22.5 | 29% | 20% | 38% |
| West Midlands | 23.1 | 28% | 21% | 38% |
| Yorkshire and the Humber | 22.3 | 26% | 22% | 37% |
| Scotland | 23.1 | 21% | 24% | 36% |
| North West | 21.2 | 25% | 20% | 35% |
| London | 9.4 | 24% | 18% | 33% |
| North East | 20.8 | 20% | 18% | 30% |
| UK | 19.7 | 27% | 21% | 38% |
| EVs per device from the EV Cable Hub UK Charge Point Census 2026. Northern Ireland, Wales and the North East rest on sub-samples of 30 to 46 drivers. Source: EV Cable Hub Charge Log (52,400 sessions, January to September 2026), device tracker and EV Driver Pulse survey (n=1,000, October 2026). |  |  |  |  |

CSV: https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-4.csv?v=1793838835

London has the most devices for its EVs, 9.4 cars per device, and one of the lowest problem rates. Northern Ireland has nearly five times as many EVs per device and the highest rate of trouble. Scotland's problem is reliability rather than supply: 23.1 EVs per device, close to the UK average, but a 24% fault rate, behind only Northern Ireland and Wales.

### Bigger sites, shorter queues

*Figure: Chart 1: Wait rate by number of bays at the site*

41% of public sites have only one or two bays, and they carry 22% of sessions. When one bay is in use or broken there is nowhere else to go, so a third of sessions there involve a wait and sites spend 4.1% of the time with no working bay at all. Hubs with 12 or more bays rarely leave anyone waiting long.

For drivers the practical rules are simple: avoid Friday afternoons and weekend lunchtimes where you can, pick bigger sites, and on a long trip plan a backup charger for every stop. For prices at each type of charger, see our [UK Public Charging Price Index](https://evcablehub.co.uk/blogs/journal/uk-public-charging-price-index).

### The best and worst daytime slots

**Table 5: Five quietest and five busiest daytime slots for public charging** ([view on page](https://evcablehub.co.uk/blogs/journal/charging-demand-vs-chargers#table-05))

|  | Day and time | Sessions involving a wait |
|---|---|---|
| Quietest | Sunday 06:00 to 09:00 | 8.7% |
| Quietest | Saturday 06:00 to 09:00 | 9.8% |
| Quietest | Tuesday 06:00 to 09:00 | 11.4% |
| Quietest | Wednesday 06:00 to 09:00 | 11.8% |
| Quietest | Monday 06:00 to 09:00 | 12.1% |
| Busiest | Friday 15:00 to 18:00 | 41.7% |
| Busiest | Friday 18:00 to 21:00 | 36.4% |
| Busiest | Saturday 12:00 to 15:00 | 35.1% |
| Busiest | Saturday 15:00 to 18:00 | 34.6% |
| Busiest | Sunday 15:00 to 18:00 | 33.8% |
| Excludes overnight, which is quietest every day. From Table 3. Source: EV Cable Hub Charge Log, January to September 2026. |  |  |

CSV: https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-5.csv?v=6959bdd705

If you can choose, early weekend mornings are the easiest daytime charge of the week: Sunday before 09:00 has a 8.7% wait rate, less than a quarter of Friday teatime. Weekday mornings are nearly as good. The busiest slots all sit between midday on Friday and Sunday afternoon.

### If nothing changes

**Table 6: EVs per public device if this year's growth rates continue** ([view on page](https://evcablehub.co.uk/blogs/journal/charging-demand-vs-chargers#table-06))

| At 30 June | Battery electric cars | Public charging devices | EVs per device |
|---|---|---|---|
| 2026 | 1.94 million | 98,340 | 19.7 |
| 2027 | 2.41 million | 126,269 | 19.1 |
| 2028 | 2.99 million | 162,129 | 18.5 |
| Projection: EVs grow 24.2% and devices 28.4% a year, as in the 12 months to 30 June 2026. Fleet and device counts at 30 June from the EV Cable Hub UK Electric Vehicle Market Monitor 2026 and UK Charge Point Census 2026. |  |  |  |

CSV: https://evcablehub.co.uk/cdn/shop/files/evch-charging-demand-vs-chargers-table-6.csv?v=1793838836

At this year's growth rates the ratio falls from 19.7 to about 18.5 EVs per device by 2028. That looks like the network catching up, but sessions are growing faster than the fleet, because more drivers have no driveway. Even with cars per device falling, queues rose sharply this year: from 19% to 27% of drivers in twelve months.

Bigger hubs are the fix the data points to. Adding bays at an existing busy site cuts queues far more than adding a single device somewhere new, because a driver at a 12-bay site almost always finds one free.

### How to avoid a queue

Check live status in the operator's app before you commit to a stop, and have a second site in mind within 10 miles. Arrive with 20% or more rather than 5%, so a full site is a nuisance rather than a problem. On ultra-rapid chargers, stop at about 80%: charging slows sharply after that, and the last 20% can take as long as the first 60%.

Where you can charge at home or work, do it, and keep public rapid charging for journeys. 34% of EV drivers now have no home charging, and they are the ones queues hurt most.

### How we worked this out

The EV Driver Pulse survey questioned 1,000 UK EV drivers about their last public charge between 1 and 12 October 2026, with October 2025 comparisons from the same questions a year earlier. The EV Cable Hub Charge Log holds 52,400 public charging sessions logged by drivers between January and September 2026, including whether they had to wait. The Site Monitor recorded connector status at 1,180 public sites every 10 minutes in Q3 2026 and Q3 2025. Fleet and device counts are at 30 June, from the [EV Cable Hub UK Electric Vehicle Market Monitor 2026](https://evcablehub.co.uk/blogs/journal/uk-ev-market-statistics) and the [UK Charge Point Census 2026](https://evcablehub.co.uk/blogs/journal/how-many-ev-charging-points-uk).

### Charging demand: your questions answered

**Q: Are EV charging queues getting worse in the UK?**

Yes. 27% of UK EV drivers queued on their last public charge in October 2026, up from 19% a year earlier, and the average wait rose from 9 to 12 minutes.

**Q: How many EVs are there per public charger in the UK?**

19.7 battery electric cars per public charging device at 30 June 2026, down from 20.4 a year earlier. London has 9.4; Northern Ireland 44.8.

**Q: When is the busiest time to charge an EV?**

Friday between 15:00 and 18:00, when 41.7% of logged sessions in 2026 involved a wait. Weekend lunchtimes are next. Tuesday overnight was the quietest slot at 7.2%.

**Q: How often are public EV chargers broken?**

21% of UK drivers found the charger they wanted broken or out of service on their last public charge in 2026, down from 23% in 2025. Rapid 50kW chargers had the highest fault rate, 24%.

**Q: Is public charging growing faster than the number of chargers?**

Yes, just. Public sessions grew 31% between Q3 2025 and Q3 2026, while public devices grew 28.4% in the year to 30 June 2026.

**Q: When is the best time to use a public EV charger?**

Overnight is quietest every day. In the daytime, Sunday before 09:00 had the lowest wait rate in our Charge Log, 8.7% of sessions, against 41.7% on Friday between 15:00 and 18:00.

**Q: Is the UK charging network keeping up with EVs?**

Not quite. Public devices grew 28.4% in the year to 30 June 2026, faster than battery electric cars (24.2%), but public sessions grew 31%, so queues rose. There are now 19.7 battery electric cars per public device.

Further reading

- [UK Public Charging Price Index](https://evcablehub.co.uk/blogs/journal/uk-public-charging-price-index)
- [Motorway services EV charging ranked](https://evcablehub.co.uk/blogs/journal/motorway-services-ev-charging-ranked)
- [Christmas getaway survey](https://evcablehub.co.uk/blogs/journal/christmas-getaway-ev-survey)
